RFI - Revised Landscape Plans
Plans and drawings: the text below has words only, no drawings.
51 Elanda St, Sunshine Beach Landscape Operational Works Plan The landscape operational works plan package consists of the following schedule of drawings; LD1 General Notes, Sheet Layout & Site Location LD2 Project Specifications LD3 Project Specifications, Annual Maintenance & Finishes Schedule LP1 & 2 = Ground Floor / Basement LD4 LD5 Plant Schedules Typical Details T LP1 Landscape Plan (Ground 1/2) LP3 = First level LP2 LP3 LP4 Landscape Plan (Ground 2/2) Landscape Plan (First Level) Landscape Plan (Second Level) LP5 Landscape Plan (Roof) LP4 = Second level BUP102822 BUP106270 This package has been developed to comply with; T · LP5 = Roof · Noosa Plan 2020 Bioretention Technical Design Guidelines Version 1, October 2012 (Water by Design) Sources; - Architects: Archend - Civil: Recor | Project Management & Technical Services LP1 LP3-5 LP2 Sample Approvals; · Landscape Installer is to provide LA with following samples for LA approval prior to construction; T - Composted Forest Litter Certifications; · Landscape Installer is to provide LA with following certifications prior to on-maintenance inspection; ELANDA STREET 1:4 - AS 2303:2015 - AS4419 Soil Certification 1:8 - Mulch - Weed free / Pest Free 1:20 T 1:20 1:40 1:8 GTP689 TE T SW 51 Elanda St, Sunshine Beach SW SP193676 BUP9277 SW SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S LOT 2 SP164980 anembo consultants Client: Location: Project Description: Drawing Title: JOB No.: S24111298 FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LD1 C 27.11.24 COUNCIL SUBMISSION CK TH anembo consultants pty.ltd. A.B.N. 75 089 473 156 SHEET 1 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects GENERAL NOTES, Development: Lot on Plan: Project Status: SHEET LAYOUT & SITE APPROVED: A 11.11.24 FOR REVIEW CK TH not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental Development Lot 403 on RP 48112 Landscape Operational Works LOCATION CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 9 pages
Page 2
· Coordinate installation of sediment & erosion control devices with civil contractor LEVELS 3. PLANTING & GROUNDWORKS
LANDSCAPE SPECIFICATIONS to ensure compatibility & consistency in control measures. · For all road, drainage and lot levels refer to Civil drawings. Ensure civil grades
The landscape plans must be read in conjunction with the operational works · All exposed surfaces, once completed shall be immediately stabilised. and levels are maintained, any changes to be confirmed by SUPER. TREE PLANTING
landscaping decision notice once issued. This plan has been developed to
· Verify with SUPER all relevant construction levels and service locations. SUPER is · Refer to Street tree & tree planting details (as applicable) for information.
comply with the SCC Planning Scheme and the SCC Open Space SITEWORKS to advise on required outcomes where discrepancies occur, · All trees to be certified that they comply with this specification & with 'AS
Landscape Infrastructure Manual (LIM). · Remove all unwanted material, deleterious & operational debris from site. · Where critical levels need verification such as lot boundaries, services and basins 2303:2015 tree stock for landscape use'. Furnish LA with certification prior to
· Where bad ground occurs or levels provided are not functional refer to SUPER. confirmation by a licensed surveyor is required. installation.
ABBREVIATIONS · Ensure site drainage can occur to whole of site & where paths, edges, & gardens · Grade evenly between prescribed levels & finished surface levels ensuring · Landscape contractor to peg group & individual street tree positions for approval
AS - Australian Standard HD - Hot dipped etc. may impede drainage, refer to super before continuing works. positive drainage & no ponding areas. by LA & SCC before excavation.
EP - Establishment Period LA - Landscape Architect · Ensure drainage works correlate with adjacent land. · Undertake soil works in accordance with Topsoil.
· The following grades are to be followed where practicable:
N/A - Not applicable OC - On centre · Civil design has provided a positively drained site however, where drainage issues · Street trees to have a full & even crown.
- Turf 1:4 (25%) max.
MRTS - Main Roads Technical Standard MP - Maintenace Period are identified refer SUPER. · Install trees at locations indicated on the plans, per notes & details herein.
- Road reserve slope up to back of path 1:33 (3%) max.
m2 - Square metres m3 - Cubic Metres · Refer to Landscape Construction - Drainage for more information. - Gardens 1:3 (33%) max. · Root prune trees as required to meet AS 2303:2015.
NATA - National Association of Testing Authorities SUPER - Superintendent
- Slopes / inverts away from structures 1:50 (2%) min. · Install street tree drainage per detail if required by civil engineer or tree pits do not
TYP - Typical SLEEVING & CONDUITS drain after they are tested for drainage by filling with water prior to planting.
uPVC - Unplasticised polyvinyl Chloride SCC - Sunshine Coast Council · Supply & install 100mm diameter solid HVPC piping at low points under all · Tree staking - per detail.
DRAINAGE
WBD - Water by Design · All trees to be located as per SCC policy
footpaths that; · The Civil design and construction has provided a specific catchment based
· Ensure trees located in accordance with Engineering requirements for safe vehicle
- Bisect landscape areas for landscape drainage purposes. drainage outcome that drains the site. Refer to Civil Stormwater Design drawings
1. GENERAL NOTES & pedestrian sight lines.
Extend ends 300mm beyond paths, each side and cap. for detail.
PRELIMINARIES - Are required to convey roof water from lots to kerb adapters. · Landscape works are to ensure that the civil drainage intent is realised. GENERAL PLANTING
· Refer to plans by others for all services locations, footpath works, levels · Refer to Landscape Construction - Drainage for more information. · Where the Civil stormwater drainage design intent conflicts with landscape works · Refer to Topsoil Specification & detail(s) herein respectively.
(other than those indicated on these plans) & boundaries. All services & refer to SUPER for direction. · Supply & place plants according to planting schedule, setout notes & details for
related infrastructure including street lighting shown on these plans are TOPSOILS · Ensure drainage outcomes correlate with upstream and downstream catchment approval by LA prior to planting.
indicative only. In Natural Ground integrity. · Where discrepancies occur advise super prior to planting.
