               4.     IRRIGATION                                                                          ANNUAL MAINTENANCE REGIME - SCHEDULE
                                                                                                          TASK                    FREQUENCY                            PERFORMANCE INDICATOR
               Following notes describe the requirements for tender, design, supply and                                           Weekly: November - February          Maintain turf to present consistent &
               installation of the irrigation system:                                                                             Fortnightly: March - April           vigorous appearance, mow to
                                                                                                          Mowing                  Monthly: May - August                30mm high
               · The scope of the irrigation design will be for the areas nominated on the plans by
                 project manager.                                                                                                 Weekly: November - February          Maintain turf neatly against any
               · Provide Irrigation system design in pdf & AutoCAD format to all nominated garden                                 Fortnightly: March - April           edge & around any service or
                 areas for the Project Manager and Landscape Architect review prior to pre start          Trimming                Monthly: May - August                respective cover
                 and initiation of project.
                                                                                                          Spraying / Wick         Every 2 weeks October - March        No weeds or grass taller than plant
               · The design will be based on a single point of mains nominated with supply having         wiping                  Every 4 weeks April - September      within 500mm of plants
                 222Kpa static pressure (Hoc) out of the water main. Other supply points are
                 available if required so the design will need to nominate locations and numbers of                                                              100mm minimum required depth &/or
                                                                                                                                                                 mulch adequate to suppress weed
                 further supply.
                                                                                                          Re-mulching             Once during MP & once per year growth & maintain soil moisture.
               · The system will generally include:
                 - Hunter 'Hydrawise' WIFI Controller and decoder system                                                          Inspect planting at the start of
                                                                                                                                  Spring & assess damaged, dead To achieve minimum design
                 - All wires and cabling as required & Rain sensor to be roof mounted                                                                              planting densities and garden
                                                                                                                                  or unhealthy plants. Replant as
                 - Cabinet inside toilet storage room with conduits out provided                          Re-planting             required.                        cover
                 - Reduced pressure zone device for backflow prevention and Form 9 Certification
                 - Pipework including: 63-50mm main supply lines and 50 - 25mm lateral lines                                      Every 2 or 3 days during EP,
                                                                                                                                  weekly during MP, or as required Plants exhibit healthy growth &
                 - All conduits under paths and infrastructure to be marked with a bronze plaque                                  to maintain adequate soil moisture. no signs of drought stress
                                                                                                          Watering
                   with letter i.
                 - Valves and fittings as required including: master valve, flow monitoring device,       Fertilising - required
                                                                                                          where & when plants
                   electric solenoid valves, air vacuum release valves, isolating valves, quick
                                                                                                          are not responding to Once during MP or as required          Plants appear healthy exhibit
                   coupling valves and associated valve boxes                                             slow release fertiliser                                      good rate of growth.
                 - Pop up emitters and fittings as required including: To garden areas install pop up     applied at planting
                   fan sprays on aluminum casings where required.
                                                                                                                                  As required where plants require
               · Provide a system installation work method specification that includes:
                                                                                                                                  support. Allow to stake 20% of
                 - a system establishment monitoring and management program for 3 months post                                     trees during EP. Allow to stake      Plants growing in an upright manner
                   practical completion.                                                                                          further 20% of trees during MP
                                                                                                          Staking
                 - Twelve month guarantee, maintain against faulty workmanship & materials for
                   system from date of practical completion.                                              Inspection for storm    Following storm event, heavy
                                                                                                                                                                       Any damage noted and recitifed
                 - Provide cad 'as built' drawing when applying for practical completion clearly          damage                  rainfall or high winds
                   showing main-line runs & sizes, valve types / station numbers / designed                                                                            Plants have desired natural form &
                                                                                                          Pruning - to promote Monthly during EP, every 3
                   pressure at valve, head types & locations.                                             healthy plant growth months MP & beyond                      display healthy growth
                 - Attendance at Practical completion inspections
                 - Supply and install the approved irrigation system to all nominated garden areas.
                 - Refer to the Project Manager and Landscape Architect for any clarifications                                    EP - Provide a report to SUPER       Scheduled activities carried out.
                   during the life of the project                                                                                 on establishment progress at         Successful establishment.
                                                                                                          Monitoring              each progress payment claim.         Scheduled maintenance activities
                 - GPO and controller mounting space will be nominated by Project Manager.
                                                                                                                                  MP - Provide completed activities    carried out. Successful
                 - Water Meters provided by the Body Corp for RPZ and mains connections                                                                                maintenance
                                                                                                                                  list to SUPER after 3 months
                 - Liaise with Unity Water for relevant applications and certifications if required.

