Original source · versioned page text
Appendix A - Bushfire Hazard Assessment & Management Plan
Attached to the e-mail RAL20/0014 - Response to Council's Information Request - 9A Jirrima Cres, Cooroibah - Email 01 of 02.
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000706 Lot 101 on SP168341 – 9a Jirrima Cres, Cooroibah 7 CONCLUSIONS This Bushfire Hazard Assessment and Management Plan has been prepared to assess and manage the degree of potential bushfire risk acting on the proposed Reconfiguration of a Lot development application for Lot 101 on SP168341, located at 9a Jirrima Cres, Cooroibah. A Local Hazard Map has been prepared for the site consistent with the State Planning Policy – Natural Hazards, Risk and Resilience – Technical Manual – A ‘fit for purpose’ approach in undertaking natural hazard studies and risk assessments. The Local Hazard Map has identified that the proposed Lot 1 development footprint is located within a High Potential Bushfire Intensity Area whilst the existing residence in Lot 2 is located within a Potential Impact DRAFT NOT FOR SUBMISSION PURPOSES Buffer Area. Post development the proposed Lot 1 development footprint will located within a Potential Impact Buffer Area. A bushfire risk assessment has been undertaken in general accordance with AS/NZS ISO 31000:2018 – Risk Management Methodology. The risk assessment identified that vegetation to be retained 14m from the proposed Lot 1 BLE exposes the future building to a pre development Likely - Intolerable risk of ember, radiant heat and direct flame impact in the absence of additional mitigation measures being employed. The identified risk can be reduced to at least a Likely – Tolerable to Acceptable level where all recommendations set herein are adopted thereby satisfying the State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019). Overall, the development proposed for the site, in combination with recommendations referenced herein, is deemed to satisfy both the Noosa Plan Natural Hazards Overlay Code and the State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) development assessment benchmarks. Bushfire is an extremely serious and often unpredictable phenomenon that requires serious preparatory planning and decision making to avoid potential damage to infrastructure and or loss of life. All recommendations made herein have been formulated based on site conditions at the time of writing and therefore may not be appropriate in the event site conditions change over time. Implementation of the bushfire mitigation measures referenced herein is not implied nor intended to advocate that residents remain on the site during a bushfire event nor that people and property will be protected from bushfire impact. The measures are intended to reduce the potential severity of bushfire impact to persons and property and not prevent actual bushfire impact. The landowners and site managers are to be responsible for ensuring the measures prescribed herein are applied and stay up to date with site conditions and industry standards. Landholders/managers should therefore liaise with Queensland Fire and Rescue Services at regular intervals (e.g. recommended at least every 5 years). The first call in the event of a bushfire emergency should always be ‘000’. 7.1 Certification Matters The following bushfire mitigation measures are to be certified as satisfactorily completed by the project Bushfire Consultant prior to commencement of the proposed/approved uses on the site: • All actionable recommendations set in Section 5 of this report have been implemented (i.e. establishment of APZs, fire break trails, landscaping etc.) where practical at the time of certification. © 2020 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.