· Call dial before you dig 11 00 prior to any excavation. · Clear & remove all non-organic, deleterious and large organic matter such as · Landscape Plans show locations and specifications of field pits, conduits and · Ensure plants are placed & planted at equal centres, staggered, not in rows unless
· All site excavation works must comply with WHS, Excavation Works Code rocks greater than 40mm diameter, tree roots, trunks, limbs, and stumps from all subsurface drainage. Where conduits pass under paths in parks install brass D indicated on plans.
of Practice 2013 and Risk Management Principals. areas to be landscaped. on path at location. · Mass & group plantings to be spaced evenly in a triangular pattern to achieve
· In order to positively identify services prior to excavation, scan for service location · Excavate and remove off site any remaining fill to turf and garden areas to ensure · Where new field gully pits are required they are to be concrete sump with HDG optimum cover related to mature plant size and form.
verification using a CAT (Cable Avoidance Tool) scanner or similar. correct depths for topsoils. grate type, confirm size and final location with SUPER to ensure they meet the · Shrubs & spreading groundcovers to be set back a minimum 600mm from roads,
· For excavation within 2.5m of an identified service, the excavation process must · Cultivate subgrade for all street trees to a depth of 150mm for inspection before catchment needs. kerbs, garden edges & paths to allow for mature plant form. confirm with LA which
comply with the asset owner's instructions. If instructions are not available the require more distance.
installation of soil. · Conduits are required for conveyance of drainage from field gullies to the Civil
following must be adopted: · Cultivate subgrade in all turf areas to a depth of 150mm for inspection before · Terracottem universal soil conditioner. one application when planting as per
Stormwater system, roof water from lots to kerb adaptors or under structures.
-Manually excavate or Vacuum excavate to expose the services manufactures recommendation.
installation of soil. Conduits are to be 100mmØ uPVC pipe centered in a minimum 200mm x 200mm
· Soak plants thoroughly before removing from container.
for location verification prior to any mechanical or deep excavation · Cultivate subgrade in all garden areas to a depth of 300mm for inspection before trench backfilled with clean fill and minimum 300mm cover compacted to suit
plus 500mm.
· Remove plants from containers / bags / tubes carefully & inspect rootball, remove
installation of soil. surrounding landform. old matted & coiled roots to expose young roots. All stock to be free of structural
· If mechanical or deep excavation is to occur further than 2.5m from an identified · Contractor to import topsoil certified to AS4419 'Soils for Landscape and Garden · Subsurface drains are required to intercept seepage adjacent gardens, edges, defects above & below soil line (i.e. no girdled roots).
service, an assessment must be made to confirm that no services are located in Use' standard & spread to proposed plan finish levels. paths and structures. Subsurface drains are to be 100mmØ 'Ag line' centered in a · Do not mix soil from hole with mulch.
the area to be excavated such as: · To street trees install 700mm topsoil geofabric lined 300mm x 300mm trench backfilled with 20mm gravel at depths to · Roughly square hole sides.
-Scan the area to be excavated with the CAT and record findings · To turf areas install 200mm topsoil. ensure falls to receiving stormwater pits or filed gullies. · Fill hole with water, allow to drain before planting.
-Sample potholes, manual or vacuum excavate to required depth. · To garden areas install 500mm topsoil, generally with a tapering to turf and · Subsurface drains are also required under swales in large catchments to · Install fertiliser tablet(s), install plant, backfill plant with topsoil.
-Visual inspection of the area structures as required. Crown beds 100mm high at their centre point. compliment the civil drainage and enable use of the landscapes during wet · Water plant in well & maintain soil moisture levels through EP
-Utilise a spotter · Ensure smooth, flowing, even grades and positive drainage with no ponding. Fall periods. Subsurface drains are to be 100mmØ 'Ag line' centered in a geofabric · Do not compact plant pit.
· Before work commences the subcontractor is to organise a pre-start meeting with percentages 3% (minimum 2%), lined 300mm x 300mm trench backfilled with 20mmØ drainage gravel at depths to
the LA to establish scope of works, management procedures & clarify any issues. · Finished grades shall blend into existing grades providing a natural appearance ensure falls to receiving stormwater pits or filed gullies. NEW TURFED AREAS
· Install tree protection measures as per plans & detail. with no abrupt edges. · At the completion of all landscape works test all drainage systems where · Undertake soil works in accordance with Topsoil
· Prior to commencing construction works, verify dimensions, levels & location of · Trim topsoil, fill depressions & provide even falls per plans.
practicable. All damaged stormwater pipes and infrastructure are to be replaced
site services, refer engineer's drawings generally. In Podium Planter · Finished turf grades/contours shall be smooth & undulating, free from deleterious
/ relocated as necessary.
· For construction works impacting on public roads, traffic control procedures must · Waterproofing and drainage layer installed to manufacturers details and materials, debris, large clods of soil, stones, free from pest, diseases, weeds &
· Further information located in Finishes Schedule, Details and Drawings. organic matter, positive flowing min. 2% slopes & no ponding areas. Co-ordinate
be adopted complying with WHS, State requirements and Risk Management specification .
on-site with SUPER & ensure levels are approved prior to laying turf. Where turf
Principles. Refer to the Principal Contractor for coordination or contact an · Ensure protection of planter box structure and drainage infrastructure during EDGING meets hard edges, adjust finish topsoil levels to allow stormwater to flow
authorized Traffic Control Consultant for implementation. installation of landscape works. · Supply, install, & maintain edges as specified & shown on the plans & details, unimpeded over laid turf to low area respectively.
· Dimensions take precedence over scale. · Refer engineers and architects drawings for heights of planters, podium set specifically where new gardens are located adjacent to new turf areas. Tie off · Supply & lay 'A' grade turf per plans & schedule.
· Contractor to review all schedules herein to confirm their correlation to these downs and construction levels. edge ends perpendicularly to paths at kerbs at control or expansion joints. · Where turf is installed on slopes >20% (1:5) - pin turf to industry standards.
plans. Where discrepancies occur within landscape documentation refer to LA · Import GTR Podium Plus Soil (Refer finishes schedule) and spread to 50mm · Remove pins once turf is well established.
prior to provision of tender pricing &/or construction. below top of planter and tamp down. There will be 50mm settlement over first few MULCHING · Water turf in well, apply water to maintain soil moisture until established & as
weeks. · Organic and inorganic mulches are required to be installed over all garden areas required during the maintenance period to maintain health & vigour.
SEDIMENT & EROSION CONTROL · Drainage Layer: where shown on the drawings.
