Please note: 1 April to 30 June 2026 — Minor Disruption: 17 detailed rows versus 16 in the introductory summary. This chart counts the detailed rows.
Please note: 1 April to 30 June 2026 — On Track: 52 detailed rows versus 53 in the introductory summary. This chart counts the detailed rows.
Published progress observations by Reported progress
Published progress observations
Each initiative listed in the selected operational-plan reports is counted once per report. Progress follows Council’s own descriptions; different reporting periods are kept separate. Select a bar to inspect its records.
Tenders have been issued for two work packages including Black Mountain Road and Nandroya Road. Remaining packages will be two for drainage structures, one for roads and one for Black Pinch Rd. These will be issued for tender within the nex
The dashboard has been developed and successfully tested, with the intention of being made publicly available. The current project work focus is on refining the public-facing explanatory information to support broader community understandin
Phase 1 Community Engagement Plan completed. Draft ICMP developed and will be released for Stage 2 of the Community Engagement Plan on 19 July. Minister Powell has indicated potential attendance at next community workshop.
The fuel reduction and planned burns program has progressed well this year with over half of the activities conducted for the calendar. Training and accreditation have occurred for Council staff and Kabi Kabi Land & Sea Rangers through a jo
The disaster preparedness program has been substantial: Ongoing engagement with Hastings Street Association regarding the Noosa Main Beach Sea Wall Disaster Resilience project. Attendance and presentation at the Sunshine Coast District Heal
The ongoing program is progressing as planned. All Bushcare Groups are working though their annual work plans with the groups. A new Bushcare Group at Cudgerie in Cooroy has been established. The review of the Bushland Care Guideline has be
The Draft Biosecurity Plan has been developed with targeted partner and stakeholder feedback incorporated. The Draft Plan will be released for broad community consultation in July with the final draft document presented to Council shortly a
The new Changing Places Facility is under construction and temporary stabilistation of Gympie Terrace Revetment Wall has been completed with ultimate design works in line with the Masterplan now underway. Asset renewals continue in line wit
This is an annual implementation program. Works are progressing as planned to deliver resilient ecosystems, community education, and upgraded infrastructure. Additional grant funding has been secured for ecosystem works along the eastern be
On track for the annual program to deliver community education and remedial works to the Noosa River Esplanade and other emerging localities within annual budget. Various investigations and inspections of reported locations. These investiga