Skip to the record
Search everything, all in one place.

Council archive · source document

stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165

Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

25 Kauri St Cooroy




  Stormwater Management Plan
       25 Kauri St Cooroy

                               Prepared By:

                         Hydrology and Water
                     Management Consulting Pty Ltd

                               Prepared For:

                            Calezac Pty Ltd

                           Reference: J00300R1V1
                            Date: 2 October 2018




                                Hydrology and Water Management Consulting Pty Ltd
                                PO Box 120 Coolum Beach Qld 4573
                                Mob 0405 194 639
                                Email [email protected]
                                Web www.hydrologyandwater.com.au
                                ABN 25 153 466 981 ACN 153 466 981




J00300R1V1                                                                          i
Full text of the other 31 pages

Page 2

25 Kauri St Cooroy




Disclaimer

This report has been prepared for Calezac Pty Ltd (The client). It is subject to the provisions of the agreement
between Hydrology and Water Management Consulting Pty Ltd (HWMC) and the Client. Study results should not be
used for purposes other than those for which they were prepared.

© Copyright 2018 Hydrology and Water Management Consulting Pty Ltd.




Report Status

Reference            Date                  Status               Author


J00300R1V1           2/10/2018             Final                ________
                                                                R Stewart
                                                                RPEQ 13272




J00300R1V1                                                                                                  ii

Page 3

25 Kauri St Cooroy




                                                                   TABLE OF CONTENTS

1      INTRODUCTION ............................................................................................................................................... 1
2      SITE AND DRAINAGE CHARACTERISTICS........................................................................................................... 2
3      PROPOSED DEVELOPMENT .............................................................................................................................. 3
4      STORMWATER QUANTITY ............................................................................................................................... 4
    4.1         BASE CASE ......................................................................................................................................................... 4
    4.2         UN-MITIGATED DEVELOPED CASE .......................................................................................................................... 6
    4.3         VALIDATION ....................................................................................................................................................... 8
    4.4         MITIGATED DEVELOPED CASE ................................................................................................................................ 8
5      STORMWATER QUALITY ................................................................................................................................ 11
    5.1     WATER QUALITY OBJECTIVES .............................................................................................................................. 11
    5.2     MODELLING DETAILS ......................................................................................................................................... 11
       5.2.1 Software ................................................................................................................................................... 11
       5.2.2 Model Parameters ................................................................................................................................... 11
       5.2.3 Water Quality Treatment Catchments..................................................................................................... 12
       5.2.4 Bioretention Details ................................................................................................................................. 14
    5.3     WATER QUALITY RESULTS................................................................................................................................... 15
    5.4     CONSTRUCTION PHASE STORMWATER MANAGEMENT ............................................................................................. 16
    5.5     WSUD IMPLEMENTATION .................................................................................................................................. 17
    5.6     MAINTENANCE AND OPERATION .......................................................................................................................... 17
6      CONCLUSION ................................................................................................................................................. 18
7      QUALIFICATIONS & LIMITATIONS .................................................................................................................. 19
8      REFERENCES .................................................................................................................................................. 20



     Appendices
Appendix A Survey
Appendix B Proposed Site Plan
Appendix C Rational Method Calculation – Developed Site Catchment
Appendix D Basin Storage Curve




J00300R1V1                                                                                                                                                                      iii

Page 4

25 Kauri St Cooroy




1 INTRODUCTION
Hydrology and Water Management Consulting Pty Ltd (HWMC) has been commissioned by 360
Civil Consulting Pty Ltd on behalf of Calezac Pty Ltd to undertake a Stormwater Management
Plan (SMP) for a unit development at 25 Kauri Street, Cooroy. The site’s real property
description is Lot 27 on C56016.

The purpose of this investigation is to describe how the proposed development will comply with
Council’s requirements relating to stormwater quantity and quality including:

    •    Non-worsening of peak runoff from the site; and
    •    Compliance with stormwater quality treatment objectives.

Rainfall-runoff hydrology modelling of the site in its existing and proposed conditions has been
undertaken to size on-site detention storage for peak flow attenuation.

MUSIC modelling has been undertaken to size a bioretention basin that is able to reduce site
pollutant loads to achieve the required stormwater quality treatment objectives.

The stormwater strategy presented in this report has been prepared in consultation with the
project engineer, 360 Civil Consulting Pty Ltd. This report provides conceptual details of
stormwater design requirements that should be incorporated into the overall site design.




J00300R1V1                                                                                   1

Page 5

25 Kauri St Cooroy




2 SITE AND DRAINAGE CHARACTERISTICS
The site is located at 25 Kauri St Cooroy. It has an area of approximately 4782 m² and currently
contains grass and scattered trees.

The site location is shown on the Google imagery extract on Image 2-1.

Natural ground levels of the site fall to the west, towards Kauri Street with a slope of
approximately 5.0%. Ground survey of the site has been provided to HWMC for use in this
investigation and is provided in Appendix A.

Stormwater runoff from the site currently discharges generally as overland sheet flow to Kauri
Street.




Image 2-1 – Satellite Imagery of Site and Surrounds (Google Imagery)




J00300R1V1                                                                                   2

Page 6

25 Kauri St Cooroy




3 PROPOSED DEVELOPMENT
The development proposal involves construction of 17 new units that will have two access
crossings from Kauri St and one from Olivine St. The site layout plan for the development is
provided in Appendix B and an extract is provided below for reference.




Image 3-1 – Proposed Site Plan (Extract from All Design and Drafting Site Plan)




J00300R1V1                                                                               3

Page 7

25 Kauri St Cooroy




4        STORMWATER QUANTITY
Hydrologic modelling of site stormwater runoff has been undertaken to size detention storage
that is able to mitigate peak site runoff to levels that are less than or equal to the existing
scenario.

