*y ‘Transmittal Document - 13/8/10 Page | of 2 Sunshine Council e'New Item |edit Item|Alert Me Reference Number TFR-APO813N Date: 13/8/10 To: Tewantin Section: DASP Counter From: Nambour Section DASP Counter Officers Full Name: Andrea Parr ’ Actions (If Relevant): Please receipt at Processing Office; Post receipt to customer Payment Method: Cheque Total Amount $: 418.00 Details of Document Fwd: Request for Change to an Existing Approval for property in the former Tewantin area and will need to be loaded into their legacy system. Property address: 8 Piper Street Peregian Beach Lot 405 P 93116 Original Council Application 2009/1058. The application contains: Change Template Application Form, Cheque payment, Letter from Noosa Iconic Panel Planning Services Division, Copy of Council Decision Notice, Proposed Plans ‘Signature of Council Officer: AY . Created at 13/08/2010 5:23 PM by MSC\arp Last modified at 13/08/2010 5:23 PM by MSC\arp http://scrcintranet/custserv/Lists/Transmittal%20Document/DispForm.aspx?ID=3757... 13/08/2010 Klos —
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 36 pages
Page 2
( SCRC CORRESPONDENCE
iv
S0039465
=e at
responsible entity for the request has a form for the request, the request must made using that form.
This template must be lodged with the following.entity (the responsible entity) as applicable:
if the change is to a condition imposed by a Minister under chapter 6, part 11, division 1 of SPA the template must bi
lodged with the Minister that imposed the condition
. if the approval was given by a Minister under chapter 6, part 11, division 2 of SPA the template must be lodged with
the Minister that gave the approval
. if the change is to a condition of the approval imposed by a concurrence agency the template must be lodged with the
concurrence agency
. if the approval was given by the Planning and Environment Court the template must be lodged with the Planning and
Environment Court
. in all other cases the template must be lodged with the assessment manager for the original development application.
Attach extra pages if there is insufficient space on this template. Terms used in this template having the meaning given in
the Sustainable Planning Act 2009.
4. Who is making the request?”
Pow, = Fann
Name/s (individual or company name in full) 4/— The Ler ti fier Petey L tay
For companies, contact name fie above.
Postal address Fe fox 368
CLEVELVMINIO Glet YES
Contact phone number OF ZFEDIST7T7
Mobile number (non-mandatory) i
Fax number (non-mandatory) : OF BEA P AFIS
2
e-mail address (non-mandatory) JbraAfiety Lye ek \
—7
@ geez. corm aah y Re, A *
Page 3
y 4
LIL]
2: What are the details of the existing appr va 30
Type of approval Identification number | Date decision notice | Name of entity that issued the approval or
- or negotiated imposed the condition sought to be changed
decision notice
issued
oy Development
permit 009 f 108 8 aosleleF Sunshine. Coast Regional Cour
. 7
Preliminary
approval
zhe approval foam
ul
No
| Yes—complete table A and then go to question 5
Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate/ is operating
Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises ,
v] street address/{lot on the plan
C] street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description | Local government area
Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type (e.g. Logan, Cairns)
no. no. locality name code and plan no.
& Piper Street l4s73 | yos |PIIIE Sunshine Coast
Peregran Beach
Ee)
Requesi ta change an existing approval template
Version 1.1 March 2010
ee
Page 4
4 “
Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
{_] spas,
L_] wese,
| Other
5. Details of the proposed change.”
filter Cerngtitiary 32 +e aellapy (NAxIMUrY belaing Aerght of
BC 68F mr, :
yee pan eT ae AE GR Be
"6. Is owner's consent required for.
I x
[| Yes—complete either table D or table E as applicable
Table D
Name of owner of the land
1, the above-mentioned owner of the land, consent to the making of this request.
