Council archive · source document
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy In summary, the bioretention basin is to have 36 m2 filter area with a filter media depth of 0.5m and 1 in 4 batters within the extended detention zone. 5.3 Water Quality Results Results for the MUSIC modelling are provided on Image 5-4 which shows that the site water quality objectives are achieved. Image 5-4 – Pollutant Load Reductions J00300R1V1 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.