                                                                                                          FINISHES SCHEDULE
               5. MAINTENANCE MANAGEMENT                                                                  CODE ITEM                                    PRODUCT / DESCRIPTION                        SIZE / PATTERN                                      FINISH                                                              COLOUR
               PRACTICAL COMPLETION / ON MAINTENANCE                                                                                                                                                Top Soil & Soil preparation - As                    Smooth, uniform, & weed free
                                                                                                                                                       Imported site topsoil:
                                                                                                                       Top soil                                                                                                                         topsoil mulch surfaces, with no                                       As supplied
               · The Landscape Contractor shall consolidate the landscape works and make good                                                          Refer to specifications                      per Specification, per plan
                                                                                                                                                                                                    nominated areas.                                    deleterious materials.
                 all defects for practical completion.
               · At practical completion the Landscape Contractor shall arrange for an "On"                                                                                                                                                             Uniform finish 100mm deep, free of deleterious
                 maintenance inspection with SUPER and SCC.                                                          Organic Mulch                     Street Tree garden/pt and gardens                                                                materials. General garden areas                                       As supplied
                                                                                                                                                                                                    25mm + Ø +, composted
                                                                                                                                                       - Hoop Pine
               · Supply soil report along with required ameliorant's, Agronomist certification, Soil
                 depth photographic evidence with certification.
               · Supply as 2305 certification to SUPER                                                               Inorganic Mulch                   Decorative Stone To Access Pathways          20mm Ø nominally                                    Washed - Uniform Finish Over Geofabric                               Black
               · The annual maintenance regime schedule describes the maintenance tasks,
                 frequencies and key performance indicators that the maintenance contractor is to                                                                                                   Top Soil as per general notes -
                                                                                                                                                       Zoysia - Couch/Bermudagrass                                                                      Smooth flowing, even & positively                                    Bright green
                 follow.                                                                                               Turf                            A-Grade, free of pests and weeds             150mm deep
                                                                                                                                                                                                    Turf Rolls (Sod)                                    draining grades
               MONITORING
               · Regularly inspect all landscape works to monitor during construction,                          TE   Timber Edge                       As Per Detail                                As Per Detail                                       As Per Detail                                                        As Per Detail
                 establishment and maintenance.
               · Review periodically to adjust, in consultation with SUPER, to suit changing
                 conditions.                                                                                    SE   Steel Edge (Corten)               As Per Detail                                As Per Detail                                       As Per Detail                                                        As Per Detail
               · Any trees with girdled or poor root growth identified during the maintenance period
                 will be replaced at the contractors expense.
                                                                                                                                                       Bluestone Double Sawn Random
               · Report immediately any stolen or dead or dying plants to Super and always confirm                   Stepping Stone
                                                                                                                                                       Shape Stepping Stone                         Nominal: 400/500mm                                  As Supplied                                                          Bluestone
                 direction on substitution or replacement with a similar size and identical species or
                 variety of the plant/s.
               · Maintenance period of twelve (12) months from date of practical completion/on
                 maintenance of landscape works to streetscape.




                                                                                                                                                                                                                                                                                                                                                         anembo consultants
Client:                            Location:                                      Project Description:                                        Drawing Title:               JOB No.: S24111298
                                                                                                                                                                           FILE: 250321                D   21.03.25   ARCH BASE UPDATE     CK   TH
ArchEnd                            51 Elanda St, Sunshine Beach                   Landscape Works                                                                          DWG. No.   LD3              C   27.11.24   COUNCIL SUBMISSION   CK   TH
                                                                                                                                                                                                                                                                                                                                                         anembo consultants pty.ltd.     A.B.N. 75 089 473 156
                                                                                                                                              PROJECT
                                                                                                                                              SPECIFICATIONS,     SHEET 3 OF 10                        B   21.11.24      FOR REVIEW        CK   TH                                        This document is the copyright of anembo consultants & shall   PO Box 24 Moffat Beach Q 4551   Landscape Architects
Development:                       Lot on Plan:                                   Project Status:                                                                 APPROVED:
                                                                                                                                              ANNUAL MAINTENANCE T Hindley AILA 713                    A   11.11.24      FOR REVIEW        CK   TH
                                                                                                                                                                                                                                                                                          not be copied without written approval, nor shall it be used   Ph: 07 5437 0000                Project Management
                                                                                                                                                                                                                                                                                          except for the development and the site specified. Scale can   email: [email protected]                Environmental
Development                       Lot 403 on RP 48112                             Landscape Operational Works                                 & FINISHES SCHEDULE CATEGORY: MHD                    ISSUE DATE            DESCRIPTION       DWN CKD ISSUE DATE     DESCRIPTION   DWN CKD
                                                                                                                                                                                                                                                                                          not be guaranteed when printing from PDF files.                www.anembo.com                          Arboriculture
Log in to download the original file

RFI - Revised Landscape Plans.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.