                                                                                    SDA-0616-030855




Our reference:              SDA-0616-030855
Your reference:             MLEWIS:OPW16/0016
Applicant reference:        15253

Attachment 1—Conditions to be imposed


No.     Conditions                                                            Condition timing
Development Permit for Operational Works – Prescribed Tidal Works (Deck)

7.2.13 Tidal works, or development in a coastal management district—Pursuant to section
255D of the Sustainable Planning Act 2009, the chief executive administering the Act
nominates the Director-General of the Department of Environment and Heritage Protection to
be the assessing authority for the development to which this development approval relates for
the administration and enforcement of any matter relating to the following conditions:

1.      The development must be carried out generally in accordance with      For the duration of
        the following plans:                                                  the works
           -   General arrangement and elevation, prepared by International
               Marina Consultants, dated 30/11/2015, reference 4901-101
           -   Deck setout, prepared by International Marina Consultants,
               dated 30/11/2015, reference 4901-103
           -   Pile layout and profile, prepared by International Marina
               Consultants, dated 2/12/2015, reference 4901-104
           -   Demolition plan, prepared by International Marina
               Consultants, dated 4/12/2015, reference 4901-107

2.      Erosion and sediment control measures are to be installed and         For the duration of
        maintained to prevent the release of sediment to tidal waters.        the works the
                                                                              subject of this
                                                                              approval

3.      Submit “As Constructed drawings” to [email protected] or mail       Within two (2)
        to:                                                                   weeks of the
                                                                              completion of the
        Department of Environment and Heritage Protection
                                                                              works
        Permit and License Management
        Implementation and Support Unit
        GPO Box 2454
        Brisbane Qld 4001

4.      As a result of works the subject of this approval any disturbed or    For the duration of
        oxidised acid sulphate soil must be treated and managed in            the works the
        accordance with the current Queensland Acid Sulfate Soil              subject of this
        Technical Manual: Soil management guidelines, prepared by the         approval
        Department of Science, Information Technology, Innovation and
        the Arts, 2014.




Department of Infrastructure, Local Government and Planning                           Page 4

Used in these records

About this file

File size
604 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DILGP_Concurrence agency response With conditions_SDA-0616-030855.pdf · 604 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.