Signature of owner of the land
Date
Table E
Name of owner of the land
[ ] The owner’s written consent is attached
3 Request fo change an axisting approval template
Version 1.1 March 2010
Page 5
147 8 the mh al No [| Yes—the written agreement of the chief executive from whom evidence would need to be obtained under the Sustainable Planning Act 2009, section 254(1) must be attached. a Yes—complete Table F Table F A copy of this request has been provided to the entities identified below (provide details for each entity given a copy of the request and the date the copy was given) (4 Assessment manager for the original application Sunshine. Coast Regione / Courer/ M] Concurrence agencies for the original application Pueensland Government - (Nese lene pone! [| Any other entity prescribed by a regulation 10. Provide detailé of any other supporting information attached to this request. fimencaed plans attached. Plans sAorn, height exeaceds Sry Aewght hone ony here. Jnr (evel fails auay. Weight 4S eplg @xe fecteeY 179 A Small &- 23m? Aare a of recf, a Notes for completing this template ¢ This template is not an approved form under the Sustainable Planning Act 2009. The entity responsible for deciding the request may have their own form for the purpose of making a written request to change an existing development approval. A change to an existing development approval may involve: ° a change to an approval given by the assessment manager ° a change to a condition imposed by a concurrence agency ° a change to an approval given by the Minister under a Ministerial call in ° a change to a-condition imposed by the Minister under a Ministerial direction ° a change to an approval given by the Planning and Environment Court 4 Request fo change an existing approval template Version 1.1 March 2010
Page 6
ab ooo Question 6: * Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the approval relates, the request must be accompanied by the owner’s consent. ¢ However, owner’s consent is not required if the approval: ° relates to land that was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the apptication for the approval was made ° is for buitding work or operational work for the supply of community infrastructure on land designated for the community infrastructure, or ° the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development application were made for the requested change ¢ Also, owners’ consent is not required if the responsible entity is satisfied that: ° the number of owners of the land make it impracticable to obtain owners’ consent, and the requested change does not materially affect the owners’ tand, or oO having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change does not materially affect the owner’s land. ‘Question 7: * Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at the time’of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be required under section 264(1). (Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.) Question 9: Section 372 of the Sustainable Planning Act 2009 requires that a copy of the request be given to: ° the assessment manager for the original application, if the request is made to a concurrence agency, the Minister, or the court . ° any concurrence agencies for the original application, if the request is made to the assessment manager for the original application, the Minister or the court ° any other entity prescribed by a regulation. « However, a copy of the request is not required to be given to an entity that has given a pre-request response notice for the request. OFFICE USE ONLY Date received Reference numbers $ Request fo change an existing epproval template Version 1,1 March 2010
Page 7
a Queensland - Government Our ref: SPLI55 — , ses vivina ayes tstintmeneenemavane Your ref: 13.2009.1058.1 . Noosa Iconic Panel 11 September 2009 The Certifier PO Box 368 Cleveland QLD 4163 Dear Sir/Madam Your application for a Material Change of Use, Detached House at 8 Piper Street, Peregian Beach, made to the Sunshine Coast Regional Council on 11 August 2009, has been referred to the Noosa Iconic place development assessment panel for consideration, as required under the Iconic Queensland Places Act 2008 QQPA). Your application was referred as your development property is located within the declared Noosa iconic place area. I wish to advise that the panel’s reference decision made on 11 September 2009 is that the Sunshine Coast Regional Council must continue to act as the assessment manager and decide the application. The Council will issue a decision notice for the application, and the panel will have no further involvement in your application. Attached is some information extracted from the Department of Infrastructure and Planning website about the declaration of the Noosa Iconic Place and the role of the development assessment panel. If you have any queries in relation to the processing of your applications, you should contact the Sunshine Coast Regional Council. . Yours sincerely Ai Amy Marsden Director Planning Services Division 63 Gearge Street Brisbane PO Box 15009 City East Queenstand 4002 Australia Telephone + 61 7 3033 0596 Facsimile + 61 7 3225 2238 Website www.dip.qid.gov.au ABN 25 166 523 889
Page 8
