3.0 SITE SELECTION
Planning for a new fixed wireless broadband facility is a complex process. NBN Co
conducts a rigorous multi-stage scoping process, as outlined below.
3.1 Identification of areas requiring Fixed Wireless coverage
The NBN Co Fixed Wireless locations will be determined by a number of factors including
the availability of both the NBN Co Fibre transit network and the availability of Point of
Interconnect (POI)facilities to allow for the installation of NBN Co equipment. NBN Co
uses a number of methods to identify those parts of Australia that require Fixed Wireless
coverage. When an area is identified as requiring Fixed Wireless coverage, investigations
are undertaken to determine the measures required to provide this coverage.
NBN Co has identified a requirement to provide a fixed wireless facility in Cooran. The
facility will provide Fixed Wireless coverage to dwellings in the Cooran area, in addition to
serving as a key communications link for other NBN Fixed Wireless facilities in the wider
Sunshine Coast region.
3.2 Site Selection Parameters
NBN Co identifies an area where the requirement for a Fixed Wireless broadband facility
would highest, a ’search area.’ A preliminary investigation of the area is then
be
undertaken, in conjunction with planning and property consultants, radiofrequency
engineers and designers in order to identify possible locations to establish a facility.
Generally, new sites must be located within, or immediately adjacent to, the identified
search area in order to be technically feasible. However, while the operational and
geographical aspects of deploying new facilities are primary factors, there are also many
other issues that influence network design, which have to be resolved in parallel.
Some of the issues that are considered include:
. visual amenity
.
potential co-location opportunities
. the availability and suitability of land as well as a willing site provider
.
occupational health and safety
. construction issues (including structural and loading feasibility and access for
maintenance purposes)
. topographical constraints affecting network line of site
.
legislative policy constraints
. environmental impacts
. cost implications.
The number, type and height of facilities required to complete the Fixed Wireless network
are largely determined by the operational, geographical and other factors discussed
above, which influence final network design. These compounding factors often severely
restrict the available search area within which a facility can be established to provide
reliable Fixed Wireless broadband to a local community.
Figure 3.1 below, depicts the ’search area’ (in red) that was identified to provide the most
appropriate coverage levels for the Cooran area.
NBN-4TNZ-41NN-5104 - Cooran Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Planning Report MCU13/0051Related documentApplication case desk ↗
About this file
- File size
- 109 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.