Original source · versioned page text
Response to Info_Request_sept2014
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
Fish Passage 4. The western tributary is a minor waterway for fish passage. Given the extent of works in the waterway and the proposed works are an integral part of the modelling, Council recommends the applicant gain written support from DAFF for the proposed works. Response: The proposed waterway modifications for flood mitigation and natural channel remediation do not constrict the waterway or involve any waterway barriers that would inhibit fish passage. As such there is no trigger for Waterway Barrier Operational Works application. DAFF policies do not trigger any applications under SPA for these works. As there is less than 500m3 of excavation or 150m3 of fill within the waterway bed and banks a Riverine Protection Permit application will not need to be submitted to DNRM. Swale Flow 5. Please confirm that the maximum flow through the bio retention swales in a Q100 event do not exceed 1.0m/s in accordance with Healthy Waterways Design Guidelines. Response: The swale velocity is very low at 0.24m/s in a Q100, therefore it complies with Healthy Waterways design guidelines. Footbridge Flows 6. Please confirm Q100 flood depths over the footbridge. It is unclear of the blockage factor that has been applied to the bridge and handrail and its impact on flood levels. Response: Please refer to Brisbane Stormwater Management (BSM) response on page 7 of the updated study dated 15-9-14. Hydrologic Regime 7. The hydrologic regime is proposed to be changed over 2 Pearson’s road in a minor event. Please provide owners consent from 2 Pearsons Road for this change to hydrological flows on their property. a. Nocomment on the environmental impact of this (2 Pearsons Road) change to the hydrological flow has been provided. Response to Item 7: An overall reduction in flow as shown in Table 11 of the BSM report is considered to provide an advantage for the adjacent owner of Lot 3 RP113733. Council approves minor changes to flows on adjacent properties every time a new interlot drainage line is approved. This recently occurred upstream of proposed Stage 5 of this subdivision where properties on Wilgee Court X:MOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\stage 3 & 4\Response to Info_Request_sept2014.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.