Council archive · source document
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy 5.5 WSUD Implementation Experience shows that the critical periods in the life of WSUD vegetated stormwater systems are the construction and establishment phases. The timing and approach to these systems must be carefully considered to ensure successful establishment and long-term performance. Bioretention systems are common stormwater treatment devices for new urban developments in South East Queensland. Successful construction and allowing adequate time for the systems to establish is critical to their long-term performance and function. Construction of the system is also linked to having suitable bioretention designs in place to ensure civil contractors have appropriate plans to construct to. Applying due care in the design and construction phase will ensure the function of the system whilst also keeping on-going maintenance to a minimum. It is highly recommended that the following guidelines are followed through the design, construction, establishment and maintenance phases. Table 5-5: WSUD Guidelines Phase Guideline Design Bioretention Technical Design Guidelines (Oct 2014) Construction and Establishment Guidelines: Swales, Construction and Establishment Bioretention Systems and Wetlands (Apr 2010) Maintenance Maintaining Vegetated Stormwater Assets (Feb 2012) 5.6 Maintenance and Operation Maintenance for the bioretention basins may involve the following: 1. Scheduled inspections; 2. Removal of noxious plants or weeds; 3. Maintaining the desired vegetation; 4. Repairing erosion; 5. Unblocking inlets and outlets; 6. Removing litter and debris; 7. Managing algal or moss growth; 8. Maintaining the permeability of J00300R1V1 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.