· The landscape contractor to implement & maintain for the contract - Drainage Cell or Gravel under Geo · All mulches supplied must be clean, free from live weeds, weed seeds
duration, best practice erosion & sediment control measures in - Cloth layer to be determined by Builder (specifically nutsedge), pests, soil borne viruses and diseases. Further SUPER
accordance with the manual for erosion & sediment control (maroon - No Controlled Release or Slow Release Fertiliser is allowed for here and will with certifications respectively for approval prior to installations.
manual), good environmental practice & the consulting civil engineers need to be applied at the point of planting. The media however has been fully · State government Fire Ants regulations must be strictly adhered to refer to
specification for erosion & sediment control. Penalties & fines for charged with nutrients etc to give plants a warm welcome & kick start when
Biosecurity QLD on 132 523 for landscape suppliers and landscape contractor's
non-compliance will apply. transplanted.
requirements.
· Install silt control fencing in accordance with site environmental management plan - Mulch types include:
& local authority regulations. 2. LANDSCAPE CONSTRUCTION - Hoop Pine Mulch @ 100mm depth to all street trees and feature gardens.
· Devices to be installed where necessary & as directed on site by super. DOCUMENTATION INFORMATION SEQUENCE - Decorative Stone - 150mm depth over pinned geo-fabric to areas
· All sediment & erosion control devices are to be installed in accordance with · For each 'Construction item' in this landscape specification the information nominated.
manufacturer's specifications. needed to understand the full scope of construction requirements occurs in a
· The contractor is responsible for ensuring sediment & erosion control devices are number of places in the documents including: · Further information located in Finishes Schedule and drawings.
inspected & maintained as follows; - Legend / Finishes Schedule for type, finish and any further
a.) During construction: - daily during dry weather construction information STEPPING STONES
- prior to predicted storm events - Details for installation specification · Pavers setout generally in according with finishes schedule & plan
- twice daily during prolonged rain - Sections for installation guidance and specification
b.) During establishment period: - weekly during dry weather · Drawings for locations, dimensions and quantities
- prior to predicted storm events · Each 'Construction item' will reference where to look (Schedule, Detail drawing) to
- twice weekly during prolonged rain find relevant information from the documentation package.
· All stockpiles are to be protected with suitable erosion control devices & graded · Where conflicts occur or further information is required refer to LA or SUPER.
to ensure control of runoff.
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LD2 C 27.11.24 COUNCIL SUBMISSION CK TH
anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 2 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: PROJECT
APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works SPECIFICATIONS CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 3
4. IRRIGATION ANNUAL MAINTENANCE REGIME - SCHEDULE
TASK FREQUENCY PERFORMANCE INDICATOR
Following notes describe the requirements for tender, design, supply and Weekly: November - February Maintain turf to present consistent &
installation of the irrigation system: Fortnightly: March - April vigorous appearance, mow to
Mowing Monthly: May - August 30mm high
· The scope of the irrigation design will be for the areas nominated on the plans by
project manager. Weekly: November - February Maintain turf neatly against any
· Provide Irrigation system design in pdf & AutoCAD format to all nominated garden Fortnightly: March - April edge & around any service or
areas for the Project Manager and Landscape Architect review prior to pre start Trimming Monthly: May - August respective cover
and initiation of project.
Spraying / Wick Every 2 weeks October - March No weeds or grass taller than plant
· The design will be based on a single point of mains nominated with supply having wiping Every 4 weeks April - September within 500mm of plants
222Kpa static pressure (Hoc) out of the water main. Other supply points are
available if required so the design will need to nominate locations and numbers of 100mm minimum required depth &/or
mulch adequate to suppress weed
further supply.
Re-mulching Once during MP & once per year growth & maintain soil moisture.
· The system will generally include:
- Hunter 'Hydrawise' WIFI Controller and decoder system Inspect planting at the start of
Spring & assess damaged, dead To achieve minimum design
- All wires and cabling as required & Rain sensor to be roof mounted planting densities and garden
or unhealthy plants. Replant as
- Cabinet inside toilet storage room with conduits out provided Re-planting required. cover
- Reduced pressure zone device for backflow prevention and Form 9 Certification
- Pipework including: 63-50mm main supply lines and 50 - 25mm lateral lines Every 2 or 3 days during EP,
weekly during MP, or as required Plants exhibit healthy growth &
- All conduits under paths and infrastructure to be marked with a bronze plaque to maintain adequate soil moisture. no signs of drought stress
Watering
with letter i.
- Valves and fittings as required including: master valve, flow monitoring device, Fertilising - required
where & when plants
electric solenoid valves, air vacuum release valves, isolating valves, quick
are not responding to Once during MP or as required Plants appear healthy exhibit
coupling valves and associated valve boxes slow release fertiliser good rate of growth.
- Pop up emitters and fittings as required including: To garden areas install pop up applied at planting
fan sprays on aluminum casings where required.
As required where plants require
· Provide a system installation work method specification that includes:
support. Allow to stake 20% of
- a system establishment monitoring and management program for 3 months post trees during EP. Allow to stake Plants growing in an upright manner
practical completion. further 20% of trees during MP
Staking
- Twelve month guarantee, maintain against faulty workmanship & materials for
system from date of practical completion. Inspection for storm Following storm event, heavy
Any damage noted and recitifed
- Provide cad 'as built' drawing when applying for practical completion clearly damage rainfall or high winds
showing main-line runs & sizes, valve types / station numbers / designed Plants have desired natural form &
Pruning - to promote Monthly during EP, every 3
pressure at valve, head types & locations. healthy plant growth months MP & beyond display healthy growth
- Attendance at Practical completion inspections
- Supply and install the approved irrigation system to all nominated garden areas.
- Refer to the Project Manager and Landscape Architect for any clarifications EP - Provide a report to SUPER Scheduled activities carried out.
during the life of the project on establishment progress at Successful establishment.
Monitoring each progress payment claim. Scheduled maintenance activities
- GPO and controller mounting space will be nominated by Project Manager.
MP - Provide completed activities carried out. Successful
- Water Meters provided by the Body Corp for RPZ and mains connections maintenance
list to SUPER after 3 months
- Liaise with Unity Water for relevant applications and certifications if required.
FINISHES SCHEDULE
5. MAINTENANCE MANAGEMENT CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
PRACTICAL COMPLETION / ON MAINTENANCE Top Soil & Soil preparation - As Smooth, uniform, & weed free
Imported site topsoil:
Top soil topsoil mulch surfaces, with no As supplied
· The Landscape Contractor shall consolidate the landscape works and make good Refer to specifications per Specification, per plan
nominated areas. deleterious materials.
all defects for practical completion.
