Skip to the record
Accept no substitutions.

Original source · versioned page text

Delegated Report - Code - Planning OPW21 0188

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Author	Development Engineer, Laurie Schreck
Development Assessment

APPLICATION DETAILS
Application No.	OPW21/0188
Applicant	Queensland Country Womens Association
Proposal	Operational Works - Roadworks, Stormwater
Properly Made Date	12 July 2021
Information Request Date	28 July 2021
Information Response Date	16 August 2021
Decision Due Date	24 September 2021
Report Completed Date	19 August 2021
Report Reviewed By	Mark Lewis

PROPERTY DETAILS
Property Address	21 Maple St Cooroy Qld 4563
RP Description	Lot 21 SP 301624
Land Area	630.0000 m²
Existing Use of Land	Community Hall (CWA)

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	District Centre
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Heritage and Character Area Overlay – Character Area
Assessment Type	Code
PROPOSAL
The application seeks approval for an Operational Works – Roadworks and Stormwater.
The locality and proposal plan are included below.
Figure 1 – Locality

Figure 2 – Site Plan

Figure 3 – Works Plan

site details
Background
This Op Works application has been submitted for the construction of a carpark at the rear of the CWA Hall in Cooroy. The area is currently used for parking but is unsealed and not formalised.
Site Description
The subject site for the carpark is flat and currently has a gravel surface which has been used for car parking. A slight grade on the constructed car park will allow the water to drain to the proposed concrete invert channel on the eastern side of the carpark.
The concrete invert will drain into a 150dia PVC pipe which will connect into an existing stormwater line which appears to be a private asset. A letter has been provided from the RSL (existing stormwater line asset owner) granting permission for the connection of the proposed stormwater line.
The existing sewer main that runs through the works area appears to be approx. 3m in depth. With the proposed stormwater line invert level relatively shallow, there is no clash with the sewer line or its vertical clearance.
Surrounding Land Uses

assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Driveway and Parking Code;
Earthworks Code;
Water Quality and Drainage Code.
cONSULTATION
Referral Agencies
Not applicable.
Internal Council Referrals
Not applicable.
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW21/0188 for an Operational Works – Roadworks and Stormwater situated at 21 Maple St Cooroy Qld 4563 and described as Lot 21 SP 301624, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW21/0188
Street address:	21 Maple St Cooroy Qld 4563
Real property description:	Lot 21 SP 301624
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works – Roadworks and Stormwater.
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
21501-C01	B	Carpark General Arrangement Linemarking, Pavement & Drainage as prepared by Tod Engineers & Project Managers	16 August 21
21501-C02	A	Carpark Vehicle Layout as prepared by Tod Engineers & Project Managers	21 June 21
CURRENCY PERIOD
The Currency Period for this development approval lapses if the development has not substantially started by 24 August 2023, unless an application to extend the currency period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
A condition report including photographs of the area surrounding the works site must be completed and submitted to Council prior to or at the prestart meeting prior to any works commencing.
Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Erosion and sediment control works; and
Other relevant parties
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
Appropriate traffic and pedestrian signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD);
Maintenance of safe pedestrian access around the site both during daily construction and after daily construction has ceased; and
Any proposed fencing to the site during the construction phase of the development.
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures.
Include a post out to the local businesses advising of the proposed development, the expected time frames and the site contact details.
Include signage in prominent locations on the boundaries of the site advising of the proposed works, the expected time frames and the site contact details.
Any changes to the details associated with the Supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The developer must meet any costs to repair damage to any Council asset, other service authority’s assets or the downstream private stormwater network during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice;
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; and
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Pavement Design and Construction
Pavement design for privately owned works must be undertaken in accordance with the relevant standards.  Structural integrity of the car park area will remain the responsibility of the property owner/developer and must be certified by an RPEQ.
All pavement and invert drain construction works must join neatly to the existing pavement so that there are no irregularities in line or level resulting at or adjacent to the join for the length of the construction. Where necessary the existing pavement must be brought to a satisfactory standard to allow for the above.
Works within Road Reserve/Reinstatement
Safe pedestrian access on all streets in the vicinity of the development and in the road reserve at the rear of the development must be maintained at all times. Should any footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All works must match neatly with the existing surrounding features. Additional works beyond the subject site may be required to provide an acceptable transition to existing adjacent profiles.
Stormwater Drainage
Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets.
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows).
Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties.  The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have:
Been revised to address predicted rainfall events, and
Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be found inefficient.
The erosion and sediment control measures must be designed, installed and maintained in accordance with the Supervising Engineers instructions and the current best practice standards * (Refer to Advisory Note).
The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring.
The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways.
Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
FOLLOWING CONSTRUCTION
Certification
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
As this carpark is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the carpark to ensure it is constructed in accordance with relevant standards.
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control
Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ).
As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection:
Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and
Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination.
If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability:
evidence that the site has been effectively stabilised in the short term;
evidence that soil has been adequately ameliorated;
evidence that seed of annual and perennial grass species has been applied at an adequate rate; and
that grass seed has germinated at a density that is likely to achieve an effective grass cover.
For example, while hydromulch can provide an immediate and effective stabilising cover to soils, the protective cover can be relatively short-lived if vegetation fails to establish before the thin layer of mulch decomposes. So if hydromulch is selected as the method of temporary short term stabilisation, Council Officers will seek to confirm that perennial as well as annual grasses are well established at the time of plan sealing to reduce the risk of instability of the site in the medium to long term. As a general rule, hydromulch will only be accepted as a “patch” fix and should comprise no more than 20% of the exposed site area due to the high risk of failure. Due to the requirement to progressively stabilise exposed areas, it is not envisioned that this will present any difficulties for an appropriately managed and compliant site
Advertising Devices
All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1 (Administration) 2015 including both temporary and permanent signage. All freestanding, pylon or pole signs or signage that is illuminated requires approval from Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is prohibited from being erected in the Shire.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 8 of 10

