Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix A - Bushfire Hazard Assessment & Management Plan

Attached to the e-mail RAL20/0014 - Response to Council's Information Request - 9A Jirrima Cres, Cooroibah - Email 01 of 02.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                      J000706




BUSHFIRE HAZARD ASSESSMENT AND MANAGEMENT
                  PLAN v1
                       LOT 101 ON SP168341




                                                                                  DRAFT NOT FOR SUBMISSION PURPOSES
          9A JIRRIMA CRESCENT COOROIBAH




                                      FOR
                              MAUD CAZOT
                           DECEMBER 2020




      PO Box 9566 Pacific Paradise QLD 4564 / Email: [email protected]
                                  ABN 60 625 108 625
Log in to download the original file

Appendix A - Bushfire Hazard Assessment & Management Plan.pdf · 14.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 34 pages

Page 2

Bushfire Hazard Assessment & Management Plan v1                                                                NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




DOCUMENT CONTROL
Document:                    Bushfire Hazard Assessment & Management Plan
Client:                      Maud Cazot
Project Number:              J000706

Project:                     Reconfiguration of a Lot (1 into 2)
Site:                        Lot 101 on SP168341
                             9a Jirrima Cres, Cooroibah




                                                                                                                                         DRAFT NOT FOR SUBMISSION PURPOSES
File Ref:                    C:\CLIENTS\CAZOT MAUD - 9A Jirrima Cres, Cooroibah\04
                             REPORTING\BHAMP\Bushfire Hazard Assessment & Management Plan v1 - 9A
                             Jirrima Cres, Cooroibah




  Version       Date                       Distribution                    Author/s                         Approved

  1             14/12/2020                 Cazot Maud                      R. Cairney                       Joshua Lee
                                           Callan Lowrie (Murray           BDes (L’Arch)                    (B. Sc. AES, mEIANZ)
                                           & Associates Pty Ltd)           AssocDegAppSc                    - Director
                                                                           (Biology) DipHort (Arb)
                                                                           AILA




DISCLAIMER
To the extent permitted by law, North Coast Environmental Services (including its employees, partners and consultants) excludes
all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses, and any other
compensation, arising directly or indirectly, from using this publication (in part or whole) and any information or material contained
in it.




© 2020                                                         i

Page 3

Bushfire Hazard Assessment & Management Plan v1                               NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




Contents
1   INTRODUCTION                                                                          4

1.1 BACKGROUND                                                                                4
1.2 STATE PLANNING POLICY BUSHFIRE INTENSITY OVERLAY MAP                                      4
1.3 DEVELOPMENT PROPOSAL                                                                      4

2   SITE DESCRIPTION                                                                      5




                                                                                                   DRAFT NOT FOR SUBMISSION PURPOSES
2.1 GENERAL                                                                          5
2.2 TOPOGRAPHY                                                                       5
2.3 VEGETATION                                                                       6
2.3.1 VEGETATION HAZARD CLASS 22.1 – MELALEUCA OPEN FORESTS ON SEASONALLY INUNDATED
LOWLAND COASTAL SWAMPS                                                               8
2.3.2 VEGETATION HAZARD CLASS 39.2 – LOW TO MODERATE TREE COVER IN BUILT UP AREAS    9
2.3.3 VEGETATION HAZARD CLASS 41.4 – DISCONTINUOUS LOW GRASS OR TREE COVER           9
2.4 VEGETATION EXTERNAL OF THE 150M ASSESSMENT BUFFER                               10

3   HAZARD ASSESSMENT                                                                   11

3.1 HAZARD ASSESSMENT METHODOLOGY                                                             11
3.2 LOCAL HAZARD AREA MAP                                                                     12
3.3 QUANTITATIVE MODELLING                                                                    15

4   BUSHFIRE RISK ASSESSMENT                                                            17

4.1 GENERAL                                                                                   17
4.2 RISK FROM IDENTIFIED HAZARDOUS VEGETATION                                                 18

5   BUSHFIRE IMPACT REDUCTION MEASURES                                                  20

5.1 GENERAL                                                                                20
5.2 ASSET PROTECTION ZONES                                                                 20
5.2.1 GENERAL                                                                              20
5.2.2 STATE PLANNING POLICY – STATE INTEREST GUIDANCE MATERIAL (NATURAL HAZARDS, RISKS AND
RESILIENCE – BUSHFIRE) DECEMBER 2019                                                       20
5.2.3 RADIANT HEAT FLUX SETBACKS                                                           21
5.3 WATER SUPPLY                                                                           21
5.4 FIRE BREAKS AND LOT 1 ACCESS                                                           22
5.5 VEHICULAR ACCESS                                                                       22
5.6 LANDSCAPING AND REGROWTH                                                               22
5.7 GENERAL PROPERTY MAINTENANCE                                                           23

6 AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN
BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS                                            25

6.1 NOOSA PLAN 2020 – NATURAL HAZARDS OVERLAY CODE                                            25
6.2 STATE PLANNING POLICY – NATURAL HAZARDS, RISK AND RESILIENCE                              29

7   CONCLUSIONS                                                                         30

7.1 CERTIFICATION MATTERS                                                                     30

8   REFERENCES                                                                          31




© 2020                                             2

Page 4

Bushfire Hazard Assessment & Management Plan v1        NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



APPENDIX 1 – SITE LAYOUT                                         32




                                                                           DRAFT NOT FOR SUBMISSION PURPOSES




© 2020                                             3

Page 5

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



1     INTRODUCTION

1.1       Background
This Bushfire Hazard Assessment and Management Plan has been prepared to assess and
manage the degree of potential bushfire hazard and associated risk within Lot 101 on SP168341,
located at 9a Jirrima Crescent, Cooroibah (referenced hereafter as ‘the site’). The report was
requested to determine the suitability of a Reconfiguration of a Lot (1 into 2) development
application to be submitted to Noosa Shire Council.

1.2       State Planning Policy Bushfire Intensity Overlay Map
The site is mapped under the State Planning Policy (SPP) (refer to Plate 1) as containing the




                                                                                                       DRAFT NOT FOR SUBMISSION PURPOSES
following Potential Bushfire Intensity areas:
      •    High Potential Bushfire Intensity area within the western extent of the site; and
      •    Potential Impact Buffer throughout most of the site, with the exception of the access
           handle and adjoining area flanking the northern boundary.




                                Plate 1 – SPP Bushfire Intensity Mapping Overlay

1.3       Development Proposal
The applicant is seeking to subdivide the existing allotment into 2 Lots. Lot 1 is to be created in
the west of the site measuring approximately 1.82ha and contains areas of existing bushland
flanking the western boundary. A building envelope measuring approximately 2300m2 has been
proposed flanking the proposed eastern boundary. Driveway access is proposed to Lot 1 via an
access easement through proposed Lot.
Approximately 0.9ha of native bushland is proposed to be retained within Lot 1, corresponding
with the general extent of the intact bushland occurring to the west. The majority of the remaining
vegetation within Lot 1 will be cleared to accommodate the proposed development, access
requirements and bushfire setback requirements.
Lot 2 is located to the east, measuring approximately 2.63ha and contains an existing residence
and associated ancillary buildings.
Both Lots are to gain access from Jirrima Crescent via the existing access handle located to the
north-east. The Plan of Development is included as Appendix 1.




© 2020                                                   4

Page 6

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



2    Site Description

2.1 General
The site exists in an area dominated by rural residential allotments on the western side of Lake
Cooroibah. The site measures approximately 4.46ha and has been historically cleared of
vegetation with the remaining vegetation described as a mix of regrowth wet heath and broad-
leaved paperbark open forest.
An existing dwelling is located within the north-east, gaining access to Jirrima Crescent via an
existing access handle flanking the northern boundary. Areas of maintained gardens exist
surrounding the dwelling which includes native regrowth occurring amongst mowed grassed
areas.




                                                                                                       DRAFT NOT FOR SUBMISSION PURPOSES
Open grassy areas are present over a broad depression within the middle of the site and contain
a mix of regrowth wet heath and broad-leaved paperbark. A defined gully dissects the site from
north to south with adjacent areas corresponding with seasonally inundated floodplain conditions.
A culvert crossing provides access across the gully to the western portion of the site.
Areas of heathland exist flanking the western boundary and extend off site to the west.
Plate 2 details site conditions.