· At practical completion the Landscape Contractor shall arrange for an "On" Uniform finish 100mm deep, free of deleterious
maintenance inspection with SUPER and SCC. Organic Mulch Street Tree garden/pt and gardens materials. General garden areas As supplied
25mm + Ø +, composted
- Hoop Pine
· Supply soil report along with required ameliorant's, Agronomist certification, Soil
depth photographic evidence with certification.
· Supply as 2305 certification to SUPER Inorganic Mulch Decorative Stone To Access Pathways 20mm Ø nominally Washed - Uniform Finish Over Geofabric Black
· The annual maintenance regime schedule describes the maintenance tasks,
frequencies and key performance indicators that the maintenance contractor is to Top Soil as per general notes -
Zoysia - Couch/Bermudagrass Smooth flowing, even & positively Bright green
follow. Turf A-Grade, free of pests and weeds 150mm deep
Turf Rolls (Sod) draining grades
MONITORING
· Regularly inspect all landscape works to monitor during construction, TE Timber Edge As Per Detail As Per Detail As Per Detail As Per Detail
establishment and maintenance.
· Review periodically to adjust, in consultation with SUPER, to suit changing
conditions. SE Steel Edge (Corten) As Per Detail As Per Detail As Per Detail As Per Detail
· Any trees with girdled or poor root growth identified during the maintenance period
will be replaced at the contractors expense.
Bluestone Double Sawn Random
· Report immediately any stolen or dead or dying plants to Super and always confirm Stepping Stone
Shape Stepping Stone Nominal: 400/500mm As Supplied Bluestone
direction on substitution or replacement with a similar size and identical species or
variety of the plant/s.
· Maintenance period of twelve (12) months from date of practical completion/on
maintenance of landscape works to streetscape.
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LD3 C 27.11.24 COUNCIL SUBMISSION CK TH
anembo consultants pty.ltd. A.B.N. 75 089 473 156
PROJECT
SPECIFICATIONS, SHEET 3 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: APPROVED:
ANNUAL MAINTENANCE T Hindley AILA 713 A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works & FINISHES SCHEDULE CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 4
PLANT SCHEDULE 1 - STREET TREES Mature PLANT SCHEDULE 4 - BASEMENT
CODE GENUS species - Common Name Qty HxW Size Staked Under Power CODE GENUS species - 'Common Name' Qty Size
STREET TREES PALMS
ACR imp ACRONYCHIA imperforata - Frase Island Apple 1 8x5 45 L Y Y CHA cas CHAMAEDOREA atrovirens - Cascade Palm 6 300mm
TOTAL 1 RHA exc RHAPIS excelsa - Rhapis Palm 4 300mm
*All trees to be 'AS 2303:2015 tree stock for landscape use' TOTAL 10
FERN
BLE gib BLECHNUM gibbum - Silver Lady 5 200mm
TOTAL 5
PLANT SCHEDULE 2 - PLANTING TO COUNCIL FOOTPATH
CODE GENUS species - 'Common Name' Qty Size Staked SHRUBS
BAN int BANKSIA integrifolia - Coastal Banksia 1 200mm
TREES COR rub CORDYLINE fruticosa - Rubra 7 200mm
CUP ana CUPANIOPSIS anacardioides - Tuckeroo 1 45L Y TOTAL 8
TOTAL 1
GROUNDCOVERS
SHRUBS CAR pig CARPOBROTUS glaucescens - Pigface 10 140mm
BAN int BANKSIA integrifolia - Coastal Banksia 10 200mm LIR jus LIRIOPE muscari - Just right 90 140mm
CAL gbf CALLISTEMON viminalis - Great Balls Of Fire 15 200mm LIR str LIRIOPE muscari - Stripey White 90 140mm
WES coa WESTRINGIA fruticosa - coastal rosemary 19 200mm TOTAL 190
TOTAL 44
GROUNDCOVER
MYO par MYOPORUM parvifolium - Pink 40 140mm
JUN con JUNIPERUS conferta - Shore Juniper 16 140mm
TOTAL 56
PLANT SCHEDULE 5 - LEVEL ONE PLANT SCHEDULE 7 - ROOF
CODE GENUS species - 'Common Name' Qty Size CODE GENUS species - 'Common Name' Qty Size
PLANT SCHEDULE 3 - GROUND FLOOR SHRUBS TREES
CODE GENUS species - 'Common Name' Qty Size NAN lem NANDINA domestica - Lemon Lime 29 200mm PAN tec PANDANUS tectorius - Screw Pine 10 300mm
XAN gla XANTHORRHOEA glauca - Blue Grass Tree 1 300mm TOTAL 10
TREES TOTAL 30
ACR imp ACRONYCHIA imperforata - Frase Island Apple 1 300mm SHRUBS
ELA ret ELAEOCARPUS reticulatus - Blueberry Ash 3 300mm GROUNDCOVERS CAL gbf CALLISTEMON viminalis - Great Balls Of Fire 10 200mm
TOTAL 4 CAS cou CASUARINA glauca - Cousin it 15 140mm CAL lit CALLISTEMON viminalis - Little John 15 200mm
CIS ell CISSUS Ellen Danica - Grape Ivy 20 140mm DIA cas DIANELLA caerulea - Cassa Blue 9 200mm