a Extract from DIP website http,//www.dip.qld.gov.au/planning-and-development/iconic-declaration.htm! Further information and FACT SHEETS are also available from the website. Econic declaration under the Jeanic Queensland Places Act 2008 (QP A) An iconic place declaration identifies: * the characteristics or qualities of the place’s natural or built environment that the Minister is satisfied reflect or contribute in a substantial way to Queensland’s character (the place’s iconic values) = any provisions (each a protected planning provision) of the local planning instruments of each relevant local government that the Minister is satisfied protect the place’s iconic values = any local laws of each relevant local government that the Minister is satisfied protect the place’s iconic values. On 20 June 2008 the Honourable Paul Lucas, Deputy Premier and Minister for Infrastructure and Planning, made the following declarations: » Blackall Range (4~' 36 KB) s Central Capricorn Coast (Livingstone Localities) (> 49 KB) « Douglas (* 37 KB) = Noosa (A 37 KB). Protection for iconic places The IQPA provides protection mechanisms for declared iconic places. The major protection components relate to planning schemes, development assessment and local laws, Development that is allowed under planning schemes prior to an iconic place declaration can still occur. The Act does not replace, remove or add to the current planning provisions in the planning schemes. Private property and development assessments The protection provided by the IQPA does not affect the development rights of property owners. Any development that is allowed under planning schemes can still occur and any development that is not allowcd under the planning schemes is still not allowed. The IQPA merely provides an independent assessment body when considering development applications that may impact on the iconic values of a place. The development assessment process under the IQPA follows the Integrated Development Assessment System (IDAS) established under the Integrated Planning Act 1997 (IPA). The IQPA establishes an independent Development Assessment Panel (the panel) to operate under this process. The function of the pane] is to determine whether it will act as the assessment manager and decide an application instead of the local government. If the panel chooses not to decide an application, the local government will continue to act as the assessment manager under the IDAS. Development Assessment Panel Development assessment panels were gazetted for the Noosa and Douglas Iconic places on 20 June 2008, and for the Blackall Range and Centra] Capricorn Coast Iconic places on 19 December 2008. The panels are required under the IQPA to consider the effect of any development applications lodged with the relevant local government as the assessment manager on the gazetted iconic values of the place. In making the ‘reference decision’ about whether the panel will act as the assessment manager in the place of the local government, the pane! must consider any substantial cffect that the development has or may have on the place’s iconic values, having regard to the protected planning provisions for the place. . The panels meet regularly to make reference decisions and to decide any applications when acting as the assessment manager in the place of the local government. Panel mectings are not open to the public however the agendas and minutes of these meetings will be made available on this department’s website. The panels must abide by a code of conduct (/+ 54 KB).
Page 9
Locked Bag 72 ¥ O7 5475 7272
Sunshine Coast Mail Centre F 07 5475 7277
Qld 4560 E [email protected]
ABN 37 876 973 913 . 448 wwew.sunshinecoast.qid.gov.au
Officer: Glen Confort
Direct Telephone: (07) 5449 5379
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Emait: [email protected]
Our Reference: 2009/1058
Your Reference:
§ October 2009
The Certifier
PO Box 368
CLEVELAND QLD 4163
Dear Madam
Decision Notice
Integrated Planning Act 1997
| refer to your application and advise that on 1 October 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
Application No: 2009/1058 >
Street address: 8 Piper Street, Peregian Beach
Real property description: ° Lot 405 P93116
Planning Scheme: The Noosa Plan
The following type of approval has been issued:
. Development Permit for Material Change of Use - Detached House
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development.
“Plan | Number “T Rev. | , Plan - Prepared by : " . Date
~SK1.0_ Title Sheet ~ ~ Sparks Architect == 31 August 2009
SK1.1 ! Site Plan — Sparks Architect | 31 August 2009
“SK1.200 B Ground Floor Plan ~ Sparks Architect 31 ‘August 2009
Page 1 of 17
Caloundra Office Maroochydore Office Nambour Office Tewantin Office
1 Omrah Avenue 41 - 13 Ocean Siresi Cnr Currie and Bury Streets 9 Pelican Street
Caloundra Ole 4551 taroochydore Old 4558 Nambour Qld 4560 Tewaniin Qld 4565
TAF &aon anAA TAT RATE ARN TAT RATR RANA TAZ RAAG 590N
Page 10
2009/1058
: 31 August 2009
31 August 2009
“31 August 2009
; North East elevation - Sparks Architect 737 August 2009
South East Elevation — Sparks Architect. 31 August 2009
South West Elevation — Sparks Architect 31 August 2009
Section A - Sparks Architect “31 August 2006
‘Section B — Sparks Architect “37 August 2009 ©
: : ! Section Sparks ‘eohitect A 31 Agus 3008”
and as may be amended by these conditions and annotations on the plans. oo
First Floor Plan — Sparks Architect
Roof Plan ~ Sparks Architect ~
North West Elevation — Sparks Architect
Relevant Period
2.
The Development Permit for a material change of use lapses if the use has not happened by
1 October 2013, unless an application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural ground level, the finished
ground level and 2 storey.
4. A verification survey of the building is to be carried. out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum: allowable building height as required by either the conditions of approval or the
Planning Séheme. >
Security Bond /
5. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Landscaping and Vegetation
6.
All Pandanus tectorius trees on site shall be retained, or, alternatively relocated to a suitable
location on site. In this regard all Pandanus tectorius trees on site shall be surveyed and
indicated on the a site plan and submitted to Council's Planning Assessment Section -
Tewantin Office prior to the issue of a development permit for building works.