Analysis has been undertaken for the 50%, 10% and 100% Annual Exceedance Probability (AEP)
events. The following scenarios have been investigated:

         1.          Base Case (Existing Site)
         2.          Un-Mitigated Developed Case (no detention)
         3.          Mitigated Developed Case (with detention)

Modelling has been carried out in accordance with ARR 2016 procedures using WBNM software
in conjunction with Storm Injector software.

4.1      Base Case
Hydrologic modelling of the catchment has been carried out using WBNM software developed
jointly by the University of Wollongong, Rienco Consulting and Balance R & D.

A WBNM model has been setup representing the site in its existing condition. The base case
model has a single sub-catchment representing the full site with zero impervious area.

A WBNM lag parameter of 1.3 has been applied. This value was selected by calibrating to the
QUDM Rational Method for un-mitigated developed site flows (refer section 4-3).

Modelling has been carried out for the full range of standard design event storm durations
ranging from 5 minutes up to 3 hours. For each duration, an ensemble of 10 different temporal
patterns has been modelled and the adopted peak flow is taken as the value closes to the mean,
with a bias to values above the mean (Storm Injector bias factor of 2).

Rainfall loss rates adopted for this investigation are based on values from the ARR data hub and
are shown on Table 4-1 and 4-2.

Table 4-1 WBNM Rainfall Loss Rates

 Pervious Area             Pervious Area    Impervious Area       Impervious Area
    Initial Loss            Continuing         Initial Loss         Continuing
       (mm)                Loss (mm/hr)           (mm)             Loss (mm/hr)

       Varies
                                2.6                 0                   0
  (see table 5-3)




J00300R1V1                                                                                   4

Page 8

25 Kauri St Cooroy




Table 4-2 Pervious Area Initial Loss (mm)

     Duration          50% AEP              10% AEP             1% AEP
       5 min              29.5                25.3                22.2
      10 min              29.5                25.3                22.2
      15 min              29.5                25.3                22.2
      20 min              29.5                25.3                22.2
      25 min              29.5                25.3                22.2
      30 min              29.5                25.3                22.2
      45 min              29.5                25.3                22.2
      1 hour              29.5                25.3                22.2
     1.50 hour            29.2                19.7                18.5
      2 hours             23.8                13.9                11.8
      3 hours              15                  0.7                 0


BoM’s ARR 2016 Rainfall IFD data has been used for this investigation. Design rainfall depths
are shown on Table 4-3.

Table 4-3 Design Rainfall Depths (mm)

     Duration          50% AEP              10% AEP             1% AEP
       5 min              11.3                17.9                26.3
       10 min             18.3                28.7                41.2
       15 min             23.2                36.4                 52
       20 min              27                 42.3                60.8
       25 min             30.1                47.3                68.3
       30 min             32.7                51.5                74.9
       45 min             38.9                61.9                91.5
       1 hour             43.8                70.2                105
      1.5 hour            51.4                83.7                128
       2 hour             57.6                94.8                147
       3 hour             67.7                113                 178
      4.5 hour            79.8                136                 217
       6 hour             89.9                156                 251
       9 hour             106                 188                 306
      12 hour             119                 214                 353
      18 hour             140                 256                 428
      24 hour             156                 289                 489


The adopted ensemble hydrograph for each AEP event is shown on Image 4-1. Peak flows and
the associated critical storm duration are also labelled. These hydrographs represent the design
storm runoff from the full existing site.

Peak site runoff for the 1% AEP design event is predicted to be 0.23m3/s.




J00300R1V1                                                                                   5

Page 9

25 Kauri St Cooroy




Image 4-1 – Total Existing Site Design Runoff Hydrographs




4.2      Un-Mitigated Developed Case
The development has been incorporated into the WBNM modelling by updating the fraction
impervious values to reflect the proposed developed layout as shown in Appendix B. All
proposed roof and road areas have been assigned a fraction impervious of 100% impervious and
the remaining site ground level has been assigned a fraction impervious of 30% to account for
pathways etc. The resulting overall fraction impervious for the developed site is 73% and this
has been assigned to the developed case WBNM model.

The adopted ensemble hydrograph for each AEP event is shown on Image 4-2. Peak flows and
the associated critical storm duration are also labelled. These hydrographs represent the design
storm runoff from the full un-mitigated developed site.




J00300R1V1                                                                                   6

Page 10

25 Kauri St Cooroy




Image 4-2 – Total Site Un-Mitigated Design Runoff Hydrographs


Table 4-4 shows a comparison of peak flow rates between the base case and un-mitigated
developed case. It shows the impact of the proposed development is an increase in peak site
runoff ranging from 27% to 57%.

Table 4-4      Peak Flow Comparison - Base Case Vs Un-Mitigated Developed Case

                                      Un-Mitigated
                     Existing Site                         Difference            Difference
   Event                             Developed Case
                        (m3/s)                               (m3/s)                 (%)
                                          (m3/s)
  1% AEP                 0.23              0.30                 0.07                30%
  10% AEP                0.15              0.19                 0.04                27%
  50% AEP                0.07              0.11                 0.04                57%




J00300R1V1                                                                                    7

Page 11

25 Kauri St Cooroy




4.3      Validation
The un-mitigated developed case peak flows from the site have been validated against a QUDM
Rational Method calculation. This Rational Method calculation is provided in Appendix C. Table
4-5 compares the WBNM model peak flows with those of the Rational Method. This is
considered a suitable validation of the WBNM peak flows.

Table 4-5      Peak Flow Comparison - Base Case Vs Un-Mitigated Developed Case

                                           WBNM
                                        Un-Mitigated       Difference            Difference
   Event             Rational Method
                                       Developed Case           3
                                                             (m /s)                 (%)
                                             3
                                           (m /s)
  1% AEP                  0.30              0.30                0                   0%
  10% AEP                 0.17              0.19              0.02                  12%
  50% AEP                 0.09              0.11              0.02                  22%



4.4      Mitigated Developed Case
Modelling of the un-mitigated developed case described in the previous section demonstrates
that a detention basin is required to mitigate the increased peak runoff from the site.

