Skip to the record
Accept no imitations.

Council archive · source document

DILGP_Concurrence agency response With conditions_SDA-0616-030855 · OPW16/0016

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Our reference:          SDA-0616-030855
Your reference:         MLEWIS:OPW16/0016
Applicant reference:    15253


25 July 2016

Brett de Chastel
The Chief Executive Officer
Noosa Shire Council
PO Box 141
TEWANTIN QLD 4565
Email: [email protected]



Dear Mr de Chastel

Concurrence agency response—with conditions
2 Parkyn Court, Tewantin QLD 4565; Lot 388 on MCH839039; Lot 400 on MCH839039;
Lot 178 on MCH5169
(Given under section 285 of the Sustainable Planning Act 2009)


The referral agency material for the development application described below was received
by the Department of Infrastructure, Local Government and Planning under section 272 of
the Sustainable Planning Act 2009 on 13 June 2016.

Applicant details
Applicant name:                    Quadrant Holdings Pty Ltd C/- Project Urban
Applicant contact details:         PO Box 6380
                                   MAROOCHYDORE BC QLD 4558
                                   [email protected]

Site details
Street address:                    2 Parkyn Court, Tewantin QLD 4565
Lot on plan:                       Lot 388 on MCH839039; Lot 400 on MCH839039;
                                   Lot 178 on MCH5169
Local government area:             Noosa Shire Council




Page 1                                                               SEQ North Region
                                                                     Level 8, Mike Ahern Building
                                                                     12 First Avenue
                                                                     PO Box 1129 Maroochydore QLD 4558
Full text of the other 11 pages

Page 2

                                                                                                 SDA-0616-030855



Application details
Proposed development:                     Development Permit for Operational Works – Prescribed
                                          Tidal Works (Deck)

Aspects of development and type of approval being sought


     Nature of                    Approval                    Brief Description of            Level of
    Development                    Type                             Proposal                Assessment
 Operational Work              Development            Prescribed Tidal Works -         Code Assessment
                               Permit                 Deck



Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger                  Schedule 7, Table 2, Item 13—Tidal works, or development in a
                                  coastal management district
                                  Schedule 7, Table 2, Item 15—Tidal works, or development in a
                                  coastal management district
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.

Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.

Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.


Drawing Title                     Prepared by                      Date          Reference no.    Version
Development Permit for Operational Works (Prescribed Tidal Works)
General arrangement               International Marina             30/11/2015    4901-101         -
and elevation                     Consultants
Deck setout                       International Marina             30/11/2015    4901-103         -
                                  Consultants
Pile layout and profile           International Marina             2/12/2015     4901-104         -
                                  Consultants
Demolition plan                   International Marina             4/12/2015     4901-107         -
                                  Consultants

A copy of this response has been sent to the applicant for their information.


Department of Infrastructure, Local Government and Planning                                      Page 2

Page 3

                                                                                  SDA-0616-030855



For further information, please contact Lauren Higgins, Planning Officer, SARA SEQ North on
3882 8407, or email [email protected] who will be pleased to assist.

Yours sincerely




Garth Nolan
Manager (Planning)

cc:       Quadrant Holdings Pty Ltd C/- Project Urban, [email protected]

enc:      Attachment 1—Conditions to be imposed
          Attachment 2—Reasons for decision to impose conditions
          Attachment 3—Approved Plans and Specifications




Department of Infrastructure, Local Government and Planning                       Page 3

Page 4

                                                                                    SDA-0616-030855




Our reference:              SDA-0616-030855
Your reference:             MLEWIS:OPW16/0016
Applicant reference:        15253

Attachment 1—Conditions to be imposed


No.     Conditions                                                            Condition timing
Development Permit for Operational Works – Prescribed Tidal Works (Deck)

7.2.13 Tidal works, or development in a coastal management district—Pursuant to section
255D of the Sustainable Planning Act 2009, the chief executive administering the Act
nominates the Director-General of the Department of Environment and Heritage Protection to
be the assessing authority for the development to which this development approval relates for
the administration and enforcement of any matter relating to the following conditions:

1.      The development must be carried out generally in accordance with      For the duration of
        the following plans:                                                  the works
           -   General arrangement and elevation, prepared by International
               Marina Consultants, dated 30/11/2015, reference 4901-101
           -   Deck setout, prepared by International Marina Consultants,
               dated 30/11/2015, reference 4901-103
           -   Pile layout and profile, prepared by International Marina
               Consultants, dated 2/12/2015, reference 4901-104
           -   Demolition plan, prepared by International Marina
               Consultants, dated 4/12/2015, reference 4901-107

