GENERAL SITE PLAN NOTES
EARTHWORKS TO BE IN ACCORDANCE
WITH LOCAL COUNCIL REGULATIONS
‘AND NATIONAL CONSTRUCTION CODE,
VOL 2, SECTION 3.1.1 EARTHWORKS.
COMMUNITY TITLE SUBDIVISION
Total Lot Size = 1,007m2
Proposed Lot1=513m2
Preposed-batd—O4m2
STORMWATER DRAINAGE DESIGN &
DISCHARGE TO AS 3500, SECTION 3.1.2
STORMWATER DRAINAGE, NCC VOL2
AND LOCAL COUNCIL REQUIREMENTS.
DRIVEWAY CROSSOVER DESIGN,
CONSTRUCTION AND FINISH TO LOCAL
COUNCIL REQUIREMENTS.
‘SERVICES LEGEND
UNDERGROUND ELECTRICAL
OVERHEAD ELECTRICAL
RAINWATER DRAINAGE
Alfresco to be
reduced in size in
accordance with the
site cover plan
Sewer Easement = 274m2
Stormwater Easement (~15m2)
s\ STORIANATER -
+— TELSTRA —
—u— WATER A
- 2.x street trees to Opal St
Shared fence easement (6m2 (0.3m x 20m))
Landscaping in accordance with Planning Scheme Policy 03
DEVELOPMENT DETAILS
Density = 2 x 3+ beds (6.6)
Site Gover =220+-220-=410-(44%)-
Plot Ratio = 137 + 144 = 281m2 (27%)
Parking = 4 spaces
Landscaping = 496m2 (49%)
* New driveways and crossovers in
accordance with RS-049 & RS-050
nt - Dense landscaping around perimeters and in front of Opal St fence
Fn
Kitchen
I
OPAL STREET
TOP CONDUIT RL: 108.04
‘TOP PIPE RL: 10604
‘SEWER RISING MAIN POTHOLE
Easements fot Services (inidcative) new fence
- Sewer easement(1.5m either side of existing pipe)
- Sewer connections to be confirmed (Subject to Unitywater Approval)
- Water to new buildings (Subject to Unitywater Approval)
- Electricity to new building clear of water and sewer lines (Subject to Operational Works Approval)
- Stormwater for new building to include a 5k Litre above ground water tank for detention of new building
roof area directed to existing field inlet within Opal St (Subject to Operational Works Approval)
- All other stormwater from driveways and hardstand areas to be directed to landscaping areas to
ensure non-worsening situation to adjoining properties
50,209mm 172° 1" 2" SEWER RISING MAIN POTHOLE __|
vegetation screening buffer around fence Tneln|
ater DT
~~ Proposed
Lot 2
LL SEWERRISING MANPOTHOLE
‘TOP CONDUIT RL: 107.96
‘TOP CONDUIT RL: 108.01
APPROVED PLANS
MCU19/0013 & RAL19/0003
NOOSA COUNCIL
9 MAY 2019
Scale 1:300
0 1 2 3 4 5m
Site, Subdivision and
Preliminary Services
Layout Plan
Date: 29/01/2019
Documentiietiihe A08E8AN20808396
Version: 2\V/¥esision!Dattes iy UBD 12/01/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.