FERN DIA lit DIANELLA caerulea - Little Jess 18 140mm TOTAL 46
BLE gib BLECHNUM gibbum - Silver Lady 2 200mm DIC arg DICHONDRA argentea - Silver falls 40 140mm
TOTAL 2 JUN con JUNIPERUS conferta - Shore Juniper 8 140mm GROUNDCOVERS
VIO hed VIOLA hederacea - Native violet 10 140mm CAS cou CASUARINA glauca - Cousin it 60 140mm
SHRUBS TOTAL 111 CIS ell CISSUS Ellen Danica - Grape Ivy 30 140mm
ACA cop ACACIA cognata - Coppertips 14 200mm DIC arg DICHONDRA argentea - Silver falls 70 140mm
ACA sop ACACIA sophorae - Coastal Wattle 4 200mm JUN con JUNIPERUS conferta - Shore Juniper 18 140mm
BAN int BANKSIA integrifolia - Coastal Banksia 6 200mm LOM lit LOMANDRA confertifolia - Little Con 85 140mm
BAN sen BANKSIA integrifolia - Sentinel 9 200mm MYO par MYOPORUM parvifolium - Pink 42 140mm
BAN ver BANKSIA verticillata - Granite Banksia 17 200mm TOTAL 305
CAL gbf CALLISTEMON viminalis - Great Balls Of Fire 24 200mm PLANT SCHEDULE 6 - LEVEL TWO
DIA cas DIANELLA caerulea - Cassa Blue 9 200mm CODE GENUS species - 'Common Name' Qty Size
LAU nob LAURUS nobilis - Miles Choice 17 200mm
LEP liv LEPTOSPERMUM liversidgei - Lemon-Scented Teatree 14 200mm SHRUBS
NAN moo NANDINA domestica - Moonbay (pbr) 46 200mm NAN lem NANDINA domestica - Lemon Lime 64 200mm
WES coa WESTRINGIA fruticosa - Coastal Rosemary 14 200mm XAN gla XANTHORRHOEA glauca - Blue Grass Tree 1 300mm
TOTAL 170 TOTAL 65
GROUNDCOVERS
CAR pig CARPOBROTUS glaucescens - Pigface 40 140mm GROUNDCOVERS
BAN ble BANKSIA blechnifolia - Southern Blechnum Banksia 8 140mm CAS cou CASUARINA glauca - Cousin it 15 140mm
FIC pum FICUS pumila - Creeping Fig 10 140mm CIS ell CISSUS Ellen Danica - Grape Ivy 24 140mm
GAZ rig GAZANIA riggens - Treasure Flower 40 140mm DIA lit DIANELLA caerulea - Little Jess 30 140mm
JUN con JUNIPERUS conferta - Shore Juniper 17 140mm DIC arg DICHONDRA argentea - Silver falls 40 140mm
LOM lit LOMANDRA confertifolia - Little Con 88 140mm JUN con JUNIPERUS conferta - Shore Juniper 20 140mm
OPH jap OPHIOPOGON japonicus - Mondo Grass 22 140mm VIO hed VIOLA hederacea - Native violet 10 140mm
SEN ser SENECIO serpens - Blue Chalksticks 25 140mm ZOY ten ZOYSIA tenuifolia - Mascarene grass 15 140mm
VIO hed VIOLA hederacea - Native violet 11 140mm TOTAL 154
TOTAL 245
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LD4 C 27.11.24 COUNCIL SUBMISSION CK TH
anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 4 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works PLANT SCHEDULES CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 5
100 x 6 mm STEEL EDGING SLEEVES WELDED TO REVERSE
TYPICALLY 350 - 400mm. SPACED 1200mm APART
20mm WITH 30x30 MILD STEEL ANGLE IRON STAKE
TURF AS SPECIFIED
6mm STEEL PLATE WELDED ACROSS JOIN MULCH AS SPECIFIED
STAKES ARE WELDED TO
EDGE TO PREVENT
VERTICAL MOVEMENT
TIMBER SPECIFICATION: SECTION
UNSEASONED HARDWOOD, CLASS 1 SELECT GRADE F17, ACQ OR TANALITH E MIN. H4
TREATMENT, WITH ONE COAT OF TIMBER COATING.
GALVANISED TIMBER
4 STEEL EDGE (CORTEN) N.T.S.
FIXING SCREWS, TYP. LD4 Typical Detail
STREET TREE PLANTING DETAIL PLAN STEEL EDGE. WASHED GRAVEL
NOTES: REFER TO DETAIL AS SPECIFIED
EXTENT OF TREE PIT EXCAVATION TO BE 1800mm x 1800mm IN AREA, MINIMUM
(SUBJECT TO FOOTPATH LOCATION). REMOVE ALL EXCAVATED FILL OFF-SITE. GARDEN AS SPECIFIED
ELEVATION
150
50mm x 150mm H4 F14 HARDWOOD TIMBER TOPSOIL AS
EDGE, REFER DETAIL, TYPICAL. SPECIFIED, FINISH 100mm
HARDWOOD BELOW TOP OF EDGE TO
STAKES (2), 1200mm, MAXIMUM ALLOW FOR MULCH
SEE SECTION
2x HOT DIPPED GALVANISED TRIPLE GRIP PLAN
STREET TREE, SCREW TO FIX MITRED TIMBER EDGING
REFER DETAIL TOGETHER, TYPICAL.
BELOW. 100 x 50 mm TIMBER EDGING 50 x 25 x 450mm HARDWOOD PEG
ROOTBALL 20mm
@1200mm CENTRES 5 GRAVEL PLACEMENT - PLASTIC EDGE N.T.S.
KERB INVERT
TURF AS SPECIFIED LD4 Typical Section
MULCH AS SPECIFIED
ROAD
FIX EDGING WITH 3x F14 HARDWOOD 2x HOT DIPPED
50mm x 25mm x 450mm STAKES, WITH 2x GALVANISED TRIPLE GRIP
GALVANISED NAILS TO FIX STAKES TO SCREW TO FIX MITRED
1800mm
TOPSOIL WITH EDGING, TYPICAL. TIMBER EDGING
MULCH ABOVE TOGETHER, TYPICAL. SECTION
EDGING TO EXTEND TO FOOTPATHS WHERE
WIDTH VARIES REFER TO DWG'S
APPLICABLE WITH STREET TREE
CENTRALLY LOCATED WITHIN GARDEN
(ALLOWING FOR SERVICES SETBACKS),
2 HARDWOOD TREATED GARDEN EDGE N.T.S. MULCH
ALL EXPOSED
BLOCKWORK TO BE
REFER TO PLANS FOR PATH LOCATIONS. LD4 AS SPEC.