2.      Erosion and sediment control measures are to be installed and         For the duration of
        maintained to prevent the release of sediment to tidal waters.        the works the
                                                                              subject of this
                                                                              approval

3.      Submit “As Constructed drawings” to [email protected] or mail       Within two (2)
        to:                                                                   weeks of the
                                                                              completion of the
        Department of Environment and Heritage Protection
                                                                              works
        Permit and License Management
        Implementation and Support Unit
        GPO Box 2454
        Brisbane Qld 4001

4.      As a result of works the subject of this approval any disturbed or    For the duration of
        oxidised acid sulphate soil must be treated and managed in            the works the
        accordance with the current Queensland Acid Sulfate Soil              subject of this
        Technical Manual: Soil management guidelines, prepared by the         approval
        Department of Science, Information Technology, Innovation and
        the Arts, 2014.




Department of Infrastructure, Local Government and Planning                           Page 4

Page 5

                                                                                      SDA-0616-030855




No.     Conditions                                                              Condition timing

7.2.15 Tidal works, or development in a coastal management district—Pursuant to section
255D of the Sustainable Planning Act 2009, the chief executive administering the Act
nominates the Director-General of the Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:

5.      The development must be carried out generally in accordance with        For the duration of
        the following plans:                                                    the works
             -     General arrangement and elevation, prepared by
                   International Marina Consultants, dated 30/11/2015,
                   reference 4901-101

6.       (a) Provide written notice to:                                         (a) At least two
                                                                                    (2) weeks
                 Regional Harbour Master (Brisbane)
                                                                                    prior to the
                 Maritime Operations Base
                                                                                    commenceme
                 MacArthur Avenue East
                                                                                    nt of works.
                 Pinkenba QLD 4008
                                                                                (b) Within two (2)
                 when the development authorised under this approval is
                                                                                    weeks of the
                 scheduled to commence.
                                                                                    completion of
                 Each notice must state this application number, the location       works.
                 and name of registered place and the condition number
                 under which the notice is being given.
         (b) Provide written notice to:
                 Regional Harbour Master (Brisbane)
                 Maritime Operations Base
                 MacArthur Avenue East
                 Pinkenba QLD 4008
                 when the development authorised under this approval has
                 been completed.
                 Each notice must state this application number, the location
                 and name of registered place and the condition number
                 under which the notice is being given.

7.      All vessels, structures, plant and equipment associated with the        While the works
        construction of the approved works must be lit/marked in                are occurring.
        accordance with the following specifications and requirements
        such that undertaking the construction works does not cause a risk
        to the safe navigation of ships:
         (a) Any anchors deployed must be marked with yellow buoys
             and fitted with FL yellow lights.
        Lighting provided must not obscure, disguise or otherwise
        interfere with the effectiveness of navigational lighting.

8.       (a) Any debris or similar obstruction encountered whilst               While the works
             undertaking the work must be disposed of at the applicant’s        are occurring.
             cost.
         (b) All piles and/or structures to be demolished, both above and




Department of Infrastructure, Local Government and Planning                             Page 5

Page 6

                                                                                  SDA-0616-030855




No.     Conditions                                                         Condition timing
           below the waterline must be completely extracted/removed.

9.      The construction, operation or maintenance of the structure, and   At all times
        any ship moored at this structure, must not impede the safe
        navigation of other ships or restrict safe access to or from
        neighbouring structures.




Department of Infrastructure, Local Government and Planning                         Page 6

Page 7

                                                                                   SDA-0616-030855




Our reference:              SDA-0616-030855
Your reference:             MLEWIS:OPW16/0016
Applicant reference:        15253

Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are:
    To ensure the development is carried out generally in accordance with the plans of
     development submitted with the application.
    To ensure the development avoids or minimises adverse impacts on coastal resources
     and their values.
    To allow for compliance in relation to what is considered generally in accordance with
     the approved plans when preliminary plans are submitted with the application.
     Development inconsistent with the approval may have an impact on coastal
     management that was not considered in assessment.
    To ensure any disturbance to acid sulphate soils is managed to prevent impacts to
     coastal environments.
    To facilitate the monitoring of the development works for compliance purposes.
    To ensure that at all times, all lights on or above the development site do not interfere
     with safe navigation in surrounding waterways.
    To ensure the development does not encroach on the navigable waterway in a way that
     impedes the safe passage of vessels.