It is proposed to incorporate an on-site detention storage that will receive runoff from the site
stormwater network. It has been assumed that flows in excess of the 5% AEP event (Q20) will
bypass the storage basin and discharge from the site as overland flow. This is necessary
because the proposed site roof and stormwater network will be designed to capture events up to
the 5% AEP only (design to be carried out at future detailed design phase). A bypass system
has been incorporated into the WBNM model to achieve this. The peak 5% AEP discharge from
the un-mitigated developed site is predicted by the WBNM model to be 0.24m3/s. Site discharge
is excess of this value will bypass the WBNM basin.

The sub-catchment areas and fraction impervious values are as per those of the Un-Mitigated
developed case.

The onsite detention storage and outlet details have been iteratively sized to achieve a non-
worsening of peak runoff. Details of the adopted configuration is provided in Table 4-6.




J00300R1V1                                                                                    8

Page 12

25 Kauri St Cooroy




Table 4-6 Detention Storage Details

   Storage Details

74m2 of underground tank storage with a depth of 0.75m                               55.5 m3 storage

125m2 of active flood storage in basin with a depth of 350mm (above the
                                                                                     44.5 m3 storage
extended detention zone)

Total detention storage up to peak 1% AEP flood level                                100 m3 storage

   Outlet Details

Orifice with invert at base of pit                                                 240 mm diameter

High flow weir 1.2m above pit invert level                                         900mm wide weir



Under this configuration the peak flood depth predicted in the basin for the 1% AEP is 1.35m
above the base of the outlet pit (i.e. above the orifice invert level). Assuming the pit invert level is
106.2 m AHD then the peak 1% AEP level in the basin will be 107.55 mAHD.

The storage curve assumed for the WBNM modelling is provided in Appendix D. There is
potential to revise the configuration of the storage basin when detailed design is carried out in the
future. When this is done, the storage in the basin should achieve or exceed the storage curve
assumed for this modelling.

The peak 1% AEP flow rate over the weir is predicted to be 0.08m3/s. This equates to a depth
over the weir of 100mm and velocity of 1m/s. This gives a depth-velocity product of 0.1m2/s
which is a low hazard.

The adopted ensemble hydrograph for each AEP event is shown on Image 4-3. Peak flows and
the associated critical storm duration are also labelled. These hydrographs represent the design
storm runoff from the full mitigated developed site.




J00300R1V1                                                                                           9

Page 13

25 Kauri St Cooroy




Image 4-3 – Total Site Mitigated Developed Design Runoff Hydrographs


Table 4-7 shows a comparison of peak flow rates between the base case and the mitigated
developed case. It shows that the detention storage can reduce peak flows to less than or equal
to those of the base case.

Table 4-7      Peak Flow Comparison – Base Case Vs Mitigated Developed Case

                                        Mitigated
                     Existing Site                         Difference         Difference
   Event                             Developed Case
                           3                                    3
                        (m /s)                               (m /s)              (%)
                                          (m3/s)
  1% AEP                 0.23              0.22               -0.01               -4%
  10% AEP                0.15              0.12               -0.03              -20%
  50% AEP                0.07              0.07                 0                  0%




J00300R1V1                                                                                  10

Page 14

25 Kauri St Cooroy




5 STORMWATER QUALITY

5.1      Water Quality Objectives
In Queensland, the State Planning Policy sets out best practice urban stormwater quality design
objectives for development. Water quality objectives (WQO’s) for the proposed residential
development site are those stipulated in the State Planning Policy for the South-East Queensland
region. The specified water quality objectives for the site are shown in Table 5-1:

Table 5-1: Stormwater Quality Objectives

                         Pollutant                           Load Based Reduction
           Total Suspended Solids (TSS)                               80%
               Total Phosphorous (TP)                                 60%
                     Total Nitrogen (TN)                              45%
                Gross Pollutants (GP)                                 90%



5.2      Modelling Details

5.2.1 Software

A quantitative assessment of stormwater runoff quality has been undertaken for the operational
phase of the proposed development. Stormwater quality modelling has been carried out using
version 6.2.1 of eWater’s ‘MUSIC’ software (Model for Urban Stormwater Improvement
Conceptualisation). MUSIC is a decision support tool, used to plan and design appropriate urban
stormwater management systems at the conceptual level.

MUSIC modelling has been undertaken in accordance with the Water by Design’s (WbD) ‘MUSIC
Modelling Guidelines version 1.0 – 2010’ and the 2014 WbD ‘Bioretention Technical Design
Guidelines’.



5.2.2 Model Parameters

Rainfall and evapo-transpiration data for the investigation have been sourced from the Cooroy
Composite rainfall station. The ten-year period from 1973 to 1983 has been adopted for
modelling in accordance with the WbD modelling guidelines.

Modelling has been carried out using a 6-minute time step.

Music modelling parameters associated with the generation of run-off and with pollutant
generation have been incorporated using the values recommended in the WbD guidelines.
These values are provided below in Table 5-2 and 5-3.




J00300R1V1                                                                                   11

Page 15

25 Kauri St Cooroy




Table 5-2: MUSIC Pollutant Concentration Parameters

                                         Total Suspended       Total
                                                                            Total Nitrogen
                                           Solids (Log10    Phosphorous
                                                                             (Log10 mg/L)
                                               mg/L)        (Log10 mg/L)
  Land Use              Parameter
                                           Storm    Base    Storm   Base    Storm     Base
                                           Flow     Flow    Flow    Flow    Flow      Flow

 Residential              Mean             1.30      N/A    -0.89   N/A     0.26       N/A
   Roof
     (split)           Std Deviation       0.39      N/A    0.31    N/A     0.23       N/A
 Residential              Mean             2.18      1.0    -0.47   -0.97   0.26      0.20
  Ground
     (split)           Std Deviation       0.39      0.34   0.31    0.31    0.23      0.20

