Skip to the record
The only place to find full transcripts.

Council archive · source document

09/1490 - MCU - Detached House [As Published] · 132009.1490

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

No fencing is proposed to rear boundary, and currently there is fencing constructed on the
adjoining properties side boundaries.

Signage will comply with Noosa Springs By-Laws/ Covenants
Construction Schedule
Negotiations are currently underway with a building contractor who has been involved in the
construction of several residences in Noosa Springs and therefore familiar with the Noosa
Springs regulations regarding access etc.
We anticipate commencement of this project in this year with a construction time of approximately
10-11 months.
4, AREA SCHEDULE

Zoning : Special Facilities Development

The areas schedule is included on the drawings.

Site Area 104141m2
Plot Ratio Allowed50% 520.5m2 Actual 50%
Site Cover Allowed35% 364.3m2 Actual 32% or 332.0m2
Area Schedule Residence Ground 250.0m2
Studio 25.0m2
Garage/Cart 56.0m2
First 188.0m2
Tota! 519.0m2
Covered terraces 70.0m2
Setbacks: Front -6 metres to garage corner

Rear - 6 metres to covered terrace
Side -— 1.5 metres minimum for study, kitchen,
5. ADDITIONAL INFORMATION

Wilson Residence Lot 750 The Palms Noosa Springs 5

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1490 - MCU - Detached House [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.