Council archive · source document
Development Application part 2 Planning Report MCU13/0051
Very large file (109 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
High-speed National Broadband
Network fixed wireless for
Sunshine Coast local gpvernment area
The Sunshine Coast local governiuent1~"~~{{~...:.e~ei~~ National Broadband Network’s
(NBN)fixed wireless service ~~~ )~.r;. .: ’:"
f,~,.;:!.._
,’r:oIIP’~ ’
.~i’""lIl:’"
1’l"...Ii:’iItt; "1’:" :. .;
o;i~ "’l
NBN Co is planning to acquire and build fixed ~r:eless facilities across mon~s N.~~lf will be conducting community
Over the coming
’consultation in the su s~i~f9~~~tlocal govemment area regarding
the Sunshine Coast local
gox~thme~ afe~t ;deliver high-speed
broadband services toh
e~’and businessll’s in Belli Park" Bli Bli, the broader fixed wireless ne~Wkrkro t and about individual
Bridges, Boreen Point; labin,:Oooran, Cooroy, Cootharaba, fixed wireless facilities. "
Dulong, Gheerulla, liB’ nilworth, Kidaman Creek, Kin’Kin, "
,. .
Mapleton, Pinbar;,;,n,POT?na,Tinbeerwah,VemerdaJe and Woombye.
Other areas in the’S nshine Coast local govern’ment area will receive
Community Information Sessions 13"’, 14"’, 19’"
either fibr ’’or satellite sl:tvicesdepending on where they are located. and 20’" March 2013
~, .
,:’ If you would like to find out more about the NBN fixed wireless
The Federal GQv mment has set a target for NBN Co to connect
network in the Sunshine Coast local govemment area, please drop
93 per cenH~ith;a:’;’inimum obligation of 90 per cent)of Australian
,"’:’
’.4.’’’’ ,
.
into an Information Session near you at any time between 3pm and
homes and bU~ esses,to fibre-to-the-premises technology. To
7pm to see the information display and talk to NBN representatives.
reach all hom_es alid businesses in our vast country,fixed wireless
NBN Co is providing four Community Information Sessions at:
and satellite~erv.iC9l?~iII ~used fortile remaining parts’of Australia
including certai\1.areas in the Sunshine Coast. Fixed wireless and Cooran -
Wednesday 13’h March 2013 at the Cooran Memorial
satellite s~rvice,~’represent a significant improvement to services School of Arts Hall, King Street, Cooran
currently all~il ble):o many Au.straliansliving in rural, regional and Kenilworth Thursday 14th March 2013 at the Kenilworth Hall,
-
corm~rities.
’
remote Elizabeth Street, Kenilworth
,,"
Eumundi -
Tuesday 19’h March 2013 at the Eumundi CWA Hall,
What is fix c;l w reless technology? 80 Memorial Drive, Eumundi
NBN’sfixed’~ ~les~ network, which uses advanced technology Woombye -
Wednesday 20’h March 2013 at the Mini Auditorium,
Suncoast Church, Cnr Kiel Mountain & Schubert Roads, Woombye.
commonly re(~rr~d,to as l:rE, r4G, is’engineered to deliver services
:r’’’I\,; Id. .’, ~
to a fixed a coverage area. This means
numbe’~~f:~remiseswithin More information
that thebandwidthiJper I}ousehold is design~d to be more consistent,
even in peak times of.us_ .,:" .
~? "" .
The network will ceiiJl
use t lWol~y to transmit radio.signals to "
~’.. ~ "
and frol11 a small antenna fix_ed on the,outside of a home.or business,
which is pointed directly towartts the fiX~~’~ir~l~s$ facility.
.’
’I::
N BN’s fixed wireless facilities o)S’er~eet
’V~~’IO~le~els,~ft!1dio .
frequency electromagnetic energy (EME). The~;t~t~ltm F!~C(i:rtion
Protection and Nuclear Safety Agency (ARPANS’)la’S,’ ’tifirmed’ .
there are no established health effects from these ver t~w-p ’wrIt
radio signals. More information is available from the ARPANS’
website www.arpansa.gov.au.
Consultation and town planning requirements
NBN Co works in consultation with local councils to determine an
efflcl\::nt and effective way to rollout the fixed wireless network.
A key consideration in these decisions is the design of the
network, which takes a number of factors into account including
population density, geography, radio frequency and other
network specific considerations.
Wherever possible NBN Co looks actively to use existing
Infrastructure when planning the fixed wireless network before
proposing new structures.
2 C /11UW!’t7I’ Jt Thursday 7 March 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Planning Report MCU13/0051Related documentApplication case desk ↗
About this file
- File size
- 109 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.