 Residential              Mean             2.43      1.0    -0.30   -0.97   0.26      0.20
 Road (split)          Std Deviation       0.39      0.34   0.31    0.31    0.23      0.20



Table 5-3: MUSIC Runoff Generation Parameters

                     Parameter                     Urban
           Rainfall Threshold (mm)                   1
               Soil Capacity (mm)                   500
               Initial Storage (%)                  10
                 Field Capacity                     200
     Infiltration Capacity Coefficient a            211
      Infiltration Capacity Exponent b               5
               Initial Depth (mm)                   50
          Daily Recharge Rate (%)                   28
          Daily Base Flow Rate (%)                  27
       Daily Deep Seepage Rate (%)                   0



5.2.3 Water Quality Treatment Catchments

The bioretention has been sized to treat runoff from a the residential developed shown on the
Site Plan in Appendix B. The MUSIC modelling has been carried out using a split source node
approach. The modelled water quality catchments and the associated landuses are shown on
Image 5-1. Areas of the proposed site not designated as roof or road have been assigned a
residential ground landuse with a Fraction Impervious of 30%.



J00300R1V1                                                                                12

Page 16

25 Kauri St Cooroy




Image 5-1 – Water Quality Catchment and Landuses



Catchment areas and percent impervious values for the water quality treatment catchments are
detailed in Table 5-4.

Table 5-4: Modelled Catchment Land Use and Percent Impervious
                     Land Use            Area (Hectares)        Percent Impervious

                       Roof                   0.193                    100%

                      Ground                  0.187                     30%

                      Road                    0.098                    100%

                      Total:                  0.478                     73%




J00300R1V1                                                                               13

Page 17

25 Kauri St Cooroy




The MUSIC model layout is shown on Image 5-2:




Image 5-2 – MUSIC Model Layout




5.2.4 Bioretention Details

Details of the proposed bioretention system that has been assumed for MUSIC modelling are
provided on Image 5-3. This configuration has been developed to allow compliance with site
water quality objectives. The storage surface area shown is based on average area assuming
1V:4H batters up from the filter media.




Image 5-3 – Bioretention Details




J00300R1V1                                                                             14

Page 18

25 Kauri St Cooroy




In summary, the bioretention basin is to have 36 m2 filter area with a filter media depth of 0.5m
and 1 in 4 batters within the extended detention zone.

5.3      Water Quality Results
Results for the MUSIC modelling are provided on Image 5-4 which shows that the site water
quality objectives are achieved.




Image 5-4 – Pollutant Load Reductions




J00300R1V1                                                                                    15

Page 19

25 Kauri St Cooroy




5.4      Construction Phase Stormwater Management
The following points provide general guidance on the management of stormwater during the
construction phase. Detailed Erosion and Sediment Control Management Plans should be
provided during the operational works application stage in accordance with International Erosion
Control Association Australia (IECA) Guidelines.

Sediment control should be able to be achieved by applying the following best practice sediment
and erosion control management during the construction phase of the project:

      1. Establish defined, stabilised entry/exit point for the site works;
      2. Construct a shake-down grid at the entrance to facilitate the removal of sediment from
         trucks leaving the site. The access road extending from the end of the existing road or
         kerb to the grid should comprise a 150-200mm deep pad of 40mm crushed rock;
      3. Install sediment fences along the lower boundaries of the site;
      4. Install suitably sized sediment basins at locations of concentrated flow (ie drainage
         discharge points/future bio-retention basins);
      5. Install bins and/or wind-proof litter areas on-site to minimise the dispersion of gross
         pollutants;
      6. Maintain on site spare materials necessary for the emergency repair of all erosion control
         devices. This includes silt fences, clean crushed rock for reapplication to the entrance
         road and for replacement of rock within temporary drainage channels;
      7. Following each day’s construction works, ensure that any material on road surfaces is
         swept from the road, and not permitted to be washed down the gutters and piped
         drainage systems.
      8. Quality of pooled water within sediment basins are to be monitored prior to dewatering,
         sufficient time should be given to allow sediment to settle (possible with the assistance of
         a suitable flocculent if necessary) &/or filtering during pumping operations.
      9. Final establishment of bioretention basins at outlets should not occur until full stabilisation
         of upstream catchment has occurred; preferably these should be temporarily turfed/grass
         seeded during the maintenance period while dwelling construction is occurring.

It shall be the responsibility of the developer, through their principal contractor, to ensure that
temporary sediment and erosion controls are installed and maintained correctly.




J00300R1V1                                                                                           16

Page 20

25 Kauri St Cooroy




5.5        WSUD Implementation
Experience shows that the critical periods in the life of WSUD vegetated stormwater systems are
the construction and establishment phases. The timing and approach to these systems must be
carefully considered to ensure successful establishment and long-term performance.
Bioretention systems are common stormwater treatment devices for new urban developments in
South East Queensland. Successful construction and allowing adequate time for the systems to
establish is critical to their long-term performance and function. Construction of the system is
also linked to having suitable bioretention designs in place to ensure civil contractors have
appropriate plans to construct to. Applying due care in the design and construction phase will
ensure the function of the system whilst also keeping on-going maintenance to a minimum. It is
highly recommended that the following guidelines are followed through the design, construction,
establishment and maintenance phases.

Table 5-5: WSUD Guidelines

 Phase                                                       Guideline

 Design                               Bioretention Technical Design Guidelines (Oct 2014)

                                      Construction and Establishment Guidelines: Swales,
 Construction and Establishment
                                      Bioretention Systems and Wetlands (Apr 2010)

 Maintenance                          Maintaining Vegetated Stormwater Assets (Feb 2012)



5.6        Maintenance and Operation
Maintenance for the bioretention basins may involve the following:


      1.   Scheduled inspections;
      2.   Removal of noxious plants or weeds;
      3.   Maintaining the desired vegetation;
      4.   Repairing erosion;
      5.   Unblocking inlets and outlets;
      6.   Removing litter and debris;
      7.   Managing algal or moss growth;
      8.   Maintaining the permeability of




J00300R1V1                                                                                   17

Page 21

25 Kauri St Cooroy




6 CONCLUSION
This stormwater management plan has been prepared to support an MCU development
application for a unit development at 25 Kauri Street, Cooroy. It has been demonstrated that the
on-site detention storage described in this report is able to mitigate peak flows to less than or
equal to those of the existing site.

