Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

IDAS form 23—Tidal works and development within the · OPW15/0240

Attached to the e-mail OPW15/0240 - Operational Works Application.

of 4

Text shows just the words. Original shows the document exactly as it was published.

Table A—Operational Work
Does the operational work involve the following? (Tick all applicable boxes.)
a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
    boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
    seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?
     No           Yes
If yes, what is the purpose?
 Replace existing poly rising main with a new poly rising main. Works undertaken by UnityWater.
     Private purpose (e.g. private pontoon)
     Another purpose (e.g. commercial marina)

Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?
     No          Yes
If applicable what is the estimated value of the proposed works?
 $250,000.00
b)   Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
     excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
     parks or unallocated state land) on state coastal land above high-water mark.
     No           Yes
If yes, which of the following?
     Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
     with endemic native plants, or stinger net enclosures.
     For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
     organisation.
     For other purposes (please state below).
 Launch pit for directional drilling under Weyba Creek and exit pit where rising main is reconnected to existing
 sewer network.
If applicable what is the estimated value of the proposed works?
 $250,000.00
c)   Disposing of dredge spoil or other solid waste material in tidal water?
     No           Yes
If applicable what is the estimated value of the proposed works?


d)   Constructing an artificial waterway?
     No           Yes
If applicable what is the length of the waterway?


e)   Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
     as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
     vegetation on freehold and leasehold land)?
     No           Yes
If applicable what is the estimated value of the proposed works?




                                                                               IDAS form 23—Tidal works and development within
                                                                                                the coastal management district
                                                                                                    Version 3.1—3 August 2015

Used in these records

About this file

File size
397 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sara-idas-form-23-tidal-works-and-development_mossmancrt.pdf · 397 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.