Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165

Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

25 Kauri St Cooroy




5.5        WSUD Implementation
Experience shows that the critical periods in the life of WSUD vegetated stormwater systems are
the construction and establishment phases. The timing and approach to these systems must be
carefully considered to ensure successful establishment and long-term performance.
Bioretention systems are common stormwater treatment devices for new urban developments in
South East Queensland. Successful construction and allowing adequate time for the systems to
establish is critical to their long-term performance and function. Construction of the system is
also linked to having suitable bioretention designs in place to ensure civil contractors have
appropriate plans to construct to. Applying due care in the design and construction phase will
ensure the function of the system whilst also keeping on-going maintenance to a minimum. It is
highly recommended that the following guidelines are followed through the design, construction,
establishment and maintenance phases.

Table 5-5: WSUD Guidelines

 Phase                                                       Guideline

 Design                               Bioretention Technical Design Guidelines (Oct 2014)

                                      Construction and Establishment Guidelines: Swales,
 Construction and Establishment
                                      Bioretention Systems and Wetlands (Apr 2010)

 Maintenance                          Maintaining Vegetated Stormwater Assets (Feb 2012)



5.6        Maintenance and Operation
Maintenance for the bioretention basins may involve the following:


      1.   Scheduled inspections;
      2.   Removal of noxious plants or weeds;
      3.   Maintaining the desired vegetation;
      4.   Repairing erosion;
      5.   Unblocking inlets and outlets;
      6.   Removing litter and debris;
      7.   Managing algal or moss growth;
      8.   Maintaining the permeability of




J00300R1V1                                                                                   17

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.