A bioretention system has been sized to allow the proposed development to comply with the
site’s water quality objectives for pollutant load reduction.




J00300R1V1                                                                                    18

Page 22

25 Kauri St Cooroy




7 QUALIFICATIONS & LIMITATIONS
In preparing this report, HWMC has relied upon and assumed accurate data provided by Noosa
Council, the Client and their representatives. Unless otherwise stated in this report, HWMC has
not attempted to verify the accuracy or completeness of any such information. The accuracy of
this report is reliant upon the accuracy of this information.

This report should be read in full and no excerpts are to be taken as representative of the
findings. No responsibility is accepted by HWMC for use of any part of this report in any other
context.

Study results should not be used for purposes other than those for which they were prepared.

Modelling for this investigation is based on a design event approach and assumptions that are
consistent with current industry practice. Real world flood events are random and highly variable.
Consequently, observed and future flooding characteristics may not reflect those described in
this report.




J00300R1V1                                                                                     19

Page 23

25 Kauri St Cooroy




8 REFERENCES

    •    Bureau of Meteorology, Online Rainfall IFD Data System
         ‘http://www.bom.gov.au/hydro/has/cdirswebx/cdirswebx.shtml’
    •    BMT WBM, 2016, “TUFLOW User Manual”
    •    Institute of Public Works Engineering Australasia, 2016 “Queensland Urban Drainage
         Manual”, Fourth Edition (QUDM)
    •    Engineers Australia, 2016, “Australian Rainfall and Runoff”
    •    University of Wollongong (2007), WBNM User Guide.
    •    Michael Boyd et al, 2012, “WBNM User Guide”
    •    Michael Boyd et al, 2012, “Details of the Theory Used in WBNM”
    •    SCARM, 2000, “Floodplain Management in Australia: Best Practice Principals and
         Guidelines”
    •    Sunshine Coast Council (2014), “Stormwater Management Code”.
    •    W.J. Syme, 2001, “Modelling of Bends and Hydraulic Structures in a Two-Dimensional
         Scheme”
    •    W.J. Syme, 2011, “Modelling Structures”, ASFPM SMS Workshop USA;




J00300R1V1                                                                              20

Page 24

APPENDICES


[OCR of page images]
APPENDICES

Page 25

Appendix A:   Site Survey


[OCR of page images]
Appendix A: Site Survey

Page 26

 

 
  

 

 

 
  

   

 

 

we 26 Me 110.47
406.08
SWP T1069 C56016 ~ 14
LL:106.68 pals ov a
TCO tg 3 C56023
+ +
Oo p— WW
a> Y 3S el 3 t oh
Oh oo ig =o
N Cs ae Oo =
ce S35 PT Oo Oo =
i | £° =
E ) © _
E q 3B So “ ~ e/>
o | . — WS —
<I! 4 \ Ss 046 7 ’ No
a) } +
5) ! © a e
al 4 a® wy
ee it Hy ce |
SS | eb) if
4 ° &
ey / ©
XN 7 wey
a pt PA “
RS e ; wer kK”
NX
SEQ 1 “or F112
S| i & wu > x
Lt-106.87 |} a 2 { fs wy’ Ye
oo |S ‘ va
Se! in ° 2 \ é ja y
Sal iS | 4741m RS é ?~
l 4 Ss J0 /* %&
| ig 7s J & wr? ,
roa MA oS,
6-6" ”

7
&
2

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LINETYPE LEGEND
a BANK BOTTOM
BANK TOP
BATTER
CROWN
GUTTER
GRAVEL
LEGEND
TREES SERVICES BITUMEN
KERB
A-ASH 4 - ELECTRIC JUNCTION BOX
B- BLOODWOOD HCB - HOUSE CONNECTION BRANCH CONCRETE
BA-BANKSA Y= HYORANT
88-BOTTLEBRUSH HW HEADWALL E ELECTRICAL
Bx Box IL INVERT LEVEL
(CD - CADAGH! UL- LIDLEVEL —— W—— _ water
Sr erreus UP -LignT POLE
CL - CAMPHOR LAUREL MH - MAN HOLE DAMPOOL
F-FIG PP - POWER POLE Ss SEWER
uM SV STOP VALVE
SG-GOLDEN CANE SWP = STORMWATER PIT D DRAINAGE
HP- HOOP PINE TE. TELSTRAPT AANA
IB- IRONBARIC Ww WATER METER, . TREELINE
I -JACARANDA
LEP. LEOPARD GARDEN
ue waco” * ROCK OUTCROP
MP MAPLE omer BUILDING
i PAVING
5 palm AND AUSTRALIAN HEIGHT DATUM
+
PB. PAPERBARK BM - BENCH MARK PRO OOO0O020%- RETAINING WALL
PI: PINE EDA.“ EFFLUENT DISPOSAL AREA WALL
PN PANDANAS H.S-A.- HOUSE SITE AREA
20 - POINCIANA FFL" FINISHED FLOOR LEVEL —— GUARDRAIL
aS) S- STRNGYEARK fL-ReDUGED LEVEL
A? SC- SCRUB —v, / FENCE
Ss : SH - SHE OAK NOTE:
XN MH SI- SILKY OAK TREES UNDER 0.3m TRUNK BDY
+ UM- UMBRELLA DIAMETER NOT LOCATED,
© 1L107.68 Wel Wanne MAJOR CONTOUR
. . X- EXOTIC MINOR CONTOUR
ient: A A Ri Project: 2
naa cient’ ALBA PROJECTS on Plan 1 of 4 me

 

MAX WATTERSON
+ ASSOCIATES

CONSULTING SURVEYORS
& PLANNERS
10 Maple Street

PO Box 639
Cooroy Qld 4563

Ph. (07) 54426121
Fax. (07) 54425125
Email. [email protected]

 

 

LOCAL GOVT: NOOSA S.C.