                                   Plate 2 – Site Conditions (Source: Nearmap)

2.2 Topography
The slope of the land is a major determinant of fire behaviour, particularly the slope of the land
under vegetation that contributes to bushfire hazard. Fire burns faster as it travels up slope, via
preheating of unburnt fuels ahead of the fire, increasing the rate of spread and fireline intensity.
Conversely, fires move more slowly as they travel downslope. Fireline intensity (kW/m) is a
function of the rate of spread (QFES 2019).
The site is described as near flat (1º) and exhibits a western to northern aspect. The site reaches
a topographic high of 16m AHD about Jirrima Crescent in the east and a topographic low of 5.5m
AHD about the northern boundary in association with a defined gully line which dissects the site
from north to south and conveys overland flow in a northerly direction.. The central portion of the
site exhibits low topographic conditions with seasonal inundation apparent through the presence
of flora species suited to wetland conditions. Standing water was observed within these areas,




© 2020                                                   5

Page 7

Bushfire Hazard Assessment & Management Plan v1                                       NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



which generally corresponds to areas below 7.5m AHD. Plate 3 depicts topography conditions
within and adjacent to the site.




                                                                                                          DRAFT NOT FOR SUBMISSION PURPOSES
                            Plate 3 – Site Topography (Source: NC Interactive Maps)

2.3 Vegetation
The following vegetation hazard classes (classified in accordance with QFES (2019)) were
identified within the assessment area which includes a 150m buffer surrounding the site:
    •    Vegetation Hazard Class 22.1 – Melaleuca open forests on seasonally inundated
         lowland coastal swamps;
    •    Vegetation Hazard Class 39.2 – Low to moderate tree cover in built-up areas; and
    •    Vegetation Hazard Class 41.4 – Discontinuous low grass or tree cover.
The characteristics of each observed vegetation hazard class are described in the following
sections. Plan No. BF01 – Vegetation Hazard Classes depicts their distribution across the
assessment area.




© 2020                                                  6

Page 8

                                                                                                                                                                                                                                                                                       LEGEND
                                                                                                                                                                                                                                                                                                         THE SITE

                                                                                                                                                                                                                                                                                                         150M BUFFER TO ASSESSMENT AREA


                                                                                                                                                                                                                                                                                                         VHC 22.1
                                                                                                                                                                                                                                                                                                         Vegetation Hazard Class 22.1
                                                                                                                                                                       VHC 22.1                                        VHC 22.1
                                                                                                                                                                                                                                                                                                         Melaleuca open forests on seasonally inundated lowland coastal swamps
                                                                                                                                                                                                                                                                                                         VHC 39.2
                                                                                                                                                                                                                                                                                                         Vegetation Hazard Class 39.2
                                                                                                                                                                                                                                                                                                         Low to moderate tree cover in built-up areas
                                                                                                                                                                                                                                                                                                         VHC 41.4
                                                                                                                                                                                                                                                                                                         Vegetation Hazard Class 41.4
                                                                                                                                                                                                                                                                                                         Discontinuous low grass or tree cover
                                                                                                                                                                                                                                                                                                         UNITS OF VEGETATION REMOVED
                                                                                                                       VHC 41.4                                                                                                                                                                          VEGETATION <50M WIDE HAVE BEEN REMOVED
                      VHC 22.1                                                                                                                                                                                                                                                                           AS PER THE PATCH AND CORRIDOR FILTERING PROCESS
                                                                                                                                                                                                                                                                                                         (Leonard et. al (2017)




                                                                                                     VHC 39.2
VHC 22.1




                                                                                                                                                                                                                                                                                                                                                                                 DRAFT NOT FOR SUBMISSION PURPOSES
                                                                                  VHC 22.1
                                                                                                                                        VHC 41.4



                                             VHC 22.1

           VHC 41.4

                                                                                                                VHC 39.2



                                                                  VHC 39.2



                                                                                       VHC 41.4
                                       VHC 41.4




                                                                                                                                                                                         0        15      30    45       60      75           (A1) 1:1500                 150
                                                                                                                                                                                                                                                                              Metres
                                                                                                                                                                                                                                              (A3) 1:3000




                                                                 PROJECT TITLE:                                            CLIENT:                                                                         TITLE:                                                                                                   JOB:                PLAN:           REV:     NORTH:

                       PO Box 9566 Pacific Paradise, Qld, 4564
                                              P: 07 5450 5984
                                                                 PROPOSED DEVELOPMENT                                      MAUD CAZOT                                                                      VEGETATION HAZARD CLASSES                                                                                J000706             BF01            A
                                         ABN: 60 625 108 625
                                                                 AT 9A JIRRIMA CRESCENT, COOROIBAH                                                 A     PRELIMINARY        28-10-2020       RC   JL
                                                                                                                                                                                                           COPYRIGHT © 2020 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
                                                                                                                                                                                                                                                                                                                    SCALE:              1:3000 @ A3
                                                                                                                                                                                                           MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
                                                                                                                                                   ISSUE DETAILS            DATE             INIT CHK'D

Page 9

Bushfire Hazard Assessment & Management Plan v1                                                  NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




2.3.1    Vegetation Hazard Class 22.1 – Melaleuca open forests on seasonally inundated
         lowland coastal swamps
Vegetation Hazard Class 22.1 (VHC 22.1) exists throughout much of the site and is present as open
forest in the west and scattered regrowth vegetation within adjacent unmanaged areas.
Within the west VHC 22.1 exhibits an average canopy height of approximately 15m with a
percentage crown cover (PCC) of 30-40%. The canopy is dominated by Allocasuarina littoralis
(black she oak) and Melaleuca quinquenervia (broad leaved paperbark) with Eucalyptus racemosa
(scribbly gum) also occurring in lower densities.
The mid-storey contains wallum heathland and open forest species including Banksia integrifolia




                                                                                                                     DRAFT NOT FOR SUBMISSION PURPOSES
(coastal banksia), Banksia robur (swamp banksia), Acacia ulicifolia (prickly moses), Acacia
cincinnata (coil-pod wattle), Hakea actites (wallum hakea) and Persoonia virgata (wallum geebung).
The understory is predominantly comprised of native grasses such as Imperata cylindrica (blady
grass), Cymbopogon refractus (barb wire grass), Gahnia aspera (saw sedge) and Xanthorrhoea
johnsonii (grass tree).
VHC 22.1 occurs as scattered regrowth Melaleuca and Allocasuarina over an unmanaged grassy
understorey in the centre of the site. Due to past clearing the majority of midstorey species have
been removed with the understorey comprised of Cymbopogon refractus (barb wire grass) and
Imperata cylindrica (blady grass). Weeds such as Setaria sphacelata (South African pigeon grass)
occur as the dominant understorey species within wetter areas flanking the gully. No evidence of
recent management of this area was observed. If left unmanaged the scattered regrowth areas are
expected to redevelop into a dense Melaleuca open forest similar to that occurring in the west of the
site. Therefore VHC 22.1 has been assigned to both the scattered regrowth and open forest areas.
VHC 22.1 is attributed a potential surface fuel load of 23.4 t/ha and an overall fuel load of 28.4 t/ha
(QFES 2019) and is assigned a High Potential Bushfire Intensity class on level ground (Leonard et
al., 2017).
Plate 4-5 depicts typical conditions within VHC 22.1.




                      Plate 4 – Characteristic vegetation within VHC 22.2 (scattered regrowth)




© 2020                                                    8

Page 10

Bushfire Hazard Assessment & Management Plan v1                                              NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




                                                                                                                 DRAFT NOT FOR SUBMISSION PURPOSES
                         Plate 5 – Characteristic vegetation within VHC 22.2 (Open Forest)

2.3.2    Vegetation Hazard Class 39.2 – Low to moderate tree cover in built up areas
Vegetation Hazard Class 39.2 (VHC 39.2) occurs adjacent to the existing residence and surrounding
areas of moderate tree cover, typically with a cleared or mown understorey. Common canopy
species include E. racemosa (scribbly gum) and M. quinquenervia (broad leaved paperbark), L.
suaveolens (swamp brushbox), Eucalyptus latisinensis (white mahogany), Angophora leiocarpa
(rusty gum) and Pinus elliottii (slash pine).
In open areas the mid-storey is typically void due to past clearing with A. melanoxylon (blackwood)
and Glochidion ferdinandi (cheese tree) occurring at low densities. The understory is comprised of
a mix of mown grass species.
VHC 39.2 is attributed a potential combined surface fuel load of 5 t/ha and a potential total fuel load
of 8 t/ha (QFES 2019). VHC 39.2 is assigned a Low Potential Bushfire Intensity class on flat ground
(Leonard et al., 2017).
Plate 6 depicts typical conditions within VHC 39.2.




