Council archive · source document
Minor Change Report OPW20 0145 06 (As Published) · OPW20/0145.06
(AS ANNOTATED BY COUNCIL
25/3/2022)
SW15 F Stormwater Longitudinal Section 10/12/2020
Sheet 3 of 3
Prepared by Barlow Shelley
SW19 F Bio-Retention Basin Layout & 10/12/2020
Detail Plan Sheet 1 of 6 “Road A”
Prepared by Barlow Shelley
(AS ANNOTATED BY COUNCIL
26/11/2021)
SW20 F Bio-Retention Basin Layout & 10/12/2020
Detail Plan Sheet 2 of 6 “Road C”
Prepared by Barlow Shelley
SW21 F Bio-Retention Basin Layout & 10/12/2020
Detail Plan Sheet 3 of 6 “Road C”
Prepared by Barlow Shelley
SW22 F Bio-Retention Basin Layout & 10/12/2020
Detail Plan Sheet 4 of 6 “Hofmann
Drive”
Prepared by Barlow Shelley
SW23 F Bio-Retention Basin Layout & 14/12/2020
Detail Plan Sheet 5 of 6 “Road C”
Prepared by Barlow Shelley
SW24 F Bio-Retention Basin Layout & 10/12/2020
Detail Plan Sheet 6 of 6 “Typical
Bio Basin”
Prepared by Barlow Shelley
SW25 F Tree Pit Layout & Detail Plan 10/12/2020
Sheet 1 of 2 “Road B”
Prepared by Barlow Shelley
SW26 F Tree Pit Layout & Detail Plan 10/12/2020
Sheet 2 of 2 “Road C”
Prepared by Barlow Shelley
SW27 E Stormwater Outlet Detail Plan 26/11/2020
Sheet 1 of 4 (Structure 1/2 & 1/12)
Prepared by Barlow Shelley
SW28 F Stormwater Outlet Detail Plan 10/12/2020
Sheet 2 of 4 (Structure 1/5)
Page 9 of 27
Document Set ID: 24383091
Version: 5, Version Date: 05/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW20 0145 06 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.