Skip to the record
The only place to find full transcripts.

Council archive · source document

Development Application part 2 Planning Report MCU13/0051

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (109 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                              which will effectively screen the
                                                              equipment shelter from the
                                                              neighbouring site to the south.
                                                              This        is considered         to      be    in
                                                              accordance with S7.1.


                                                              Furthermore,                  noise            and
                                                              vibration emissions associated
                                                              with the proposed facility will be
                                                              limited        to    the       construction
                                                              phase. Noise generated during
                                                              the construction           phase will be
                                                              of short duration and will be in
                                                              accordance with the standards
                                                              outlined in the Environmental
                                                              Protection           Regulation           1998
                                                              and     Environmental Protection
                                                              (Noise)              Policy               1997.
                                                              Construction            works      will    only
                                                              occur        between       the     hours of
                                                              7.00am and 6.00pm.


                                                              There will be            some      low level
                                                              noise         from         the
                                                                                   ongoing
                                                              operation of air conditioning
                                                              equipment associated with the
                                                              outdoor             cabinets,             once

                                                              installed.          Noise
                                                                                 emanating
                                                              from  the    air  conditioning
                                                              equipment is at a comparable
                                                              level        to     a      domestic             air
                                                              conditioning installation,                     and
                                                              willgenerally accord with the
                                                              background     noise       levels
                                                              prescribed    by     Australian
                                                              Standard            AS 1055.       The          air
                                                              conditioning         unit will        be well
                                                              removed             from       surrounding
                                                              residential dwellings.

Environment            &      heritage No solution provided   037     -
                                                                          Complies.
values                                                        It     is     considered          that         the
037 There        are   no   significant                       proposed facility will have a
adverse         effects      on    the
                                                              negligible impact on the fauna
biodiversity,    natural    vegetation,                       values         of       the      site.     The
native       wildlife, habitats,                              proposed facility will not require
landscape quality, water quality                              any vegetation removal.
or  heritage values, including
those related to-
                                                              The         proposed facility will               be
a)changes to natural drainage;                                located         from   wetland
                                                                      away
b) disturbance to any of the                                  systems and will be unlikely to
wetland systems;
                                                              impact on the natural drainage
c) management of landslide and                                of the land or cause erosion of
fire risk;
                                                              the land. Furthermore, the facility
d) erosion and the transport of                               will not cause sediment run-off,
sediments offsite;
                                                              impact on effluent disposal                       or
e) unmanaged public access;                                   increase the risk of fire.
f) effluent disposal;
g) changes to fauna habitat and                               The         proposed       facility       is    not

Used in these records

About this file

File size
109 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Planning Report MCU13_0051.pdf · 109 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.