                                 Plate 6 – Characteristic vegetation within VHC 39.2

2.3.3    Vegetation Hazard Class 41.4 – Discontinuous low grass or tree cover
Vegetation Hazard Class 41.4 (VHC 41.4) occurs in the north east of the site and dominates the
lands immediately to the north and east of the site where a low density tree cover is present. This
VHC primarily consists of landscaped gardens and open paddocks with low density native trees and
regularly mown grass areas.
VHC 41.4 is attributed a potential total fuel load of 2 t/ha and a potential combined surface fuel load
of 2 t/ha (QFES, 2019). VHC 41.4 is assigned a Low Potential Bushfire Intensity class on flat ground
(Leonard et al., 2017).
Plate 7 depicts typical conditions within VHC 41.4.


© 2020                                                    9

Page 11

Bushfire Hazard Assessment & Management Plan v1                                          NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




                                                                                                             DRAFT NOT FOR SUBMISSION PURPOSES
                                 Plate 7 – Characteristic vegetation within VHC 41.4


2.4    Vegetation external of the 150m assessment buffer
The site flanks the eastern edge of a local north south aligned vegetated corridor. The corridor links
significant conservation areas surrounding the site including The Great Sandy National Park to the
north and Tewantin National Park and Noosa National Park to the south. Vegetation assemblages
include open forest and heathland communities, in addition to wetland areas flanking watercourses
and Lake Cooroibah to the west.
The site is exposed to a paperbark open forest fire run from the west in association with the
aforementioned vegetated corridor. Open forest fire runs are generally absent to the north, east and
south of the site with the surrounding vegetation, where present, described as scattered trees over
maintained understorey grasses. Risk of grassfire is present from the north, south and east and is
considered a function of grassland management frequency.
Plate 8 depicts the general extent of bushland habitat hence available forest fire zones surrounding
the site.




                              Plate 8 – Available fire runs (Source: Queensland Globe)




© 2020                                                    10

Page 12

Bushfire Hazard Assessment & Management Plan v1                                                                 NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



3         HAZARD ASSESSMENT

3.1       Hazard Assessment Methodology
The Noosa Planning Scheme requires that a site-specific bushfire hazard assessment be prepared
to assess the degree of bushfire hazard on a site captured within a mapped Designated Bushfire
Hazard Area. The SPP Bushfire Prone Area mapping prevails over the Noosa Bushfire Hazard Area
mapping with respect to the currency of the methodology adopted to prepare the mapping.
Accordingly, the site-specific hazard mapping required is to be prepared consistent with the
methodology adopted to prepare the SPP mapping.
The methodology used to prepare the SPP mapping is described in:




                                                                                                                                        DRAFT NOT FOR SUBMISSION PURPOSES
      •    Department of Infrastructure, Local Government and Planning’s Natural Hazards, Risk and
           Resilience –– Bushfire (December 2019) State Planning Policy – state interest guidance
           material; and
      •    Queensland Fire and Emergency Services - (2019) Planning for Bushfire Resilient
           Communities.
Site-specific hazard maps are referred to as Local Hazard Area Maps in the SPP documents. The
preparation of Local Hazard Area Maps has been undertaken for the site in accordance with the
following methodology:
      •    Categorizing the vegetation within the site in accordance with the vegetation hazard classes
           derived from QFES (2019);
      •    Using the patch and corridor filtering process to remove narrow corridors and small patches
           of VHC’s1;
      •    Subdividing the identified vegetation hazard classes into bushfire hazard sub-units based on
           slope differences and vegetation hazard classes. All upslope and across slope vegetation
           units are allocated an underlying slope of 1 degree as per methodology prescribed within
           Queensland Fire and Emergency Services - (2019) Planning for Bushfire Resilient
           Communities. The maximal slope recorded within a 3 x 3 grid comprised of 25m x 25m
           individual grids within the VHC’s is adopted as the effective slope underlying the VHC. A
           conservative approach is adopted where multiple slopes persist within VHC’s;
      •    Assigning SPP Potential Bushfire Intensity classes to the sub-units (refer Table 1);
      •    Application of 150m Potential Impact Buffers to the amended sub-units to derive an overall
           Local Hazard Area Map.
Table 1: Potential Bushfire Intensity classes (Leonard et. al. 2017)




1 The patch and corridor filtering process to remove or downgrade hazard levels of small patches and narrow corridors involves the

following three stages:
      •    Merging small patches of a single Vegetation Hazard Class less than 0.5 ha;
      •    Merging small Vegetation Hazard Class patches between 0.5 and 1 ha with higher or moderate fuel loads (greater than 8
           tonnes/ha); and
      •    Removing narrow corridors of vegetation less than 50m wide through a process of patch erosion and dilation. These small
           patches are merged with surrounding vegetation by allocating a patch to the Vegetation Hazard Class that is most common to
           the patch boundary (Leonard et al., 2017).




 © 2020                                                            11

Page 13

Bushfire Hazard Assessment & Management Plan v1                                       NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



3.2    Local Hazard Area Map
The Vegetation Hazard Class Map; BF01 - Vegetation Hazard Classes has been presented in
Section 2.3
The sub-unit level Local Hazard Area Map is presented as Plan No. BF02 – Sub-Units and identifies
that the assessment area is host to a High Potential Bushfire Intensity area throughout much of the
site, with Low hazard areas existing to the east.
The overall Local Hazard Map is presented as Plan No. BF03 – Local Hazard Map and identifies
that the assessment area is host to a High Potential Bushfire Intensity area in the centre and west
of the site flanked by an associated Potential Impact Buffer. The new dwelling on Lot 2 is to be sited
in the existing High Potential Bushfire Intensity area. Note, post development the proposed building




                                                                                                          DRAFT NOT FOR SUBMISSION PURPOSES
envelope and recommended Asset Protection will constitute low threat conditions by virtue of
necessary clearing hence would be located in a Potential Impact Buffer area. It is also likely
additional vegetation management would be re-established across the centre of the site amongst
the previously cleared areas now host to early phase regrowth hence the extent of the confirmed
High Potential Bushfire Intensity area about the BLE would likely be further eroded.

The Local Hazard Map presented in Plan No. BF03 is to supersede the SPP broadscale mapping
attributed to the site and should be used to guide the formulation of appropriate site-based bushfire
management measures for the proposal.




© 2020                                             12

Page 14

                                                                                                                                                                                                                                                                                     LEGEND
                                                                                                                                                                                                                                                                                          THE SITE

                                                                                                                                                                                                                                                                                          150M BUFFER TO SITE

                                                                                                                                                                                                                                                                                          LOW POTENTIAL BUSHFIRE INTENSITY

                                                                                                                                                                                                                                                                                          HIGH POTENTIAL BUSHFIRE INTENSITY


                                                                                                                                     SUB
                                        SUB                                                                                         UNIT 3
                                       UNIT 1




     SUB
    UNIT 1                                                                                 SUB
                                                                                          UNIT 1




                                                                                                                                                                                                                                                                                                                                       DRAFT NOT FOR SUBMISSION PURPOSES
                                                                                                                  SUB
                                                                                                                 UNIT 2



                              SUB                                                                                                                                                  SUB UNIT HAZARD ASSESSMENT
                             UNIT 3




0   15   30   45   60   75   (A1) 1:1500          150
                                                    Metres
                             (A3) 1:3000




                                                                                 PROJECT TITLE:                           CLIENT:                                                          TITLE:                                                                                         JOB:           PLAN:     REV:       NORTH:

                                       PO Box 9566 Pacific Paradise, Qld, 4564
                                                              P: 07 5450 5984
                                                                                 PROPOSED DEVELOPMENT                     MAUD CAZOT                                                       SUB-UNIT LOCAL HAZARD MAP                                                                      J000706       BF02           A
                                                         ABN: 60 625 108 625
                                                                                 AT 9A JIRRIMA CRESCENT, COOROIBAH                           A     PRELIMINARY   28-10-2020   RC   JL
                                                                                                                                                                                           COPYRIGHT © 2020 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
                                                                                                                                                                                                                                                                                          SCALE:         1:3000 @ A3
                                                                                                                                                                                           MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
                                                                                                                                             ISSUE DETAILS       DATE         INIT CHK'D

Page 15

                                                                                                                                                                                                                                                                              LEGEND
                                                                                                                                                                                                                                                                                        THE SITE

                                                                                                                                                                                                                                                                                        150M BUFFER TO SITE

                                                                                                                                                                                                                                                                                        LOW POTENTIAL BUSHFIRE INTENSITY


                                                                                                                                                                                                                                                                                        HIGH POTENTIAL BUSHFIRE INTENSITY

                                                                                                                                                                                                                                                                                        POTENTIAL IMPACT BUFFER




                                                                                                                                                                                                                                                                                                                                     DRAFT NOT FOR SUBMISSION PURPOSES
0   15   30   45   60   75   (A1) 1:1500          150
                                                    Metres
                             (A3) 1:3000




                                                                                 PROJECT TITLE:                      CLIENT:                                                    TITLE:                                                                                           JOB:               PLAN:         REV:      NORTH:

                                       PO Box 9566 Pacific Paradise, Qld, 4564
                                                              P: 07 5450 5984
                                                                                 PROPOSED DEVELOPMENT                MAUD CAZOT                                                 LOCAL HAZARD MAP                                                                                 J000706            BF03          A
                                                         ABN: 60 625 108 625
                                                                                 AT 9A JIRRIMA CRESCENT, COOROIBAH                A     PRELIMINARY   28-10-2020   RC   JL
                                                                                                                                                                                COPYRIGHT © 2020 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
                                                                                                                                                                                                                                                                                 SCALE:             1:3000 @ A1
                                                                                                                                                                                MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
                                                                                                                                  ISSUE DETAILS       DATE         INIT CHK'D

Page 16

Bushfire Hazard Assessment & Management Plan v1                                 NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




3.3 Quantitative Modelling
Quantitative modelling of the potential bushfire conditions that may be experienced within the
VHC 22.1 Melaleuca open forest within the site has been undertaken to gain an appreciation
of the severity of risk acting on the site including exposure to direct flame contact and radiant
heat. An understanding of the latter is used to determine the dimensioning of asset protection
zones to satisfy the SPP requirements.
The models used comprise industry standard bushfire equations which have been built into
the FPAA endorsed FLAMESOL computer model. FLAMESOL allows numerous input
variables to be adjusted including fuel loads, fire danger index, site slope and distance to
vegetation. FLAMESOL uses the following algorithms:




                                                                                                    DRAFT NOT FOR SUBMISSION PURPOSES
    •    Rate of Spread – McArthur (1973) and Nobel et al. (1980)
    •    Flame Length – NSW Rural Fire Service (2001) and Nobel et al. (1980)
    •    Elevation of Receiver – Douglas and Tan (2005)
    •    Flame Angle – Douglas and Tan (2005)
    •    Radian Heat Flux – Drysdale (1999), Sullivan et al. (2003) and Douglas and Tan (2005)
The FLAMESOL Minimum Distance calculator has been used and comprises an AS
3959:2018 Method 2 (Appendix B) based calculator which populates standard bushfire
behaviour variables as well as the minimum distances required to achieve a range of different
radiant heat level exposures, including those which correspond with the range of Bushfire
Attack Levels (BAL’s) prescribed under AS 3959:2018 Construction of Buildings in Bushfire
Prone Areas.
Fuel load inputs have been drawn from Planning for Bushfire Resilient Communities (QFES
2019) based on the calculated potential fuel loads for VHC 22.1 (23.4 t/ha surface and near
surface fuels and 28.4 t/ha total fuels). 1º effective slope was adopted for the slope underlying
the VHC 22.1 Melaleuca Open Forest.
A FDI of 47 has been adopted for the site consistent with the assignment by QFES (Catalyst
2020) (refer Plate 9).




© 2020                                             15

Page 17

Bushfire Hazard Assessment & Management Plan v1                                         NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




                                                                                              SITE




                                                                                                            DRAFT NOT FOR SUBMISSION PURPOSES
                                   Plate 9 – FFDI (Source: QFES Redi Map)

The Flamesol output result is shown in Plate 10.




         Plate 10 – Flamesol output for VHC 22.1 (Melaleuca open forest on seasonally inundated lowland
                                             coastal swamps) - 1º




© 2020                                                  16

Page 18

Bushfire Hazard Assessment & Management Plan v1                                         NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



4     BUSHFIRE RISK ASSESSMENT

4.1       General
A bushfire risk assessment for the proposed building areas has been prepared generally in
accordance with State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, 2016) and AS/NZS ISO 31000:2018 – Risk Management Methodology.
The bushfire risk assessment details the likelihood that the proposed development will be
exposed to bushfire ember, radiant heat and/or flame attack considering the proximity to
bushfire prone vegetation and likely bushfire behaviour. Plate 11 illustrates the main bushfire
attack mechanisms acting on buildings.




                                                                                                            DRAFT NOT FOR SUBMISSION PURPOSES
              Plate 11 – Bushfire attack mechanisms (Planning for Bush Fire Protection, 2006)

According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or
a situation with a potential to cause loss, whereas a ‘risk’ is the chance of something
happening that will have an impact on objectives measured in terms of consequences and
likelihood. The State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, April 2016) refers to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’
which are defined below.
      •    Acceptable risk
              o     A risk that, following an understanding of the likelihood and consequences, is
                    sufficiently low to require no new treatments or actions to reduce risk further.
                    Individuals and society can live with this risk without feeling the necessity to
                    reduce the risks any further.
      •    Tolerable risk
              o     A risk that, following an understanding of the likelihood and consequences, is
                    low enough to allow the exposure to continue, and at the same time high
                    enough to require new treatments or actions to reduce risk. Society can live
                    with this risk but believe that as much as is reasonably practical should be done
                    to reduce the risks further.
      •    Intolerable risk
              o     A risk that, following an understanding of the likelihood and consequences, is
                    so high that it requires actions to avoid or reduce the risk. Individuals and



© 2020                                                  17

Page 19

Bushfire Hazard Assessment & Management Plan v1                                                NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



                  society will not accept this risk and measures are to be put in place to reduce
                  risks to at least a tolerable level.
AS/NZS ISO 31000:2018 defines ‘Likelihood’ as the chance that something might happen.
Likelihood can be defined, determined, or measured objectively or subjectively and can be
expressed either qualitatively or quantitatively (using mathematics ). The following ‘likelihood’
categories for the probability of the assessed bushfire attack mechanisms impacting the
assessment area have been adopted within this assessment:
      •    Likely - Will probably occur
      •    Unlikely - Could occur but doubtful




                                                                                                                      DRAFT NOT FOR SUBMISSION PURPOSES
4.2       Risk from Identified Hazardous Vegetation
The proposed Lot 1 building envelope has been allocated a 14m cleared asset protection zone
to the VHC 22.1 occurring within the site.
The bushfire risk acting on the proposed building envelope, in the absence of additional
mitigation measures being implemented, is detailed in Table 2. The degree of separation
offered to the adjoining vegetation is the primary driver of the assigned level of risk.
                                     Table 2 - Risk Assessment (Lot 1)
 Direction & Slope                 North 1º              South 1º              East 1º              West 1º

 Distance to
                                        14m                   14m                14m                  14m
 hazardous vegetation

 VHC’s                                  22.1                  22.1               22.1                 22.1

 Attack Mechanism

 Smoke*                        Not assessed          Not assessed          Not assessed        Not assessed

 Ember                         Likely -              Likely -              Likely -            Likely -
                               Intolerable           Intolerable           Intolerable         Intolerable

 Radiant Heat**                Likely                Likely                Likely              Likely
                               Intolerable           Intolerable           Intolerable         Intolerable
                               >1kW/m**              >1kW/m**              >1kW/m**            >1kW/m**


 Flame***                      Likely -              Likely -              Likely -            Likely -
                               Intolerable           Intolerable           Intolerable         Intolerable




* Risk of smoke impact has not been assessed. Smoke can travel long distances and exhibit a variety of densities
and composition. It is therefore not readily practicable to determine the separation distances needed to attain the
various risk classes. Furthermore, individuals will react differently to smoke impacts whereas individuals will
generally exhibit similar reactions to direct flame and radiant heat.
**<1kW/m² radiant heat exposure is considered the upper limit of tolerable indefinite radiant heat exposure to
humans (QFES 2019).
*** Assets located within 1.5 x the modelled flame length from the Flamesol output are assigned an Intolerable
Risk.
Assets located within >1.5 - <3 x the modelled flame length from the Flamesol output are assigned a Tolerable
Risk.
Assets located >3 x the modelled flame length from the Flamesol output are assigned an Acceptable Risk.

Table 2 identifies that the building envelope located within Lot 1 is exposed to a Likely
Intolerable risk of ember, radiant heat, and direct flame impact in the absence of additional
mitigation measures being implemented. Post development it is anticipated that the risk will
be reduced to at least a tolerable risk via implementation of the bushfire planning mitigation



© 2020                                                        18

Page 20

Bushfire Hazard Assessment & Management Plan v1                                 NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



measures prescribed in this report. A primary measure used to reduce the risk will comprise
compliance with the National Construction Code and AS3959 construction requirements for
dwellings located in bushfire prone areas. The dwelling will need to be built to the necessary
bushfire construction standard in order the withstand the AS3959 assessed level of flame
contact and radiant heat derived from the adjacent forest edge. This measure coupled with
maintenance of the necessary cleared setback to ensure the BAL construction standard
remains effective/valid is considered sufficient to reduce the assessed level of risk to at least
a tolerable to acceptable level thereby satisfying the QLD SPP State Interest Policy 2, that
developments in Bushfire Prone Areas are to be designed to achieve an Acceptable to
Tolerable level of risk, which is based on a risk assessment performed consistent with AS/NZS
ISO 31000:2018 Risk Management – Principles and Guidelines..




                                                                                                    DRAFT NOT FOR SUBMISSION PURPOSES




© 2020                                             19

Page 21

Bushfire Hazard Assessment & Management Plan v1                                NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



5    BUSHFIRE IMPACT REDUCTION MEASURES

5.1 General
The following section describes bushfire impact reduction measures to be incorporated into
the proposed development to reduce the risk of bushfire impacts to people and property.
Implementation of the identified measures is not implied nor intended to advocate that building
occupants remain on the site during a bushfire event, nor that people and property will be
protected from bushfire impacts. The measures are intended to reduce the potential severity
of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation
measures have been derived from:
    •    Department of State Development, Manufacturing, Infrastructure and Planning’s State




                                                                                                   DRAFT NOT FOR SUBMISSION PURPOSES
         Planning Policy – State interest guidance material – Natural hazards, risk and
         resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019);
         and
    •    Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient
         Communities.

5.2 Asset Protection Zones
5.2.1    General
Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential
bushfire impact to people and property situated in bushfire prone areas. For illustrative
purposes, Plate 12 depicts the concept of an APZ surrounding a dwelling in a bushfire prone
areas.




                                       Plate 12 – Asset Protection Zones

The development has been confirmed to be located within a bushfire hazard area hence
provision of adequate separation between the proposed Lot 1 building envelope and
surrounding hazardous vegetation is required to provide a reasonable level of safety to site
occupants and emergency services staff. The dimensioning requirements for APZ’s is set in
the State Planning Policy – State Interest Guidance Material (Natural Hazards, Risks and
Resilience – Bushfire) December 2019.

5.2.2    State Planning Policy – State Interest Guidance Material (Natural Hazards, Risks
         and Resilience – Bushfire) December 2019
Assessment Benchmark 4 of the State Planning Policy – state interest guidance material
states:
Development supports, and does not hinder, disaster management response or recovery
capacity or capabilities. Where reconfiguring a Lot creating Lots of greater than 2000 square
metres:
To ensure emergency access and operational space for firefighters, include a development
footprint plan that is separated from the closest edge to the adjacent medium, high or very



© 2020                                                    20

Page 22

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



high potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29
kilowatt per square metre or less .
Compliance with Assessment Benchmark 4 can be attained where the proposed Lot 1 building
envelope is sufficiently separated from the nearby forest hazard so that a radiant heat flux
level at any point on the building envelope does not exceed 29 kW/m². In this instance the
plan of development identifies a building envelope for Lot 1. The setbacks required to satisfy
Assessment Benchmark 4 are defined in Section 5.2.3.
5.2.3     Radiant Heat Flux Setbacks
Determination of the setbacks required to satisfy Assessment Benchmark 4 can be identified
from the quantitative modelling output presented in Section 3.3 herein. The output results from




                                                                                                       DRAFT NOT FOR SUBMISSION PURPOSES
Plate 10 can be used to identify the setback requirements to achieve the <29 kW/m² radiant
heat flux SPP requirement. The required setbacks are shown in Table 4.
          Table 4 – Radiant Heat Flux Minimum Setbacks to secure <29kW/m² (Lot 1 BLE)
           VHC                          Direction and slope (º)         <29 kW/m² Setback* (m)

            22.1                                   North (1°)                       14

            22.1                                   East (1°)                        14

            22.1                                   South (1°)                       14

            22.1                                   West (1°)                        14

* Source – Flamesol Minimum Distance calculator

Table 4 identifies a minimum setback of 14m is required to expose the Lot 1 BLE flanking
hazardous VHC 22.1 vegetation to <29 kW/m² radiant heat. It is therefore recommended
minimum APZ’s of 14m depth be provided between the limit of the Lot 1 BLE and flanking
hazardous VHC 22.1 vegetation and that the setbacks be wholly provided within Lot 1 and be
maintained for the life of the development.
The plan of development identifies the recommended 14m setback hence satisfies
Assessment Benchmark 4.
All APZ’s should be maintained as described in Section 5.6 herein.

5.3 Water Supply
The availability of a reliable water supply for firefighting purposes is a vital tool in the defence
of bushfire impact. The site is not connected to a reticulated water supply. For the purposes
of incorporating the most up to date QFES water supply recommendations, it is recommended
the development adopts the relevant provisions stated in Assessment Benchmark 4 of the
SPP December 2019 guidance material and subsequently Section 9.1 in the QFES Bushfire
Resilient Communities document. In this regard, Assessment Benchmark 4 requires:
To ensure emergency services can respond effectively, development is located within a
reticulated water supply area or includes a dedicated static water supply that is available solely
for fire-fighting purposes and can be accessed by fire-fighting vehicles15.
Footnote 15 states: Information regarding appropriate static water supply can be found in the
Bushfire Resilient Communities document.
Section 9.1 in Bushfire Resilient Communities requires a static water supply as follows:
         Where reticulated water supply is not available, development provides a water tank that
         is available solely for fire-fighting purposes and can be accessed by fire-fighting
         appliances. A water tank is to be provided within 10 metres of each building (other than
         a class 10 building) which:
         a) is either below ground level or of non-flammable construction
         b) has a take-off connection at a level that allows the following dedicated, static water



© 2020                                                          21

Page 23

Bushfire Hazard Assessment & Management Plan v1                                          NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



         supply to be left available for access by fire fighters:
            i. 10,000 litres for residential buildings.
            ii. for industrial, commercial and other buildings, a volume specified in AS 2304–2011
            Water storage tanks for fire protection. (SPP Bushfire 2019).

5.4 Fire Breaks and Lot 1 Access
The plan of development provides access to proposed Lot 1 via an access easement to the
east which dissects Lot 2. To ensure safe egress to Lot 1 it is required that the future access
driveway be located within a 20m wide easement and constructed to the specifications of a
fire trail, to comply with the SPP Assessment Benchmark 4 Table 4 – Fire trail and working




                                                                                                             DRAFT NOT FOR SUBMISSION PURPOSES
area design parameters specifications (refer Plate 13). The total modified width must be 20m
width within the High Potential Bushfire Buffer area and the Potential Impact Buffer as depicted
in Local Hazard Map BF03.
The entirety of the access easement must therefore be maintained in low threat conditions by
the future Lot 1 property owner.




                      Plate 13 – Assessment Benchmark 4 fire break trail specification

5.5 Vehicular Access
Development in bushfire prone areas should be serviced by safe access/exit points for both
occupants and emergency services personnel. As stated in Section 5.4, access to Lot 1 must
be maintained in a 20m wide easement constructed to SPP fire trail and working area design
parameters. This easement will be in favour of Lot 1 and therefore the maintenance of low
threat conditions undertaken by the Lot 1 property owner.
To meet current day benchmark standards, it is recommended the Lot 1 driveway is designed
and installed in accordance with Vehicle Access Guidelines for residential, commercial and
industrial Lots, Queensland Fire and Emergency Services, 2015, unless otherwise specified
by the relevant water entity. A 3.5m wide formed driveway that can support a 15 tonne fire
truck would therefore be necessary.

5.6 Landscaping and Regrowth
Existing and future landscaping within the site should avoid increasing the potential for
bushfire hazard. Assessment Benchmark 5 of the SPP Bushfire 2019 seeks that the site layout
places the landscape and open spaces within the site between premises and adjacent mapped
medium, high or very high potential bushfire intensity areas. This landscaping and open space
comprises protective landscape treatments that:



© 2020                                                    22

Page 24

Bushfire Hazard Assessment & Management Plan v1                                  NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



1. Comprise only low threat vegetation (for example grassland managed in a minimal fuel
condition, maintained lawns, golf courses and cultivated gardens); or
2. Are designed to ensure a potential available fuel load is maintained at less than 8
tonnes/hectare in aggregate and with a fuel structure that remains discontinuous.
To reduce the potential for bushfire impact to buildings, structures and occupants as a result
of future regrowth and landscaping works within the site, it is recommended:
    •    Any landscaping within the nominated APZ’s satisfies Assessment Benchmark 5 of the
         SPP Bushfire 2019, including the low threat vegetation criteria prescribed in section
         2.2.3.2 of AS 3959:2018 or later iterations thereof;
    •    No woody mulch is used within 2m of buildings;




                                                                                                     DRAFT NOT FOR SUBMISSION PURPOSES
    •    The groundcover is maintained as short cropped grass to a nominal height of 100mm,
         or dirt or gravel.
    •    Discrete plantings of low flammability groundcovers and shrubs is permissible at a
         distance >10m from the dwelling;
    •    No trees are retained within 10m of the buildings;
    •    Beyond 10m, any trees desired to be retained are to be continuously defoliated below
         < 4m height above ground level and no limbs are to extend to within 3m of the roof line
         of the buildings. All pruning should be undertaken in accordance with AS 4373 Pruning
         of amenity trees;
    •    Future landscaping works/plantings maximise the use of locally indigenous, low
         flammability species and or low-density plantings of suitable open forest /woodland
         species with low bark shedding characteristics. Landholders should consult their local
         native plant nursery for suitable species selection.
The APZ within Lot 1 is to be maintained by the respective individual landholder/s and or
occupants and are to consist of low threat understorey vegetation conditions (e.g. mown
grass) in perpetuity.

5.7 General Property Maintenance
The undertaking of an appropriate level of property maintenance throughout the year, and in
particular prior to the fire season, can significantly reduce the severity of fire impact upon a
site. Queensland Fire and Emergency Services recommend the following general actions be
undertaken to prepare for the fire season:
Structure
    •    Clear leaves, twigs, bark and other debris from the roof and gutters.
    •    Purchase and test the effectiveness of gutter plugs.
    •    Enclose open areas under decks and floors.
    •    Install fine steel wire mesh screens on all windows, doors, vents and weep holes.
    •    Point LPG cylinder relief valves away from the house.
    •    Conduct maintenance checks on pumps, generators and water systems.
    •    Seal all gaps in external roof and wall cladding.
Access
    •    Display a prominent house or Lot number, in case it is required in an emergency.
    •    Ensure there is adequate access to your property for fire trucks - 4 metres wide by 4
         metres high, with a turn-around area.
Vegetation
    •    Reduce vegetation loads along the access path.



© 2020                                             23

Page 25

Bushfire Hazard Assessment & Management Plan v1                            NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



    •    Mow your grass regularly.
    •    Remove excess ground fuels and combustible material (long dry grass, dead leaves
         and branches).
    •    Trim low-lying branches two metres from the ground surrounding your home.
Note the above recommendations are that of QFES and are offered herein for advisory
purposes. They have not been set as recommendations for certification purposes.




                                                                                               DRAFT NOT FOR SUBMISSION PURPOSES




© 2020                                             24

Page 26

Bushfire Hazard Assessment & Management Plan v1                                 NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



6     AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN
      BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS

The site is mapped within the Natural Hazards Overlay in the Noosa Plan 2020 (refer to Plate
13)




                                                                                                    DRAFT NOT FOR SUBMISSION PURPOSES
                                Plate 13 – Noosa Natural Hazards Overlay map

Building works within Designated Bushfire Prone Areas identified on a Bushfire Hazard
Overlay Map prepared under a power of legislation triggers building design assessment under
AS 3959:2018. The Standard provides minimum construction requirements for new habitable
dwellings and habitable building alterations in designated Bushfire Prone Areas. The
construction requirements are intended to improve the performance of buildings subjected to
burning debris, radiant heat or flame contact. Building works in Designated Bushfire Prone
Areas must be built to the Bushfire Attack Level (BAL) construction standard relevant to the
building site as identified by the AS 3959:2018 methodology.
A specific BAL assessment will be required once building plans have been progressed given
the BAL relies on an accurate understanding of the final footprint of the building within the BLE
and is required to be assessed against the active iteration of the Standard at the time of
assessment.
Based on the Plan of Development and the proposed setbacks to hazardous vegetation of
14m, it is anticipated that the future dwelling on Lot 1 will be exposed to a maximum BAL 29
Construction Standard.
LEGISLATION AND OVERLAYS
6.1      Noosa Plan 2020 – Natural Hazards Overlay Code
The proposed development is considered assessable development and therefore is
assessable against Table 13.9 Bushfire Hazard Area of Council’s Natural Hazards Overlay
Code which has been reproduced as Table 5.




© 2020                                                  25

Page 27

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                               NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




Table 5 – Table 8.2.3.3 Bushfire Hazard Area Code –Noosa Plan 2020


 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                                       PROPOSED SOLUTION

Safety of people and property
PO1                                                             AO1.1                                                                      A01.1 This Bushfire Hazard Assessment and Management Plan has been
Development maintains the safety of people and                  Development which will materially increase the number of people living prepared to maintain the safety of people and property from the adverse impacts
property from the adverse impacts of bushfire.                  or congregating on premises, including reconfiguring a Lot, is not located of bushfire. Post development, the proposed Lot 1 BLE will be located within a
                                                                within a medium or high bushfire hazard area.                              Potential Impact Buffer .




                                                                                                                                                                                                                                  DRAFT NOT FOR SUBMISSION PURPOSES
                                                                AO1.2
                                                                                                                                      A01.2 The proposed Lot 1 BLE has been setback a minimum of 14m from all
                                                                Development maximises setbacks from hazardous vegetation to achieve
                                                                                                                                      hazardous vegetation areas. With the implementation of the recommendations of
                                                                an acceptable risk.
                                                                                                                                      this report it is anticipated that the risk to the Lot 1 building envelope will be
                                                                                                                                      reduced to no greater than a tolerable risk thereby satisfying the SPP State Interest
                                                                Editor’s Note — PSP8 Natural Hazards provides guidance for assessing
                                                                                                                                      Policy No 2.
                                                                bushfire hazard risk and preparing a bushfire hazard management plan.

Impacts on Ecologically Important Areas
PO2                                                                                                                                        PO2
Bushfire mitigation measures do not adversely impact            No acceptable outcome provided                                             1. Bushfire mitigation measures are not expected to affect the biodiversity values
on:                                                                                                                                        currently existing within the site. A small amount of regrowth vegetation will be
                                                                                                                                           required for removal to develop the BLE and APZ requirements. This is not
           1. biodiversity values, connectivity and                                                                                        expected to affect the long term physical integrity and function of the local
              ecosystem functioning; and                                                                                                   regional ecosystem.
           2. the long term physical integrity of                                                                                          2. Bushfire mitigation measures are not expected to affect the long term physical
              waterways, wetland and areas of                                                                                              integrity of waterways, wetlands and areas of native vegetation.
              native vegetation.
Water Supply for Fire Fighting Purposes
PO3                                                    AO3.1                                                                    A03.2 – The site will not be connected to a reticulated water supply. Water
Development provides an adequate water supply for fire Premises are connected to the reticulated water supply.                  supply recommendations have been set herein consistent with SPP Assessment
fighting purpose which is reliable, safely located and                                                                          Benchmark water supply requirements.
freely accessible.                                     Editor's note—For reconfiguring a Lot, water supply needs to provide for
                                                       a minimum flow and pressure of 10 litres a second at 200kPa at all times
                                                       for fire fighting purposes.

                                                                OR

                                                                AO3.2
                                                                Where there is no available reticulated water supply, the premises has:

                                                                        1. an accessible dam, swimming pool or water tank available
                                                                           for fire fighting purposes with an onsite water volume of not
                                                                           less than 5,000 litres; and
                                                                        2. a water supply outlet pipe 50 millimetres in diameter fitted
                                                                           with a standard fire brigade fitting connected to the water
                                                                           supply (other than where the water supply is in a swimming
                                                                           pool or dam).

                                                                Editor’s Note—Water supply capacity for fire fighting purposes is in
                                                                addition to water supply capacity for other uses and activities on the
                                                                premises.




© 2020                                                                                                           26

Page 28

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                        NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                                          PROPOSED SOLUTION
Essential Community Infrastructure
PO4                                                         AO4.1                                                                        PO4 - The proposed development does not involve essential community
Essential community infrastructure is able to function      Development involving essential community infrastructure is not located      infrastructure.
effectively during and immediately after bushfire events.   within a medium or high bushfire hazard area.

                                                            OR




                                                                                                                                                                                                                           DRAFT NOT FOR SUBMISSION PURPOSES
                                                            AO4.2
                                                            Where located in a medium or high bushfire hazard area, development
                                                            involving essential community infrastructure is designed to function
                                                            effectively during and after a bushfire event in accordance with a
                                                            Bushfire Hazard Management Plan.

                                                            Editor’s Note— PSP8 Natural Hazards provides guidance for assessing
                                                            bushfire hazard risk and preparing a bushfire hazard management plan.
Hazardous Materials
PO5                                                         AO5                                                                      PO5 - The proposed development does not involve the manufacture or storage
Public safety and the environment are not adversely         Hazardous materials are not manufactured or stored in bulk in a bushfire of hazardous materials in bulk.
affected by the impacts of bushfire on hazardous            hazard area.
materials manufacturing or storing in bulk.
Access and Evacuation Routes
PO6                                                     AO6.1                                                                            PO6 - N/A – No new roads are proposed.
Roads provide for easy and safe evacuation of residents The road layout provides for through-roads and avoids cul-de-sacs and
of premises and access by emergency services.           dead-end roads.

                                                            OR

                                                            AO6.2
                                                            The development has a perimeter road reserve with a minimum width of
                                                            20 metres and maximum gradient of 12.5%.

                                                            OR

                                                            AO6.3
                                                            Cul-de-sacs or no-through roads are provided with fire trails
                                                            or access easements, which are capable of being navigated by
                                                            conventional vehicles and which link to through roads.

                                                            AO6.4
                                                            Safe access and egress is available at all times to all of the development
                                                            for emergency vehicles and personnel.

                                                            AO6.5
                                                            Where an emergency access point is required, it complies with the
                                                            relevant works codes and PSP6 Engineering Design Standards.
 Lot design
PO7                                                      AO7                                                                             A07
Lot design and building siting minimises bushfire hazard Each residential Lot:
risk to people and property.




© 2020                                                                                                       27

Page 29

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                        NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                                      PROPOSED SOLUTION
                                                                    1. includes a building envelope, identified on a plan of         1. The plan of development depicts the location of the new building envelope
                                                                       subdivision;                                                  proposed for Lot 1.

                                                                    2. is of sufficient size and shape to allow for efficient        2. The proposed BLE is of sufficient size and shape to allow for efficient
                                                                       emergency access to buildings for fire fighting appliances    emergency access. It is proposed that a fire trail of 20m width be established
                                                                       (e.g. by avoiding battle-axe/hatchet Lots and long narrow     covering the Lot 1 access driveway and be constructed to the Vehicle Access
                                                                       Lots with long access driveways to buildings);                Guidelines for residential, commercial and industrial Lots, Queensland Fire and
                                                                                                                                     Emergency Services, 2015, therefore allowing emergency access and exit for




                                                                                                                                                                                                                           DRAFT NOT FOR SUBMISSION PURPOSES
                                                                                                                                     firefighting purposes.

                                                                    3. where more than 2500m², achieves setbacks from                3. The Lot 1 BLE has been setback 14m from areas of hazardous vegetation
                                                                       hazardous vegetation in line with Bushfire Attack Level 29    through the inclusion of a 14m wide APZ. This setback will expose the future
                                                                       requirements as per AS3959; and                               dwelling to a maximum BAL 29 under AS3959; and

                                                                                                                                     4. The Lot 1 BLE has been sighted to the east of the intact bushland areas to be
                                                                    4. is designed so that buildings and structures are sited in
                                                                                                                                     retained within the lowest hazard area within the Lot.
                                                                       locations of lowest hazard within the Lot and elements of the
                                                                       development least susceptible to fire are closest to the fire
                                                                       hazard.
Firebreaks and fire access tracks
PO8                                                         AO8.1                                                                     A08.1 – No new roads are proposed.
Firebreaks and fire access tracks provide:                  Where development involves the creation of a new road and Lots,
                                                            a firebreak is provided by providing a cleared road reserve not less than
           1. adequate access for fire fighting and other   20 metres wide and maximum gradient of 12.5% around the perimeter of
              emergency vehicles; and                       the subdivision, between the created Lots and surrounding vegetated
           2. adequate access for the evacuation of         lands.
              residents and emergency personnel in an
              emergency situation.                          OR

                                                            AO8.2                                                                    A08.2 – A fire access track to SPP Bushfire 2019 standards is to be provided to
                                                            Fire access tracks are provided between the created Lots and             the dwelling on proposed Lot 1 and its associated asset protection zone thereby
                                                            surrounding vegetated land that:                                         offering ready access to the vegetation hazard surrounding the Lot 1 building.

                                                                    1.   have a cleared minimum width of 6 metres;
                                                                    2.   have a maximum gradient of 12.5%;
                                                                    3.   provide unbroken access for fire fighting vehicles;
                                                                    4.   provide passing bays and turning areas;
                                                                    5.   are located within an access easement that is granted in
                                                                         favour of Noosa Council and the Queensland Fire and
                                                                         Rescue Service.

                                                            AO8.3
                                                            Bushfire management measures are carried out on the subject property     A08.3 – All prescribed bushfire management measures herein can be applied
                                                            and not any adjoining property.                                          within Lot 1 and do not rely on Lot 2 or adjoining properties.




© 2020                                                                                                      28

Page 30

Bushfire Hazard Assessment & Management Plan v1                                       NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




6.2 State Planning Policy – Natural Hazards, Risk and Resilience
The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning
Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December
2019) contains the development assessment benchmarks for natural hazards, risk and resilience -
bushfire. The SPP assessment benchmarks prevail over those prescribed in the Noosa Plan Natural
Hazards Overlay Code where they involve the same design elements. An assessment of the
proposed development’s compliance with each of the assessment benchmarks has been provided
below.
Assessment Benchmark 4
Where reconfiguring a Lot creating Lots of greater than 2000 square metres




                                                                                                          DRAFT NOT FOR SUBMISSION PURPOSES
To ensure emergency access and operational space for firefighters, include a development footprint
plan that is separated from the closest edge of the adjacent mapped medium, high or very high
potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt
per square metre or less. To facilitate safe evacuation during a bushfire event, include a development
footprint plan that is located within 60 metres of the street frontage and sited to enable a route
between the development footprint plan and the street frontage with a gradient that does not exceed
of 12.5 per cent.
The Lot 1 building envelope has been allocated a 14m wide asset protection zone to the surrounding
VHC 22.1 hazard which is sufficient to achieve <29 kW/m² radiant heat flux acting on the building.
Safe evacuation is to be granted to Lot 1 through the provision of a 20m wide fuel modified fire trail
(inclusive of the driveway) contained within the Lot 1 easement and therefore satisfies the
Assessment Benchmark 4 criteria.
Assessment Benchmark 5
Where reconfiguring a Lot:
Subdivision design avoids locating Lots (or for Lots greater than 2000 square metres, avoids locating
the development footprint plan) that are within bushfire prone areas and on ridgelines, saddles and
crests where slopes exceed 15 per cent.
The development is positioned on a flat coastal plain and therefore complies with Assessment
benchmark 5.
Assessment Benchmark 7
Where a requirement for an asset protection zone (or similar) exists:
Landscaping treatments comprise only low threat vegetation, including grassland managed in a
minimal fuel condition, maintained lawns, golf courses, maintained public reserves and parklands,
vineyards, orchards, cultivated gardens, commercial nurseries, nature strips and windbreaks.
OR
Landscaping management maintains a potential available fuel load which is less than eight
tonnes/hectare in aggregate, and fuel structure which is discontinuous.
OR
Development includes a bushfire management plan for the maintenance of any identified asset
protection zone, including landscape design and ongoing vegetation management.
This Bushfire Management Plan has prescribed management measures for the APZ’s recommended
for proposed Lot 1 which complies with Assessment Benchmark 7.




© 2020                                             29

Page 31

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah




7     CONCLUSIONS

This Bushfire Hazard Assessment and Management Plan has been prepared to assess and
manage the degree of potential bushfire risk acting on the proposed Reconfiguration of a Lot
development application for Lot 101 on SP168341, located at 9a Jirrima Cres, Cooroibah.
A Local Hazard Map has been prepared for the site consistent with the State Planning Policy
– Natural Hazards, Risk and Resilience – Technical Manual – A ‘fit for purpose’ approach in
undertaking natural hazard studies and risk assessments. The Local Hazard Map has
identified that the proposed Lot 1 development footprint is located within a High Potential
Bushfire Intensity Area whilst the existing residence in Lot 2 is located within a Potential Impact




                                                                                                       DRAFT NOT FOR SUBMISSION PURPOSES
Buffer Area. Post development the proposed Lot 1 development footprint will located within a
Potential Impact Buffer Area.
A bushfire risk assessment has been undertaken in general accordance with AS/NZS ISO
31000:2018 – Risk Management Methodology. The risk assessment identified that vegetation
to be retained 14m from the proposed Lot 1 BLE exposes the future building to a pre
development Likely - Intolerable risk of ember, radiant heat and direct flame impact in the
absence of additional mitigation measures being employed. The identified risk can be reduced
to at least a Likely – Tolerable to Acceptable level where all recommendations set herein are
adopted thereby satisfying the State Planning Policy – State interest guidance material –
Natural hazards, risk and resilience – Bushfire (December 2019).
Overall, the development proposed for the site, in combination with recommendations
referenced herein, is deemed to satisfy both the Noosa Plan Natural Hazards Overlay Code
and the State Planning Policy – State interest guidance material – Natural hazards, risk and
resilience – Bushfire (December 2019) development assessment benchmarks.
Bushfire is an extremely serious and often unpredictable phenomenon that requires serious
preparatory planning and decision making to avoid potential damage to infrastructure and or
loss of life. All recommendations made herein have been formulated based on site conditions
at the time of writing and therefore may not be appropriate in the event site conditions change
over time.
Implementation of the bushfire mitigation measures referenced herein is not implied nor
intended to advocate that residents remain on the site during a bushfire event nor that people
and property will be protected from bushfire impact. The measures are intended to reduce
the potential severity of bushfire impact to persons and property and not prevent actual
bushfire impact.
The landowners and site managers are to be responsible for ensuring the measures
prescribed herein are applied and stay up to date with site conditions and industry standards.
Landholders/managers should therefore liaise with Queensland Fire and Rescue Services at
regular intervals (e.g. recommended at least every 5 years).
The first call in the event of a bushfire emergency should always be ‘000’.
7.1       Certification Matters
The following bushfire mitigation measures are to be certified as satisfactorily completed by
the project Bushfire Consultant prior to commencement of the proposed/approved uses on the
site:
      •    All actionable recommendations set in Section 5 of this report have been implemented
           (i.e. establishment of APZs, fire break trails, landscaping etc.) where practical at the
           time of certification.




© 2020                                             30

Page 32

Bushfire Hazard Assessment & Management Plan v1                             NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



8    REFERENCES

Cruz M.G., Gould J.S., Alexander M.E., Sullivan A.L., McCaw W.L., Matthews S. (2015) A
Guide to Rate of Fire Spread Models for Australian Vegetation. CSIRO Land and Water
Flagship, Canberra, ACT, and AFAC, Melbourne, Vic, 123pp.
Gould, McCaw, Cheney, Ellis & Matthews. (2007). Field Guide – Fuel assessment and fire
behaviour in dry eucalypt open forest. Ensis-CSIRO, Canberra, ACT and Department of
Environment and Conservation, Perth, WA.
Leonard, J., Opie, K. (2017). Estimating the potential bushfire hazard of vegetation patches
and corridors. An enhancement of Queensland’s methodology for State-wide mapping of
bushfire prone areas. CSIRO Land & Water, Australia.




                                                                                                DRAFT NOT FOR SUBMISSION PURPOSES
The Noosa Plan (2020). Bushfire Hazard Area Overlay Code. Noosa Council.
Queensland Fire and Emergency Services. (2019). Bushfire Resilient Communities -
Technical Reference Guide for the State Planning Policy - State Interest Guideline - Natural
Hazards, Risk and Resilience 2- Bushfire.
Queensland Fire and Emergency Services. (2015). Vehicle Access Guidelines for residential,
commercial and industrial Lots.
Southeast Queensland Fire and Biodiversity Consortium – Operational Manual.
The State of Queensland, Department of State Development, Manufacturing, Infrastructure
and Planning (2019). Natural hazards, risk and resilience - Bushfire State Planning Policy –
state interest guidance material.
Webster. (2002). The Complete Bushfire Safety Book. Random House (Aust) Pty Ltd.




© 2020                                             31

Page 33

Bushfire Hazard Assessment & Management Plan v1         NCES REF: J000706
Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah



APPENDIX 1 – SITE LAYOUT




                                                                            DRAFT NOT FOR SUBMISSION PURPOSES




© 2020                                             32

Page 34

                                                                                                                 DRAFT NOT FOR SUBMISSION PURPOSES
                                                                                                    10 . 5




                                                                                             10 .
                                                                                              0

                                                                                       9.5
                                                                                 TAP


                                                                        9.
                                                                             0



                                                               8.
                                                                    5

                                                       8 .0



                                                7 .5



                                 7.0




                       6. 5
                                       6.
                                       6 .5 5
         6. 5




    7.
0




                                                                                                             –




                MURRAY &
                ASSOCIATES
                SURVEYORS & TOWN PLANNERS                     ACN 075 543 154
                Murray Building,15-17 Currie St. Nambour Ph.(07)5441 2188 P.O. Box 246
                Branch Offices at Caboolture Chinchilla Roma Gympie & Emerald

Page 35

                                                                                                                                                                                                          2*
                                                                                                                                                                                                            30
                                                                                                                                                                                                               0
                                                                                                                                                                                                                   pip
                                                                                                                                                                                                                      es

                                                                                                                                                                                                                                    l                             rain
                                                                                                                                                                                                                               grave                        open d
                                                                                                                                              1
                                                                                                                                         SP179878




                                                                                                                                                                                                 House




                                                                                                                                                                                                                                                                           DRAFT NOT FOR SUBMISSION PURPOSES
                    INSET OF WESTERN END OF ACCESS                                                                                                                               pool

                                                                                                                                                                                                                                          100
                                                                                                                                                                                                                                        SP168341




                                                                                            el
                                                                                       av
                                                                   dam
                                                                                     gr
                                                                         2*50
                                                                             0   pipe
                                                                                     s




                                                                                                           <<
                                                                                                             ---
                                                                                                                   ope         LEGEND
                                                                                                                      nd
                                                                                                                        rain
                                                                                         --->>
                                                                                    drain
                                                                                   open




                                                                                                                    101
                                                                                                                SP168341

                                                                                                                                                                                                                                                                 TEXT



                                                                                                 NOT FOR
                                                                                          CONSTRUCTION


CERTIFIED BY:
                                                                                                                                                                                                               INSET OF OVERALL LOT
RPEQ No.:            13201 (Allister Haynes)
DATE:                6/3/2020


                                                         PSM No     -
                                                                                                                                        HAYNES CONSULTING ENGINEERS       PRELIMINARY ACCESS
                                                        (AHD) RL    -
                                                                                                                                               ABN 53 613 630 078         LOT 101 SP168341, 2 LOTS                                           1803
                                                       SURVEYED     -
                                                                                                                                        PO BOX 549 NOOSA HEADS QLD 4567   9A JIRRIMA CRESCENT, COORIOBAH, CLIENT: MAUD CAZOT                    Sheet No. - Revision No.
A   6-3-20   FOR COUNCIL RECONFIGURATION       ATH
Rv DATE               REVISIONS                APPR.
                                                                                                                                                  (0432) 784 150
                                                                                                                                                                          SITE PLAN                                                             S1                  A

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.