Typical Detail NOM 30mm 'A' HORIZON PLANTER SOIL AS SPEC. TREATED AS PER
190mm FINISHES SCHEDULE
'FIGURE 8' HESSIAN TREE TIE, TYPICAL. IRRIGATION
CONDUIT 200
COREFLUTE OR
EQUIVALENT PROTECTION
CENTRE TREE, 900mm FROM BACK OF KERB, OR BETWEEN KERB & FOOTPATH AS APPLICABLE. GARDEN AREAS TO BOARD TO PLANTER SIDES
EXTEND FROM BACK KERB TO FOOTPATH, TYP. OVER MEMBRANE TO
40mm CAP
REFER TO DWG'S
WATER PROOFING
HEIGHT VARIES
CONSULTANTS SPEC
NOTES:
ENSURE CROWN OF ROOTBALL LEVEL IS
SET HIGHER THAN ADJACENT FINISHED PLANTER MASONRY
GROUND LEVELS TO PREVENT EXCESSIVE WALLS TO STRUCTURAL
PONDING AROUND ROOTBALL. WHEN ENGINEER SPEC
NOTES:
FOOTPATH IS ADJACENT TO STREET TREE ENSURE CROWN OF ROOTBALL LEVEL IS
INSTALL ROOT BARRIER TO FOOTPATH SET HIGHER THAN ADJACENT FINISHED
SIDE OF PLANT PIT AS PER NOTES ABOVE. GROUND LEVELS TO PREVENT EXCESSIVE
PONDING AROUND ROOTBALL.
PODIUM SLAB PODIUM SLAB
FULL & EVEN CROWN, TYP. FULL & EVEN CROWN, TYP.
DRAINAGE CELL (30mm
WATERPROOF MEMBRANE
ATLANTIS DRAINAGE
50mm WIDE HESSIAN TREE TIES WRAPPED 50mm WIDE HESSIAN TREE TIES WRAPPED AND ROOT BARRIERS TO TOPPING SLAB (IF
CELL OR EQUIVALENT)
LOOSELY AROUND TRUNK, THEN A FIGURE 8 & LOOSELY AROUND TRUNK, THEN A FIGURE 8 & WATER PROOFING NECCESARY) NOM. 55mm.
SECURED TO STAKE WITH GALVANISED NAILS SECURED TO STAKE WITH GALVANISED NAILS CONSULTANT SPECIFICATION REFER TO STRUCTURAL
OR STAPLES. POSITION TREE TIE BETWEEN OR STAPLES. POSITION TREE TIE BETWEEN ENGINEER FOR DETAIL
1/3 TO 1/2 OVERALL HEIGHT OF TREE. PODIUM DRAINAGE
1/3 TO 1/2 OVERALL HEIGHT OF TREE.
REFER TO HYDRAULIC
2 - 50 x 50 x 2400mm F14 HARDWOOD ENGINEERING DRAWINGS
2 - 50mm x 50mm x 2400mm F14 HARDWOOD
CENTRALLY POINTED NON-TREATED STAKES. FOR DETAIL
CENTRALLY POINTED NON-TREATED STAKES
(SHOWN PERPENDICULAR TO KERB FOR STAKES TO BE DRIVEN VERTICALLY INTO
GRAPHIC CLARITY ONLY). STAKES TO BE GROUND OUTSIDE OF THE ROOTBALL &
DRIVEN VERTICALLY INTO GROUND OUTSIDE SHALL HAVE A FINISHED HEIGHT LOWER
OF THE ROOTBALL & SHALL HAVE A FINISHED THAN THE TREES LOWER LATERAL LIMBS. 6 PLANTER ON PODIUM N.T.S.
HEIGHT LOWER THAN THE TREE'S LOWER
FORM SHALLOW SAUCER SHAPED LD4 Typical Section
LATERAL LIMBS.
DEPRESSION AROUND BASE OF PLANT.
FORM SHALLOW SAUCER SHAPED KEEP MULCH NOM. 50mm FROM TRUNK
900mm
DEPRESSION AROUND BASE OF PLANT. KEEP 900mm 900mm BASE.
min. 900mm MULCH NOM. 50mm FROM TRUNK BASE.
100mm DEEP ORGANIC MULCH AS 100mm DEEP ORGANIC MULCH AS
NOMINATED. MOUND MULCH AT EDGE OF NOMINATED. MOUND MULCH AT EDGE OF
2 x POT Ø. PLANT PIT TO COLLECT WATER TO FALL 2 x POT Ø PLANT PIT TO COLLECT WATER TO FALL PLANT PIT 2X WIDTH OF 2x POT Ø SHRUB / GROUNDCOVER / TUFTY
DOWN EDGES OF PLANT PIT. DOWN EDGES OF PLANT PIT. DO NOT MULCH RESEPCTIVE POT. SCARIFY ALL
POT Ø POT Ø GRASS PLANT SPECIES PER PLAN
WITHIN 50mm OF PLANT STEM. PIT WALLS & BOTTOM, TYP.
TURF AS SPECIFIED. POT Ø
TURF OR GARDEN, REFER TO PLAN.
BACKFILL PLANT PIT WITH 100mm ORGANIC MULCH PER AS
TIMBER EDGE DETAIL. TOPSOIL AS PER GENERAL NOTES, SPECIFIED, KEEP MINIMUM 50mm
SPADE EDGE, REFER TO DETAIL. AVOID COMPACTION, TYP. FROM PLANT STEM. FORM SHALLOW
TREE PIT TO BE EXCAVATED TO NOMINAL DISH DRAIN TO BASE OF PLANT, TYP.
TOPSOIL PROFILE AS PER GENERAL NOTES GARDEN BED TOPSOIL AS
DEPTH OF 600mm. BACKFILL HOLE WITH PROJECT SPECIFICATIONS. PER GENERAL NOTES, AVOID
600mm
TOPSOIL PER SPECIFICATIONS FIRMING
TREE PIT TO BE EXCAVATED TO NOMINAL COMPACTION, TYP.
PROGRESSIVELY. ALL EXCAVATED FILL TO
200mm 150mm 300mm
BE REMOVED OFF SITE. DEPTH OF 600mm. BACKFILL HOLE WITH
DEPTH VARIES
100mm, TYP.
100% TOPSOIL PER SPECIFICATIONS FIRMING
COMPACTED SOIL UNDER TREE PROGRESSIVELY. EXCESS EXCAVATED SOIL 10mg TERRAFORM PRODUCT
TO BE REMOVED OFF SITE. GRANULES
PROVIDE CLEAN CONNECTION TO ROAD 2x ROOTBALL
SCARIFY PIT WALLS & CULTIVATE PIT
DRAINAGE AS ADVISED ON SITE BY CIVIL DEPTH, TYP.
BOTTOM 150mm, TYP.