Existing trees on the site and within road reserves are to be retained, except where required |
to be removed due to building operations or the conduct of the approved use. fn this regard
the removal of vegetation shall not extend beyond metres 3 metres of the building footprint
of the detached house, with the exception of the Pandanus tectorius trees pursuant to
Candition 6. . :
A minimum of 20% of the site shail be retained as soft landscaping.
All other vegetation shall be protected from interference resulting from clearing or
construction activities by:
9.1. Clearly marking vegetation to be retained with flagging tape;
9.2. Installing protective fencing around the drip line of the vegetation;
9.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does
not cause interference with vegetation; and
Page 2 of tf
Page 11
2009/1058
10.
41,
12.
13.
9.4, Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
Cleared vegetation is to be suitably pracessed by one of the following methods and removed
from the site:
10.1. Processing through a woodchipper or shredder. The resulting mulch is to be,
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
10.2. Disposal for firewood.
10.3. Disposal for landscaping purposes.
10.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
10.5. The applicant is advised that burning off is an unacceptable meéthod of disposal.
Dense screening vegetation shall be planted to the raised front setback area to the south
side of the driveway and planted in accordance with Council’s Planning Scheme Policy
PSP3 Landscaping Plants and Guidelines.
A mix of native landscaping such as ground covers, shrubs and trees shall be provided for a
width of 3m from the seaward boundary and planted in accordance with Council's Planning
Scheme Policy PSP3 Landscaping Plants and Guidelines
Landscape structures including retaining walls shall be setback a minimum of 6m from the
seaward boundary, except for the swimming pool, which shall be setback a minimum of 3
metres,
General
14.
15,
16.
17.
18.
19.
Buildings and structures {including swimming pools, sheds, tennis courts or outbuildings)
shall not be constructed under overhead electricity transmission lines, or within any
easements,
The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation
Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres
per min. Dishwashers and washing machines are excluded from this requirement.
All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
External colours and finishes of the building shall comprise of muted/environmental tones
that blend with the natural environment.
Gates must not be installed along the rear property boundary.
Demolition or Relocation of Existing Dwelling
20.
21.
Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority.
All infrastructure must be disconnected, capped or sealed including:
21.1. electricity meters removed and electrical wires disconnected; and
21,2, telephone lines are disconnected; and
Page 3 of 11
Page 12
2009/1058 22. 23. 24, 25. 26. 27. 28, 29. ” Bricks 21.3. high speed data cables and television provider boxes are disconnected and removed to the standard required by the regulatory authority All building materials containing asbestos, including asbestos cement sheeting.or roofing and lagging, must be removed from the building and disposed of in accordance with industry best practice. Waste generated during construction must be stockpiled in a centralised location and covered as required to prevent material being blown onto adjoining properties including the road reserve or food waste from generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly or via an approved waste receptacle and collection service. Storage areas are to be located near the temporary access to the site so that access can be gained with out damage to infrastructure. All building materials containing asbestos products must be disposed on in accordance with indusiry best practice. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the relocation site or between the sites must be repaired or reinstated to at least pre- existing conditions. All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed areas are revegetated using species identified in PSP3 — Landscaping Plants and Guidelines. The transportation of all materials to and from the site must be undertaken in a manner such that no particle matler escapes onto a public road. All vehicles carrying out materials either to or from the site shall be covered to prevent materials, including dust, being windblown from the vehicle. A Waste Management Plan (demolition) shall be submitted to the Planning Assessment section of the Sunshine Coast Regional Council ~ Tewantin office, prior to the issue of a- development permit for building works. The waste Management Plan (demolition) is required to be submitted in accordance with Planning Scheme Policy 11- Waste Management Plans. The Plan shall contain the following information:- ° A waste management table as indicated below is to be completed showing how waste material is to be segregated — recycled — reused or disposed. “MATERIALS ON-SITE DESTINATION | - Re-use and Recycling ‘Disposal Expected waste materials Estimated : On-site “specify : ‘Off-site “specify ° “Specify : volume (m3) | proposed reuse or ; contractor & : contractor & : : onsite recycling : recycling outlet : landfill site methods : : Excavation material © Green waste Concrete Timber — please specify “Plasterboard Page 4 of 17
Page 13
2009/1058
“Melais — please specify 7
Asbestos
ner — please specify ©
NOTE: Details of site area to be used for onsite separation, treatment and storage
(including weather protection) shall be provided on the plan drawings accompanying your
application.
i The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
| effective reuse and recycling of such materials. Additionally, Council rewards those who
| segregate waste by significantly reducing disposal fees at the landfill with some items free.