LOCALITY: COOROY

PLAN SHOWING
DETAILS OF LOT 27
ON C56016.

Date: 15-01-18

 

Scale: 1:500

Datum: AHD

PM24971
RL 107.926

Cont.Int: 0.5m

Origin:

 

 

10 15 20 25m

Ref:
93-224AE

 

This plan has been prepared from data of a
survey completed in 1993 and has been
prepared building design purposes only and
may be subject to change.

Underground services not located except
where evident on surface.

 

 

 

Page 27

Appendix B:   Proposed Site Plan


[OCR of page images]
Appendix B: Proposed Site Plan

Page 28

                                                                                                                                                              2
                                                                                                   1
                                                                                                                                                          C02
                                                                                                 C02

                                                                                                                                                  STORMWATER
                                                                                                                                                  ENGINEERING
                                                                                                                                                  REQ 210sqm

                                                                                                                                                                                                                                                                                                                                                                      ARCHITECTURAL BUILDING DESIGN
                                                                                                                                                                                                                                                                                                                                                                      RESIDENTIAL, COMMERCIAL &
                                                                                                                                                                                                                                                                                                                                                                      RENOVATIONS.

                                                                                                                                                                                                                                                                                                                                                                      PH. 0405 097 553




                                                         T
                                                                                                                                                                                                                                10
                                                                                                                                                                                                                                                                                                                                                                      [email protected]


                                                       EE
                                                                                                                                                                                                                          .0       8

                                                                                            NEW                                                                         U8                                            m
                                                                                                                                                                                                                            0
                                                                                                                                                                                                                                                                                                                                                                      www.alldd.com.au




                                                                                                                                                                  T2
                                                     TR                                     CROSSING                                                                                                                                                                                                                                                                  VBA DP-AD 37989




                                                                                                                                                                                                                                                                                                                                          N
                                                                                                                                                                                                                                                                                                                                                                      QBCC 1084590
                                                   IS




                                                                                                                                                                                                                                                                                                                                           O
                                                                                                                                                                                                                                                                                                                      W



                                                                                                                                                                                                                                                                                                                                            RT
                                                                         LETTER BOXES
                                                  R


                                                                                                                                   R                                                                                                                  L
                                                                                                                                                                                                                                                 00 AL                                                                                                                          THIS DRAWING IS THE COPYRIGHT AND
                                                                                                                                                                                                                                               40 K W
                                                 U



                                                                                                                                                                                               U7




                                                                                                                                                                                                                                                                                                                                              H
                                                                                                                                       V                                                                                                         AC                                                                                                                       C     PROPOERTY OF ALLDD. IT IS NOT TO BE COPIED,
                                               KA




                                                                         SCREENDED SHARED                                                                                                                                                     TB                                                                                                                                RETAINED OR USED FOR ANOTHER PURPOSE.
                                                                                                                                                                                                                                            SE




                                                                                                                                                      R
                                                                         WASTE AREA




                                                                                                                                                                                    T1
                                                                                                                                                                                                                                                                                     TIO
                                                                                                                                                                                                                                                                                   PA




                                                                                                                                                                                      A
                                                                                                                                                          R
                                                                                                                                                                                                                                                                   00 ED                                                                                              Client:




                                                                                                                                                                       R
                                                                                                                                                                                                                                                                30 VER
                                                                                                                                                                                                                                                                                                                                                                            Alba Projects




                                                                                                                                                                                                                                                                                                                       S
                                                                                                                                                                                                                                                                   O




                                                                                                                                                                                                                                                                                                                                              E
                                                                                                                                                                                                                                                                  C
                                                                     4                                                                                             4                                                                                           CK
                                                                                                                                                                                                                                                             BA
                                                                C02                                                                                               C02
                                                                                                                                                                                                                 U6                                       SE
                                                                                                                                                                                                                                                            T




                                                                                                                                                                                                           T1
                                                                                                                                                                                                             A
                                                      SE
                                                        TB 600
                                                          AC 0
                                                            KW
                                                               AL
                                                                 L
                                                                                                                                                                                                                                U5                                                         10
                                                                                                                                                                                                                                                                                              9.
                                                                                                                                                                                                                                                                                                00
                                                                                                                                                                                                                                                                                                                                                                      Project:




                                                                                                                                                                                                R
                                                                                                                                                                                                                                                                                      m
                                                                                                                                                                                                                                                                                                                                                                            Proposed Residential Multi
                                                                                                                                                                                                                                                                                                                                                                            Unit Development




                                                                                                                                                                                                                          T1
                                               SHARED AREA




                                                                                                                                                                                                          R
                                                                                                       T4
                                                                                                              U10 U9 T4




                                                                                                                                                                                                                            B
                                                                                                                                                                                                                                                                                                                                                                            Attached Zone




                                                                                                                                                  R
                     NEW




                                                                                                                                                      R




                                                                                                                                                                                                                                           T1
                     CROSSING                                                                                                                                                                                                                                                                                                                                             THIS DRAWING IS NOT FOR DA, BA OR
                                                                                                                                                                                                                                                  U4                                                                                                                      CONSTRUCTION




                                                                                                                                                                                                                                             B
                                                                                        V



                                                                                                                                                      V
    GE




             SE                                                                                               R    R    R     R                                                                                                                                                                                                                                       Address:
  ED




               TB 600
                 AC 0                      3                                                                                                                                               3                                                                  U3
  AD




                   KW                                                                                                                                                                                                                                                                                                                                                       25 Kauri Street
RO




                      AL                 C02                                                                                                                                          C02




                                                                                                                                                                                                                                       R
                        L
                                                                                                                                                                                                                                                                                                                                                                            Cooroy




                                                                                                                                                                                                                                                      T1
                                                                                                                                                                                                                                                                                                                                11




                                                                                                                                                                                                                                                        A
                                                                                                                                                                                                                                                                                                                                                                            QLD 4563
                                                                                                                                                                                                                                                                                                                                  0.




