AS PUBLISHED Minor Change Existing Approval 51983 3225 19 (1) · 51983.3225.19
SD1.4 A Level 2 Floor Plan prepared by Sparks Architects 31.07.2023
SD1.5 A Level 3 Floor Plan prepared by Sparks Architects 31.07.2023
SD1.6 A Roof Level Plan prepared by Sparks Architects 31.07.2023
SD1.7 A North Elevation prepared by Sparks Architects 31.07.2023
SD1.8 A East Elevation prepared by Sparks Architects 31.07.2023
SD1.9 A South Elevation prepared by Sparks Architects 31.07.2023
SD1.10 A West Elevation prepared by Sparks Architects 31.07.2023
SD1.11 A Section A prepared by Sparks Architects 31.07.2023
SD1.12 A Section B prepared by Sparks Architects 31.07.2023
SD1.13 A Section C prepared by Sparks Architects 31.07.2023
3 Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council prior to
obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site for
pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with the
proposed construction works that need to be onsite or in proximity to the site at
any time during the phases of the construction works. Where relevant, time slots
and off-peak hours should be indicated. All efforts must be made to prevent or
minimise adverse impact on public parking availability in the local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the final
Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
e. Protection fencing for existing landscaping and trees in proximity to the work activities.
f. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures to prevent silt and contaminants from entering existing stormwater
system.
g. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
Page 8 of 18
Document Set ID: 23327583
Version: 5, Version Date: 01/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AS PUBLISHED Minor Change Existing Approval 51983 3225 19 (1).pdfRelated documentApplication case desk ↗
About this file
- File size
- 209 KB (small file)
- File type
No other editions are linked here.