Application number: nP (k1u t GIC^o
10T
RECEIVE
3 1 MAR 2(
SOHO
Tew2nt:: ,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
Page 3
Application Details - IDAS form I
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise In rms or 'thout all
necessary information and documentation will result in your application of being I oy,,%., cj pplication:
For all development applications, you must:
• complete this form (Application details - IDAS form 1) Z
MAR 2011
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as-be tte)ompany'your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainai5le-.
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Namels (individual or company name in full) Noosa Jetty Builders
For companies, contact name Danny Reed
Postal address PO Box 299 Noosaville
Contact phone number 0408137526
Mobile number (non-mandatory)
Fax number (non-mandatory) 54743480
e-mail address (non-mandatory) [email protected]
1 1. What is the nature of development proposed? (tick all applicable boxes)
J material change of use of premises
® building work
fl operational work
reconfiguring a lot
Page 4
qq
2. What type of approval is being sought?
® development permit
preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
® No
Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
-_----_^-- ^--__ Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g Logan Cairns)
Lot No.
No. No. suburb/locality name code and plan no.
212,2 7 Sunshine coast regional
1 41 Cooran Court 4565 11 N.218.5
council
Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
re ference area ( If app li ca bl e)
Easting Northing Latitude Longitude
GDA94
WGS84
1
other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
608m2
6. Current use/s of the premises (e.g. vacant (and, house, apartment building, cane farm, etc.)
1 house
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Timber jetty and pontoon
Application Defa;ia - IDAS form I
Version 1.0 18 December 2009
Page 5
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
E Puhar
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, co ent to them i of this application.
Signature of owner/s of the land
Date
Table E
Name of owner/s of the land Peter and Brenda Breen
® The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
1 INoosa Sound
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
,,i,-ar.cn L;etarts - IDAS form I
Version 1.0 18 December 2009
Page 6
12. Does the proposal include new building work or operational work on the premises? (including any
services)
E]No Z Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
I
t form 6 over the counter
2 check list
17. Applicant's declaration
By making this application, I declare that all information in this application is true and correct (note: it is
® unlawful to provide false or misleading information).
)plicarujn (details - IDAS form 1
Version 1.0 18 December 2009
Page 7
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
For further information contact QLeave on 1800 803 481 or www Sileay^,Si1S g9y.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To.
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
^Phcation Details - IDAS form I
Version 1.0 18 December 2009
Page 8
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
-^', ^n Details - IDAS form 1
Version 1.0 18 December 2009
Page 9
^o^ye^loont Counter
3 0 MAR 2011
(Sustainable Planning Act 2009 version 1.0 efledve 18 December 2009)
This form must be completed for development applications for prescri d tidal work. rewantln
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications you must:
• complete Application details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
1. What type of approval is sought?
development permit
preliminary approval
2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)
Private use Non-private use Estimated value of completed works ($)
® jetty, pier or wharf
mooring pile
deck or boardwalk
boat ramp or spillway
pontoon
q revetment, sea wall or retaining wall
other - please specify below
3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?
No ® Yes
4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)
No ® Yes - provide details below
1V uovernrnem
Page 10
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
ncr! lu!^,i s- - IDAS form 28
Ver.sinn 1 0 18 December 2009
Page 11
Engineers name/s (John Norden & Associates
Organisation name (if applicable)
Suits 16 Tewantin Plaza
Postal address Poinciana Ave
Tewantin 4565
Contact phone number 54497137
Fax number (non-mandatory)
e-mail address (non-mandatory) [email protected]
RPEQ number (or equivalent if
interstate)
Reference number of all plans to which this certification relates
5. Confirm the following mandatory supporting information accompanies this application
Plans certified by a registered professional engineer of Queensland
Confirmation of Method of
(RPEQ) (or an interstate or international equivalent registered with
lodgement lodgement
the appropriate professional body) showing:
the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land) that ® confirmed over the counter
would abut or adjoin the proposed works
the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs confirmed
and the coastal management district
the slope angles of the beds and banks of the tidal area and the finished
confirmed
levels of the proposed works
Written statements or evidence
a copy of the certificate of title for the land (including tidal land) that
® confirmed
would abut or adjoin the proposed works
details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management q confirmed
Regulation 2003, schedule 4A
confirmed
details of the largest vessel, if any, to be moored at the structure
E] not applicable
evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
® confirmed over the counter
• letters of support from adjoining property owner; or
• plans illustrating a water allocation area.
For applications within a cul-de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:
photos of any constructed neighbouring structures or information about ® confirmed
approved but unconstructed neighbouring structures. [] not applicable
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this form.
ribed tidal work - IDAS form 28
Version 1.0 18 December 2009
Page 12
Page 13
09-03-11;08.25
DevPrC^^n 'r
.ter
19 MAR 20)i • I
DO I ,,,.i''e
11^'c.►ru- s^ coFOn- Cbur^
cf e a r
muunn QS
..ly.r.. ffrV..f^f• ii...r S^pG^ -
3^1 Cbc rr rt r
a ua n Q.r
Nona ►4ec4 s c ^-
a, ^lo c irtr eO o rti
ctr2-d ramp
euP^ 1: 1 ! ALanz 4006e3cck-
rm
ca r7 be-- er C - +a c
r5urlcyL rt +,►-I t ort ,
c r ors
^crL bG o^- 'a"
l Cadreart.
boclrucu . 4 3q ^ri.
no " ^o a>
cbur+'. ok
&er dra $^Z. rt1 0
E3 -6 ►rn .
Page 14
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form I
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment agains a plain scheme
® building work - complete table A E] operational work - co plete table B
Table A
What is the nature of the building work made assessable in the planning scheme
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
® development permit fl preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
® No []Yes - provide details below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 18,500
Page 15
13. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, ® confirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents 0 confirmed over the counter
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works confirmed lectronic
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
;theme - IDAS form 6
Version 1.0 18 December 2009
Used in these records
Development Application part 1 of 2 Idas forms 1 & 28Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.