ENGINEER. TYPICAL: 100mm DEEP UNIFORM
GRAVEL LAYER. TERRACOTTEM UNIVERSAL SOIL CONDITIONER. 150mm, TYP. 150mm DEEP CULTIVATED
ONE APPLICATION WHEN PLANTING AS PER SUBGRADE, OR AS PER
150mm CULTIVATED SUBGRADE & PIT WALLS. MANUFACTURES RECOMMENDATIONS EXISTING SUBGRADE, TYP. GENERAL NOTES, TYP.
TERRACOTTEM UNIVERSAL SOIL CONDITIONER.
ONE APPLICATION WHEN PLANTING AS PER COMPACTED SOIL UNDER TREE
MANUFACTURES RECOMMENDATIONS
1 STREET TREE PLANTING - TIMBER EDGES N.T.S. 3 TREE PLANTING - in GARDEN or TURF N.T.S. 7 POTTED SHRUB, GROUNDCOVER OR TUFTY GRASS PLANTING
LD4 Typical Section Detail LD4 Typical Section LD4 Typical Section Detail N.T.S.
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LD5 C 27.11.24 COUNCIL SUBMISSION CK TH
anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 5 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works TYPICAL DETAILS CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 6
T
WARNING
LANDSCAPE PLAN (GROUND 1/2)
LEGEND
THE LOCATION OF EXISTING & PROPOSED TELSTRA,
ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
STREET TREE GARDEN WITH TIMBER EDGE DECORATIVE STONE TIMBER EDGE
& DURING CONSTRUCTION OBTAIN THE LOCATION OF
Refer to Plans, Specification Notes, Finishes Refer to Plan, Specification Notes TE Refer to Plan, Typical Details, Specification ALL SERVICES (UNDERGROUND & OVERHEAD) FROM
Schedule, Typical Details & Plant Schedule 1 & Finishes Schedule Notes & Finishes Schedule THE RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN.
PLANTING TO COUNCIL FOOTPATH STEEL EDGE (CORTEN)
DECORATIVE BRICK PAVER
Refer to Plans, Specification Notes, Finishes Refer to Architects For Further Information SE Refer to Plan, Typical Details,
Schedule, Typical Details & Plant Schedule 2 Specification Notes & Finishes Schedule
T
MULCHED GARDEN WITH TREES STEPPING STONE PROPERTY BOUNDARY
Refer to Plans, Specification Notes, Finishes Refer to Plan, Specification Notes Refer to Plans & Specification Notes 3 ACA cop
Schedule, Typical Details & Plant Schedule 3 & Finishes Schedule
TURF MULCHED ACCESS PATH (500mm)
Refer to Plans, Specification Notes & Finishes Refer to Plan, Specification Notes
Schedule & Finishes Schedule
5 BAN ver
3 ACA cop
T
5 LAU nob
2 BAN ver
3 ACA cop
5 LAU nob
T
eme nt
1 BAN int 1:4 o Bas
dary D own T
rty Boun rivew
a y
Prope D
20 CAR pig
30 GAZ rig
Corten Steel Edge
10 FIC pum
TE
Refer to Specification Notes & Finishes 1:8
T
Schedule For Further Information
15 SEN ser Decorative Stone.
Turf To Disturbed Areas Refer to Specification Notes & Finishes
Schedule For Further Information
Stepping Stones.
1:20 Unit 1 Gate Access. Refer to Specification Notes & Finishes
Refer to Architects For Further Information Schedule For Further Information
SE
Decorative Brick Paver. Feature Rocks By Builder
T
Refer to Architects For Further Information
1:20 Water Feature by Builder
6 JUN con 1 ARC imp
SE
Driveway Crossover.
Refer to Civil For Further Information 1:40
1:8 10 GAZ rig 2
4 OPH jap 6 VIO hed
1
9 BAN sen Corten Steel Edge.
Fire stair Refer to Specification Notes & Finishes
Corten Steel Edge. Fence By Architects Exit Schedule For Further Information
Refer to Specification Notes & Finishes Visitor Parking 5 VIO hed
T
F1
Schedule For Further Information F1 Stepping Stones.
15 LOM lit Refer to Specification Notes & Finishes
SE
Schedule For Further Information
TE
4 DIA cas
1 BLE gib
Unit 2 Gate Access.
1 BLE gib
SE
Water & Rock Features By Builder Refer to Architects For Further Information
10 CAR pig F1 5 LOM lit
TE
TE 12 LOM lit 2 NAN moo
10 SEN ser 5 NAN moo 5 NAN moo 5 NAN moo 5 NAN moo
40 LOM lit
6 OPH jap
4 JUN con
T
TE
1 ACR imp
With Timber Edge 12 OPH jap Letterbox
TE
2 DIA cas
Pedestrian Access From Street
1 BAN int 1 BAN int 1 BAN int 1 BAN int
2 BAN ble 2 BAN ble 2 BAN ble 2 BAN ble
T
Turf To Disturbed Areas
T
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP1 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 6 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (GROUND 1/2) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 7
LANDSCAPE PLAN (GROUND 2/2) 3 BAN ver
2 ACA cop
1 ELA ret
5 LAU nob
4 JUN con
3 ACA cop 4 CHA cas
7 BAN ver 1 RHA exc
2 LAU nob
1 BLE sil
7 CAL gbf
3 JUN con
2 COR rub
50 LIR jus
50 Lir str
0.5m Mulched Maintenance Pathway 1 RHA exc
2 COR rub
Alternate in groups of 3 - 5:
UNIT 1 13 CAL gbf 2 BLE sil
14 WES coa
1 RHA exc
Pool
2 CHA cas
Pool
5 LIR jus
Bicycle Open 5 LIR str
LIFT 1 ELA ret Storage Ramp
1 RHA exc
3 NAN sac
4 ACA sop
2 BLE sil
5 LIR jus
Edge Planting To Maintenance Path / Civil Disturbed Works 14 LEP liv 5 LIR str
Refer To Inset - Basement Planting 1 RHA exc
UNIT 2
3 COR rub
1 BAN int
10 CAR pig
Property Boundary
40 LIR jus
40 Lir str
1 BAN int
3 LOM lit 10 CAR pig
3 LOM lit 10 NAN moo
UP
4 CAL gbf
10 LOM lit
3 DIA cas
1 ELA ret
8 NAN moo
3 NAN moo
3 LOM lit
SW
SW
INSET - BASEMENT PLANTING
SW
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 SW NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP2 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 7 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (GROUND 2/2) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 8
LEGEND LANDSCAPE PLAN (FIRST FLOOR)
STREET TREE GARDEN WITH TIMBER EDGE
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 1
PLANTING TO COUNCIL FOOTPATH
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 2
MULCHED GARDEN WITH TREES
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 3
3 DIA lit
TURF 8 CIS ell
Refer to Plans, Specification Notes & Finishes
Schedule
1 CIS ell 4 JUN con
DECORATIVE STONE 1 CIS ell
Refer to Plan, Specification Notes ry
& Finishes Schedule rty Bounda 8 NAN lem
Prope 3 DIA lit
DECORATIVE BRICK PAVER
Refer to Architects For Further Information
STEPPING STONE
Refer to Plan, Specification Notes 5 CAS cou
& Finishes Schedule
MULCHED ACCESS PATH (500mm)
Refer to Plan, Specification Notes
Balcony
& Finishes Schedule
3 DIA lit
TIMBER EDGE
TE Refer to Plan, Typical Details, Specification
Notes & Finishes Schedule
UNIT 3
STEEL EDGE (CORTEN)
SE Refer to Plan, Typical Details, 10 DIC arg
Specification Notes & Finishes Schedule 6 NAN lem
PROPERTY BOUNDARY
Refer to Plans & Specification Notes
10 DIA arg 3 DIA lit
WARNING LIFT
THE LOCATION OF EXISTING & PROPOSED TELSTRA,
ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
1 XAN gla
& DURING CONSTRUCTION OBTAIN THE LOCATION OF 10 DIC arg
ALL SERVICES (UNDERGROUND & OVERHEAD) FROM 10 VIO hed
THE RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN.