                                                                                                                                                                                                                                            R
                                                                                                                                                                                                                                                                                                                                    00
                            1                                                                                                                                                                                     1                                                                                                         m

                        C03                                                                                                                                                                                      C03
                                                                                                                                                                                  R            R                                                                                           U2                                                                         Property Details:
                                                            R




                                                                                                                                                                                                                                                                               T1
                                                                                                                               R                                                                                                                                                                                                                                              Lot 27 C56016




                                                                                                                                                                                                                                                                                 A
                                                                         R                             R       R                                  R       R                                                                                                                                                                                                                   Area 4741m²




                                                                                                                                                                                                                                                                                                                                         EA

                                                                                                                                                                                                                                                                                                                                         30
                                     m




                                                                                                                                                                                                                                                                                                                                           00
                                                                                                                                                                                                                                                                                                                                            SE
                                  sq




                                                                                                                                                                                                                                                                                                      U1




                                                                                                                                                                                                                                                                                                                                              ME
                                   0
                                15




                                                                                                                                                                                                                                                                                                                                                NT
                                                                                                                                                                                                                                                                  R
                           G




                                                                                                                                                                                                                                                                                                                                                  ?
                         IN
                       AT




                                               T3                            T1A             T1A                     T1B               T1B                    T1A                                     T2
                     SE




                                                                                                                                                                                                                                                                                                     T1
                                                                                                                                                                                                                                                                                                                                                                          No.              Issue Details          Date




                                                                                                                                                                                                                                                                                                                                                            11
                                                                                                                                                                                                                                                                              R
                    H




                                                                                                                                                                                                                                                                                                                                                               1.
                                                                                                                                                                                                                                                                                                       B
                  IT




                                                                                                                                                                                                                                                                                                                                                                 00
                                                                                                                                                                                                                                                                                                                                                                      1         Initial Concept                07-02-2018
                 W
           RD ED




                                                                                                                                                                                                                                                                                                                                                            m
              EN




                                                                                                                                                                                                                                                                                                                                                                      2         Developed                      26-04-2018
                                                                                                                                                                                                                                                                                                                 ER
                                                 U11                         U12              U13 U14                                      U15 U16                                     U17
         GA HAR




                                                                                                                                                                                                                                       V                                                                     W                                         2              3         Developed                      23-05-2018
                                                                                                                                                                                                                                                                                                           SE
          S




                                                                                                                                                                                                                                                                                                                                                      C02             4         Developed                      24-05-2018
                                                                                                                                                                                                                                                                                                                                                                      5         Developed                      30-05-2018
              2                                                                                                                                                                                                                              2                                                               COMMUNITY GARDENS
                                                                                                                                                                                                                                                                                                             200sqm                                                   6         Developed                      13-06-2018
            C03                                                                                                                                                                                                                             C03                                                                                                                       7         Developed                      02-07-2018
                                                                                                                                                                                                                                                                                                                                                                      8         Developed                      13-07-2018
                                                                                                                                                                                                                                                                                                                                                                      9         Developed                      18-07-2018
                                                                                                                                                                                                SETBACK WALL
                                                                                                                                                                           SETBACK PATIO




                                                    25sqm (min) PRIVATE OPEN SPACE 4m MINIMUM DIMENSION PER UNIT                                      12.6 cbm STORAGE




                                                                                                                                                                                                                                                                    NEW CROSSING
                                                    ACTUAL POS WILL BE LARGER TBC
                                                                                                                                                                                                    6000




                                                                                                                                                                                                                                                                                                                                                                           SITE PLAN
                                                                                                                                                                               5000




                                                                                                            ALL SINGLE GARAGE DOORS 2700mm WIDE
                                                                                                            ALL DOUBLE GARAGE DOORS 4800mm WIDE
                                       FENCING SETBACK 1m AND ARTICULATED EVERY 5m
                                                                                                                                                                                                                                                                                                                       1                                              Project number                              11594
                     1m DENSELY LANDSCAPED STRIP INSIDE BOUNDARY
                                                                                                                                                                                                                                                                                                                      C02                                             Current Issue Date                     18-07-2018
                                                                                                                                                                                               ROAD EDGE                                                                                                                                                                                                      1 : 350 A3
                                                                                                                                                                                                                                                                                                                                                                      Scale

                                                                                                              OLIVINE STREET                                                                                                                                                                                                                                          Drawing no.                 C01

Page 29

Appendix C:   Rational Method Calculation –
              Developed Site Catchment


[OCR of page images]
Appendix C: Rational Method Calculation —
Developed Site Catchment

Page 30

RATIONAL METHOD SUMMARY & RAINFALL DATA
Project     J00300_25_Kauri_St_Cooroy

IFD Design Rainfall Intensity (mm/hr)