: Higher gate fees are charged for loads of mixed waste.
Vehicle Access
30. A vehicular access driveway to serve the house shall be constructed from the Piper Street
frontage of the site with a maximum width of 4.5m pursuant to the Detached House
Driveways Code.
31. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
. The applicant shall demonstrate compliance by illustrating these sight lines on the plans
submitted for Building Works approval.
32. A Road/Footpath Permit shall be completed and submitted for the construction of the access
driveway in accordance with Council's Local Law No.8. If approval is given the driveway
Shall be constructed in accordance with Council's standard drawings, which will be provided
at time of approval.
" Roof Water & Stormwater Drainage
33. Roof runoff from any new building shall be directed to a rainwater storage system or tank
with a minimum capacity of 3000 litres that is installed to ensure water from the rainwater
storage system or tank is used for external purposes (such as watering gardens, irrigation,
ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and
for internal (ground floor) use in washing machine cold taps and toilet cisterns.
34. All rainwater tanks are to be designed and installed in accordance with the Queensland
Development Code (QDC) current at the time of building approval, and shall be part of the
plumbing application for approval. The location and capacity of the tanks shall be clearly
shown on the plans submitted for Building Works approval and any overflow shall be
directed to the Piper Street road frontage.
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council's
kerb & channel drainage system in Piper Street or discharged via on-site infiltration pits.
Plans of the drainage design must be prepared and certified by a Registered Professional
Civil Engineer and submitted for Building Works Approval.
1. The maximum discharge of stormwater drainage allowable to Council's kerb &
channel street drainage system at any one location is 25 litres/second.
2. The stormwater drainage design must ensure that no ponding or scour occurs on ;
the subject site or on neighbouring properties.
36. All site stormwater drainage shall be by means of a gravity system.
Page Sof 71
Page 14
2009/1058 Sewer Mains 37. 33. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. The applicant is advised that this approval does not relate to sewer main setbacks within the site or adjacent to the site, as a Building Certifier will assess this during the Building Application process and after consultation with Council's Water & Sewerage section. Should any Council sewer mains be affected as a result of non-compliance with this condition, the Building Certifier will be held personally liable. To this end, all Building Applications will need a site plan prepared & certified by a licensed surveyor clearly illustrating the exact location of any séwer mains and the ‘zone of influence’ of these mains. Town Water Supply 39. 40. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each individual water connection to the water reticulation system shail extend to the property boundary and be metered. All fees for the’ supply of water meters shall be paid to the Council. Earthworks 41. 42. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Building Works approval. Earthworks required on site shall be carried out in accordance with Council's Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. Site Stability 43. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or land, and make recommendations on the type of foundation system(s) best suited for the proposed development and recommend any measures to prevent slumping during excavations. The recommendations of this report shall be incorporated into the design and construction of the proposed development. Erosion and Sediment Control 44, Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controled gravel access to the site and controlled disposal of waste, will be necessary. in this regard, plans detailing the methods of controlling erosion and sediment in accordance with the Healthy Waterways document and fact sheet series titled Controlling Stormwater Pollution on your Building Site dated 2006 are required to be submitted with the application for a Building Works Permit. General Engineering 45. 46. Any damage caused to any public utility during the course of construction shail be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council Page 6 of 17
Page 15
2009/1058 s
The referral agencies applicable to this application are:
Referral Trigger
| Not applicable
GENCY CONDITIONS:
. Referral Address
syprmenenae
Referral Status | Referral Agency
The approved plans and / or documents for this development approval are listed in the following
table:
Big Number”
$K1.0
ea"
SK1.4
"SK2.1 |
SK1.2
SK2.2
- $k2.3
SK2.4
SK3.2
"ADVISORY NOTES
pia ZBrepared by Bat
Title Sheet “Sparks Architect” “3 August 2009"
Site Plan — Sparks Architect 31 August 2008
"34 August 2009
' First Floor Pian — Sparks Architect’ "31 August 2009
~~ Roof Pian ~ Sparks Architect : 31 August 2009
“North West Elevation — Sparks Architect” 37 August’2009°7
Ground Fioor Pian ~ Sparks Architect
North East elevation - Sparks Architect 34 August 2009
South East Elevation - Sparks Architect. © 34 August’2000°"
° South West Elevation — Sparks Architect , 31 August 2009 ~
ection A — Sparks Architect 31 August 2009
Section B ~ Sparks Architect : 34 August 2009 :
~ Sparks Architect 34 August 2000
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.