3 DIA lit
5 CAS cou
Balcony
UNIT 4
10 DIA arg 3 DIA lit
6 NAN lem
4 JUN con
5 CAS cou
1 CIS ell
1 CIS ell 9 NAN lem 8 CIS ell
Property Boundary
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP3 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 8 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (FIRST FLOOR) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 9
LEGEND LANDSCAPE PLAN (SECOND FLOOR)
STREET TREE GARDEN WITH TIMBER EDGE
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 1
PLANTING TO COUNCIL FOOTPATH
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 2
MULCHED GARDEN WITH TREES
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 3 15 ZOY ten
3 DIA lit
TURF 4 JUN con
Refer to Plans, Specification Notes & Finishes
Schedule 6 CIS ell 3 DIA lit
4 JUN con
DECORATIVE STONE 14 NAN lem
Refer to Plan, Specification Notes ry
ounda 3 DIA lit
& Finishes Schedule
Prop erty B
3 DIA lit
DECORATIVE BRICK PAVER
Refer to Architects For Further Information
10 NAN lem 2 JUN con
STEPPING STONE
Refer to Plan, Specification Notes 2 CIS ell 5 CAS cou
& Finishes Schedule
MULCHED ACCESS PATH (500mm)
2 CIS ell
Refer to Plan, Specification Notes 2 CIS ell Balcony
& Finishes Schedule
TIMBER EDGE
3 DIA lit
TE Refer to Plan, Typical Details, Specification
Notes & Finishes Schedule
UNIT 5
STEEL EDGE (CORTEN)
SE Refer to Plan, Typical Details, 10 DIC arg
Specification Notes & Finishes Schedule
5 NAN lem
PROPERTY BOUNDARY
Refer to Plans & Specification Notes
10 DIA arg 3 DIA lit
WARNING LIFT
THE LOCATION OF EXISTING & PROPOSED TELSTRA,
ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO 1 XAN gla
& DURING CONSTRUCTION OBTAIN THE LOCATION OF 10 DIC arg
ALL SERVICES (UNDERGROUND & OVERHEAD) FROM 10 VIO hed
THE RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN.
3 DIA lit
5 CAS cou
UNIT 6 Balcony
10 DIA arg 3 DIA lit
8 NAN lem
4 JUN con
5 CAS cou
3 DIA lit
2 CIS ell 2 CIS ell 9 NAN lem 2 CIS ell 6 CIS ell 18 NAN lem 3 DIA lit 6 JUN con
Property Boundary
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP4 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 9 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (SECOND FLOOR) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Page 10
LEGEND LANDSCAPE PLAN (ROOF)
STREET TREE GARDEN WITH TIMBER EDGE
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 1
PLANTING TO COUNCIL FOOTPATH
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 2
MULCHED GARDEN WITH TREES
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 3
TURF
Refer to Plans, Specification Notes & Finishes
Schedule
8 MYO par 2 DIA cas
DECORATIVE STONE
Refer to Plan, Specification Notes y 1 PAN tec 12 DIC arg
undar
& Finishes Schedule rty Bo
Prope 10 CIS ell
DECORATIVE BRICK PAVER
Refer to Architects For Further Information
25 DIC arg
1 PAN tec
STEPPING STONE 1 PAN tec
Refer to Plan, Specification Notes 8 MYO par
& Finishes Schedule 5 CAL lit 8 MYO par 16 CAS cou
MULCHED ACCESS PATH (500mm)
Refer to Plan, Specification Notes
10 CIS ell 15 LOM lit
& Finishes Schedule 2 JUN con
TIMBER EDGE 1 DIA cas
TE Refer to Plan, Typical Details, Specification
Notes & Finishes Schedule
1 PAN tec
STEEL EDGE (CORTEN)
SE Refer to Plan, Typical Details, 25 LOM lit
Specification Notes & Finishes Schedule
15 CAS cou
1 DIA cas
PROPERTY BOUNDARY 4 CAL lit
Refer to Plans & Specification Notes 5 JUN con
Spa
1 PAN tec
WARNING
THE LOCATION OF EXISTING & PROPOSED TELSTRA,
ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
& DURING CONSTRUCTION OBTAIN THE LOCATION OF Pool
ALL SERVICES (UNDERGROUND & OVERHEAD) FROM 30 LOM lit
THE RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN. 10 DIC arg
10 CAL gbf
5 MYO par
1 PAN tec
Spa
4 JUN con
1 DIA cas 1 PAN tec 6 DIC ar
3 JUN con
40 ZOY ten 6 CAL lit
Pool
7 DIC arg
1 PAN tec
15 LOM lit 14 CAS cou
1 DIA cas 2 DIA cas
15 CAS cou
5 MYO par 4 JUN con
1 DIA cas 10 CIS ell 1 PAN tec 8 MYO par 10 DIC arg
1 PAN tec
Property Boundary
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP5 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 10 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (ROOF) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture