stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy Image 4-3 – Total Site Mitigated Developed Design Runoff Hydrographs Table 4-7 shows a comparison of peak flow rates between the base case and the mitigated developed case. It shows that the detention storage can reduce peak flows to less than or equal to those of the base case. Table 4-7 Peak Flow Comparison – Base Case Vs Mitigated Developed Case Mitigated Existing Site Difference Difference Event Developed Case 3 3 (m /s) (m /s) (%) (m3/s) 1% AEP 0.23 0.22 -0.01 -4% 10% AEP 0.15 0.12 -0.03 -20% 50% AEP 0.07 0.07 0 0% J00300R1V1 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.