Department of Infrastructure, Local Government and Planning                          Page 7

Page 8

                                                              SDA-0616-030855




Our reference:              SDA-0616-030855
Your reference:             MLEWIS:OPW16/0016
Applicant reference:        15253

Attachment 3—Approved plans and specifications

This page has been left intentionally blank




Department of Infrastructure, Local Government and Planning    Page 8

Page 9

 

NEW CONCRETE
SLAB

EXISTING CONCRETE
SLAB

LOWER DECK RL. +137m AHO

 

=} \

il int i tt

Il HI ot tl i
ll
u u Hy I I

0 5

2, +. +. 4b 7b 7b =
MA

cu Li WA HH tl tl Hi Hil ll tA tH ill

401
MCH839039

— PROPOSED DECK EXTENSION

48660

2, 7. *L =L zk =

4L *L -L 2L ee 2k Zk =

i

cc

 

NOTES.

4, FOR GENERAL NOTES REFER TO ORAWING 4901-100.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNO.

3, BASE DRAWING FROM HARBOUR TOWN SITE PLAN 14/01/2005
AND SURVEY PLAN FROM JONES FLINT & PIKE DRAWING No M1994-01,

4, PROPOSED DECK AREA 409m? APPROX,
NEW CONCRETE SLAB AREA 285m" APPROX.

 

~ S\= UPPER DECK RL. +2.2m AHD

tT OAR +0.55m AHD
} oT

   

 

 

 

 

 

| 1 foMnws. *0.27m AHO

// MSL +0.04m AHD
MLWS. -0.14m AHD
LAT. -0.34m AHD

 

 

 

 

 

AAAS TH
HI I Il ll
Hl Ul ll lI
I i ll I
ll I I

NORTH ELEVATION

10 G 20

 

 

 

 

25m

 

FOR APPROVAL

Ht \z ‘AT. -0:
i \ Bed LEVEL -157m AHD APPROX.

 

st toa

 

¢
J. M. CEMAN
REGISTERED PROFESSIONAL ENGINEER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1: 250 (A3) OF QUEENSLAND NUMBER : 2938
| nternational Cllent: Title: Revision: Date: 30/11/2015
M } NOOSA MARINA GENERAL ARRANGEMENT Drawing No.: 4901-101
arina AND ELEVATION Scale: 4: 250 (A3)
Consultants ae Drawn By:

Consultants fo the Marina industry. | NOOSA HARBOUR MARINE VILLAGE —_
International Marina ANDERLEY QLD 4103 NORTHERN DECK EXTENSION .
Consultants Pty. Lid. Prone (073892571 be ued or heat Approved By:

A.C.N. 079 905 481 Fax (07138925611 the written permission of
Email : inc@mc: International Marina Consultants

 

 

Page 10

 

NOTES.

| FOR GENERAL NOTES REFER TO ORAWING 4901-100.

1
2. BASE DRAWING FROM HARBOUR TOWN SITE PLAN 14/01/2005
AND SURVEY PLAN FROM JONES FLINT & PIKE DRAWING No M1994-01,

eee ~\ 3, PROPOSED DECK AREA 409m? APPROX. NEW CONCRETE SLAB
_——

 

   

ate y Woon , AREA 285m? APPROX,
2964 \gASe SOE - ‘
020m 4 aa _ Benn — \
erase Bs: : 280° 0° 3° aro ;
p Behe 401 ;
NEW CONCRETE SLAB LZ McHB39039 \
} i 49.487m \
/ ‘08° 9° 14” \
ae
EXISTING CONCRETE SLAB SE wlge \
aN foam Z/ SQN gp
0 0 Sax 7 \ 2
FSae . &
40 > ‘
MCHE39 fo ae \

fe EL ML A -

==> \ EL? OC”

— C7 \/ 156° 54° 25
L/D ‘ \
aa,
=> A
SS 7

a KH EXISTING FLOATING STRUCTURE
~— <4 TO BE REMOVED

-f \s,

™ \3,
B,

\

 

0 5 0 & 20 25m
SSE SS EES)

SCALE 1: 250 (A3) A

 

J, M. LEMAN

REGISTERED PROFESSIONAL ENGINEER
FOR APPROVAL OF QUEENSLAND NUMBER : 2938

 

 

 

 

 

 

 

 

 

. Client: Title: Revision: Date: 30/11/2015
International NOOSA MARINA DECK SETOUT Drawing No-t 4994-403
Marina Scale:
Consultants — —_
Project: Drawn By: TAS.

Consultants to the Marina Industry. NOOSA HARBOR MARINE VILLAGE

 

Designed By:

 

 

International Marina NWEMEY LO 43 NORTHERN DECK EXTENSION
AUSTRALIA This plan Is copyright and cannot

Consultants Pty. Ltd.

none (07138925711 be used duced without Approved By:

A.C.N. 079 905 481 Fax (oMaEgREEtT © the written permission of proved By
Email : [email protected] International Marina Consultants

 

 

 

 

 

 

 

Page 11

 

TOP OF PILE REFER SCHEDULE

/ HAT. +4,06m AHD
/ MHWS. +0.62m AHD

~

MSL. +0.04m_AHD
\LgMLWS. -0.t4m AHD
LAT. -0.34m AHD

BED LEVEL VARIES

—SSS—SSSSSSg

 

 

NOTES.

