Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application part 1 of 2 Idas forms 1 & 28 · OPW11/0106

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                    ^o^ye^loont Counter
                                                                                                3 0 MAR 2011
(Sustainable Planning Act 2009 version 1.0 efledve 18 December 2009)


This form must be completed for development applications for prescri            d tidal work.   rewantln

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications you must:
•     complete Application details - IDAS form 1
•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
1. What type of approval is sought?

    development permit
    preliminary approval

2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)


                                                 Private use      Non-private use   Estimated value of completed works ($)

® jetty, pier or wharf
     mooring pile
     deck or boardwalk
     boat ramp or spillway
     pontoon

q    revetment, sea wall or retaining wall
     other - please specify below

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?

      No          ® Yes

4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)

      No          ® Yes - provide details below




                                                                                                      1V uovernrnem

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2 Idas forms 1 & 28.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.