     DURATION                                                AEP
 (hours) (minutes)       63%           50%       20%         10%           5%       2%       1%
  0.017      1          165.00        186.00    250.00      293.00       333.00   385.00   424.00
0.033333     2          141.00        159.00    216.00      256.00       295.00   348.00   390.00
  0.050      3          132.00        149.00    203.00      239.00       275.00   323.00   360.00
 0.0667      4          126.00        142.00    192.00      226.00       259.00   303.00   336.00
  0.083      5          120.00        135.00    183.00      215.00       245.00   285.00   315.00
  0.167      10          97.30        110.00    148.00      172.00       196.00   225.00   247.00
  0.25       15          82.30         92.90    125.00      145.00       165.00   190.00   208.00
   0.5       30          58.00         65.40     88.10      103.00       117.00   136.00   150.00
    1        60          38.70         43.80     59.50       70.20        80.70    94.50   105.00
    2       120          25.30         28.80     39.80       47.40        55.00    65.30    73.30
    3       180          19.80         22.60     31.50       37.80        44.10    52.70    59.40
    6       360          13.00         15.00     21.40       26.00        30.50    36.80    41.80
    12      720          8.54          9.95      14.60       17.90        21.20    25.80    29.40
    24      1440         5.51          6.48      9.70        12.00        14.40    17.70    20.40
    48      2880         3.42          4.04      6.15        7.72         9.37     11.70    13.60
    72      4320         2.53          2.99      4.58        5.78         7.06     8.86     10.40
    96      5760         2.04          2.40      3.67        4.64         5.69     7.17     8.41
   120      7200         1.71          2.02      3.08        3.89         4.78     6.02     7.06
   144      8640         1.49          1.75      2.66        3.36         4.12     5.19     6.08
   168     10080         1.33          1.56      2.35        2.97         3.63     4.55     5.32


Catchment Data

Details:    Kauri St Developed Site

 Variable    Value        Units
  Area:      0.4780        ha
  C10         0.85      fraction


Rational Method Summary

       Time of Concentration (tc)      13      Minutes (or 0.22 hours)

                                                             AEP
       Variable          63%          50%        20%         10%          5%       2%       1%
     Freq Factor         0.80         0.85       0.95        1.00         1.05     1.15     1.20
  Intensity (mm/hr)      87.31        98.61     132.68      154.01       175.34   201.68   221.01
  Discharge (m3/s)       0.08         0.09       0.14        0.17         0.21     0.26     0.30


[OCR of page images]
 

RATIONAL METHOD SUMMARY & RAINFALL DATA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project J00300_25 Kauri_St_Cooroy
IFD Design Rainfall Intensity (mm/hr
DURATION AEP
(hours) | (minutes) 63% 50% 20% 10% 5% 2% 1%
0.017 1 165.00 186.00 250.00 293.00 333.00 385.00 424.00
0.033333 2 141.00 159.00 216.00 256.00 295.00 348.00 390.00
0.050 3 132.00 149.00 203.00 239.00 275.00 323.00 360.00
0.0667 4 126.00 142.00 192.00 226.00 259.00 303.00 336.00
0.083 5 120.00 135.00 183.00 215.00 245.00 285.00 315.00
0.167 10 97.30 110.00 148.00 172.00 196.00 225.00 247.00
0.25 15 82.30 92.90 125.00 145.00 165.00 190.00 208.00
0.5 30 58.00 65.40 88.10 103.00 117.00 136.00 150.00
1 60 38.70 43.80 59.50 70.20 80.70 94.50 105.00
2 120 25.30 28.80 39.80 47.40 55.00 65.30 73.30
3 180 19.80 22.60 31.50 37.80 44.10 52.70 59.40
6 360 13.00 15.00 21.40 26.00 30.50 36.80 41.80
12 720 8.54 9.95 14.60 17.90 21.20 25.80 29.40
24 1440 5.51 6.48 9.70 12.00 14.40 17.70 20.40
48 2880 3.42 4.04 6.15 7.72 9.37 11.70 13.60
72 4320 2.53 2.99 4.58 5.78 7.06 8.86 10.40
96 5760 2.04 2.40 3.67 4.64 5.69 7A7 8.41
120 7200 1.71 2.02 3.08 3.89 4.78 6.02 7.06
144 8640 1.49 1.75 2.66 3.36 4.12 5.19 6.08
168 10080 1.33 1.56 2.35 2.97 3.63 4.55 5.32
Catchment Data
Details: | Kauri St Developed Site
Variable Value Units
Area: 0.4780 ha
C10 0.85 fraction
Rational Method Summary
Time of Concentration (tc) 13 Minutes (or 0.22 hours)
AEP
Variable 63% 50% 20% 10% 5% 2% 1%
Freq Factor 0.80 0.85 0.95 1.00 1.05 1.15 1.20
Intensity (mm/hr) 87.31 98.61 132.68 154.01 175.34 201.68 221.01
Discharge (m3/s) 0.08 0.09 0.14 0.17 0.21 0.26 0.30

 

 

 

 

 

 

 

 

 

 

Page 31

Appendix D:   Basin Storage Curve


[OCR of page images]
Appendix D: Basin Storage Curve

Page 32

                      3
Depth (m)   Storage (m )
  0.00          0.00                                          WBNM Basin Storage Curve (exludes extended detention volume)
  0.05          0.10                            1.60
  0.10          0.20
  0.15          3.90
  0.20          7.60                            1.40
  0.25         11.30
  0.30         15.00
  0.35         18.70                            1.20
  0.40         22.40
  0.45         26.10
  0.50         29.80       Depth above invert   1.00
  0.55         33.50
  0.60         37.20
  0.65         40.90                            0.80
  0.70         44.60
  0.75         48.30
  0.80         52.00                            0.60
  0.85         55.70
  0.90         55.75
  0.95         55.80                            0.40
  1.00         55.85
  1.05         62.10
  1.10         68.35                            0.20
  1.15         74.60
  1.20         80.85
                                                0.00
  1.25         87.10
  1.30         93.35
                                                       0.00         20.00       40.00       60.00       80.00       100.00   120.00
  1.35         99.60                                                                     Storage (m3)
  1.40         105.85


[OCR of page images]
Depth (m)

0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40

Storage (m’)

0.00
0.10
0.20
3.90
7.60
11.30
15.00
18.70
22.40
26.10
29.80
33.50
37.20
40.90
44.60
48.30
52.00
55.70
55.75
55.80
55.85
62.10
68.35
74.60
80.85
87.10
93.35
99.60
105.85

1.60

1.40

1.20

r
°o
3

9
@
3S

Depth above invert

9
a
3°

0.40

0.20

0.00

0.00

WBNM Basin Storage Curve (exludes extended detention volume)

20.00

40.00

60.00
Storage (m3)

80.00

100.00

120.00

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.