4, FOR GENERAL NOTES REFER TO DRAWING No. 4904-100.
2, PILES
- TOLERANCE FOR DRIVING IN PLAN +/- SO mm,
MEASURED AS THE WORST COMBINATION OF PLAN
DEVIATION AND OUT OF PLUMB OVER FULL TIDAL RANGE.
VERTICAL = 1 IN 200 MAX QUT OF PLUMB.

3, CONTRACTOR TO ADVISE ENGINEER IF BED LEVEL DIFFERS
FROM THE DESIGNED LEVELS BY MORE THAN 300mm.

4, ALL DIMENSIONS ARE IN MILLIMETRES UNO.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRS Hl TRITITS
II
Bg, OU PILE SCHEDULE
za) pu] DESIGN MMM | PLE
ae | Wo, | BED LEVEL PLE SIZE EMBEDMENT | TOP LEVEL
(m AHD) (m {m AHD)
I A |-050 TO -157 203 x 8 WALL THICKNESS FRP PILE 4.0 +199
tl B 0.0 TO -050 203@ x 8 WALL THICKNESS FRP PILE 40 +116
PILE PROFILE
SCALE 1: 100
§2082 6790
3360, 350033401290, 400 ——" mE
| | [-P_1e._—| rl __
8 | 7 - 2 °o o ll ° ° o °o o o °o oO °o 8
all « B Bo UB A A A A A A A A A A A oS
3] 8 » A 3
| B B B 8 2
§ A A | A A A A A A A A A A
8
2980 |
PILE LAYOUT
SCALE 1; 200
Zz
J. M. LEMAN
REGISTERED PROFESSIONAL ENGINEER
FOR APPROVAL OF QUEENSLAND NUMBER : 2938
Date:
| nternational a Titles Revision: 2/12/2015
Mari NOOSA MARINA PILE LAYOUT AND PROFILE Drawing NOx gao1 194
arina Soalet
. AS SHOWN
Consuttants Project: Drawn By:
Consultants to the Marina Industry. NOOSA HARBOUR MARINE. VILLAGE TJS.
Intrnatlona Marina ween =| NORTHERN DECK EXTENSION ——__ Destaned By:
onsultants '° je AUSTRALIA Is plan Is copyright and canno’
ACN. 079 905 ai PET, Ce) fe Sa! carectee! pte | Approved Bp
Email : International Marina Consultants

 

 

 

 

 

 

 

Page 12

 

__LEASE BOUNDARY _

 

cA -- — ares ws se ee as —— --
\ HANDRAILING, SECURITY FENCING 400
\ AND GATE §0H839039
\ [ GANGWAY AND FITTINGS PONTOONS
x TP

NOTES.

4, FOR GENERAL NOTES REFER TO DRAWING 4901-100.

2, ALL EXISTING HANDRAILS, SECURITY FENCING AND GATE, GANGWAY,
PONTOONS, PILES AND PONTOON RESTRAINTS TO BE REMOVED

LEGEND:

——__ 70 BE REMOVED

 

 

 

 

 

 

 

 

|
L

 

 

 

0

 

5 0 6 20

25m

 

SCALE 1: 250 (A3)

FOR APPROVAL

 

 

se
J. M. CEMAN

REGISTERED PROFESSIONAL ENGINEER
OF QUEENSLAND NUMBER : 2938

 

 

 

 

 

| nternational

M arina

Consultants

Consultants to the Marina Industry.
473 Amertey Road
ANNERLEY OLD 4103
AUSTRALIA

Phone (07138925711
Fax (0738925611
Ema: inc@ime

International Marina
Consultants Pty. Ltd.

A.C.N. 079 905 481

 

Client:

NOOSA MARINA

 

Project:

NOOSA HARBOUR MARINE VILLAGE
NORTHERN DECK EXTENSION

 

 

Title:

DEMOLITION PLAN

a= 4/12/20

Revision:

 

Drawing No.: 4901-107

 

Seal: 1; 250 (AD)

 

Drawn By: TJS

 

Designed By:

 

 

 

This plan [s copyright and cannot

be used or reproduced without Approved By:
the written permission of
Internatlonal Marina Consultants

 

 

 

Used in these records

About this file

File size
604 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DILGP_Concurrence agency response With conditions_SDA-0616-030855.pdf · 604 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.