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.png (image text)]
D
tory
in
aD
all
a
Bis
Mill
=
|
>
Be

[Attachment: image2.png (image text)]
y

vj

 


[Attachment: image3.png (image text)]
 

 

 

 

 

 

 

 

 

 

 

 

7 [eraveicaronrans

 

  
 
  
 
  
 
  
 
 
 
 
 
 
 
 
  
  
   
 
 
 
 
  
  
 
  
 
 
   
   
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|PROPOSED 600x600 |
enn ENSOTHLY WT // \Wsnapen
sxeme Soars rey] [TSS] SHAPED or
= st: t11e60
[Excrwe Concnene Pars Wet S10
PROPOSED 9150 PVC PIPE
ry | / |lencts: 23.050m
¢ // |eRae:_1in200
3 T I
& | | / [esses ro wanrane|
&/ onneemeareeomeD | { |eseenon tor
©] counTRY WOMEN'S fl pe | {| —[eeaope ss)
‘ASSOCIATION 5 \ [PROPOSED 600x600]
RODE ERENCE RESTON] t |W SHAPED
[cons caro souneer GRATED MLET PIT
Su: Treas
lus 114510
ee \ (2 a
a € &
\ PROPOSED CONCRETE CHANNEL &
Ee LTT TO] (ere :
oe [PROPOSED CARPARK PAVEMENT
oer [TRANSITION CHANNEL EDGES OVER 0.5m]
: SSL [ienenecorsem
Provermamccrerrnr]/  ERELE TSS) rg) r
[ALONG CARDARH SCUNDARY A | ] FEUSTNG SEVER ACCESS]
[EXISTING GRATED INLET PIT | | ft [RASSRSe oest
cooroyReTuRNep — | |[SL: 111.845 I |
‘SERVICES LEAGUE [ws _ 111.395 I | [Bastine GRave canParane AREA]


[Attachment: image4.png (image text)]
Low Density Residential

 

Il Medium Density Residential 3
IB High Density Residential yO
IM Tourist Accommodation
bn 4
tf q

my District
n 9 > a

*21SP301624)
Guuryy

Neigh

Low Impact Industry

 

Medium Impact Industry
Recreation and Open

Il Environmental Management and Conserva

  

[i Community Facilities
Innovation
arpa)

Rural

IW Rural Residential 50
Paes

  
   

[Gi Community Facilities Label Legend
Log in to download the original file

Delegated Report - Code - Planning OPW21 0188.docx · 3.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.