Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Decision Notice - Minor Change - RAL21 0026 01 & OPW21 0303 01 [As Published] · RAL21/0026.01

of 10

Text shows just the words. Original shows the document exactly as it was published.

               FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
                      Certification
               48.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
                      Final Inspection
               49.    A final inspection and approval of the works and completed reinstatement works by Council’s
                      Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection.
               5.     REFERRAL AGENCIES

                Referral Status        Referral Agency and Referral Trigger                Response
                                       Address
                Concurrence            SARA at DILGP SARA        Schedule 10, Part 4,      The agency provided
                                       at DILGP Via MyDAS2       Division 3, Table 1       its response on 12
                                       at https://prod2.dev-     (Planning Regulation      November 2021
                                       assess.qld.gov.au/suite   2017): Premises           (Reference No. 2111-
                                       / (for assistance,        contaminated because of   25753 SRA. A copy of
                                       contact DILGP at 5352     unexploded ordnance       the response is
                                       9701 or                                             attached.
                                       email:[email protected]

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      General Advisory Notes
               2.     As these driveways are private structures, the owner bears full responsibly for the standard
                      of its construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed generally in accordance with standard drawings RS-
                      049 and RS-050.
               3.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               4.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               5.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.




                                                                                                    Page 7 of 10
Document Set ID: 22711882
Version: 4, Version Date: 01/12/2023

Used in these records

About this file

File size
171 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - RAL21 0026 01 & OPW21 0303 01 [As Published].pdf · 171 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.