The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:
41. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legistation.
You are advised that the site is identified as a Koala Living Area under the Nature
Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and
may contain koalas. The use of a Koala Spotter is encouraged ih areas where koalas are
likely to occur, before the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and
Melaleuca species. Further information can be obtained from the Environmental Protection
Agency at http:/Avww.epa.gid.gov.au or phone (07) 3227 8185.
Before the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing &
Drainage Act 2002 (as applicable). :
Page 7 of 17
Page 16
2009/1088
4. For properties located in the catchment area for the Coastal Major Road Network
Infrastructure Charges Plan, a Building Works application may trigger an Infrastructure
Charge payable to Council in accordance with the Infrastructure Charges Plan and Chapter
5 of the Integrated Planning Act 1997 ,
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. it is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage vaiue of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
The follawing property notes will be placed against the subject property in Council's property record
system:
Not applicable
Not applicable
; URTHER DEVELO
Type of Development Permit i j the required Development Permit _
Development Permit for Building Works All Building Works
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
Not applicable
Not applicable
Page 8 of 11
Page 17
2009/1058 You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Integrated Planning Act 1997 is attached. During the appeal period, you as the applicant may make written representations to Council about the conditions contained within the development approval. If Council agrees or part agrees with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will continue after Council makes its decision. (Refer to sections 3.5.17 and 3.5.18 of the integrated Planning Act 1997). AIL Should you wish to obtain more information about Council's decision electronic copies are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices. Yours faithfully, LO Glen Conforti Planning Technical Officer Page 9 of 17
Page 18
2009/1058
|
| Regional Council
Sunshine Coast . Appeal Rights
: INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
2 Integrated:
Division 8 - Appeals to court relating to
development applications
Appeals by applicants
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;'
(c) the decision to give a preliminary approval when a
development permit was applied for;
(d) the length of a relevant period;
(e) a deemed refusal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant's
appeal period”) after the day the decision notice or
negotiated decision natice is given to the applicant.
(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals by submitters
4.1,28.(1) A submitter for a development application
may appeal to the court about-
(a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or
(b) the tength of a relevant period for the approval.
(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the
decision.
(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitters are available only for the part of the
application involving impact assessment.
{5) If an application is processed under section
6.1.28(2), appeal sights for submitters for the
application are available only for the aspects of the
development that would have required public
notification under the repealed Act.
a.
' Section 3.1.6 (Preliminary approval may override
local planning instrument)
- -(6) If an application involves assessment against a
concurrence agency code, appeal rights for submitters
for the application are not available against the part of
the approval that represents the concurrence agency's
response for the cade.
Appeals by advice agency submitters
4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
development approval for a development application
if-
(a) the development application involves impact
assessment; and
‘{b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.
(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.
Appeals for matters arising after approval given
(co-respondents)
4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
following notices have been given may appeal to the
court against the decision in the notice-
(a) a notice giving a decision on a request for
extension of the relevant period for an approval;
(b) a notice giving a decision on a request to make a
minor change to an approval.
_ (2) The appeal must be started within 20 business
days after the day the notice of the decision is given to
ihe person.
(3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme.
(4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(5) An appeal under subsection (4) may be started
at any time after the last day the decision on the
matter should have been made.
Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
{no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
{a} a notice giving a decision on a request to change
or cancel a condition of a development approval.
Page 10 of 17
Page 19
2009/1058
( b).a.notice under section 6.1.44" giving a decision.to~-{d) the length of-@- period: mentioned IW SSSIONSS-21
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20
business days after the day the notice of the decision
is given to the person.
{3) Also, a person who has made a request
mentioned in subsection (1a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3} may be
started at any time after the last day thé decision on
the maiter should have been made.
Appeals against decisions to change approval
conditions under the repeated Act
4.1.33A.(1} A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection {1)(a) must be
started wilhin 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1b) may be
Started at any time after the last day a decision on the
matter should have been mace.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a focal government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeai to the court
against the decision or the conditions applied.
(2) The appeal must be started within 20 business
Gays after the day notice of the decision is given to the
applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
integrated Planning Act 1997 as follows:
Division 3 - Appeals to tribunals relating to
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.67 /
(c) the decision to give a preliminary approval when a
development permit was applied for; -
a. SS
? Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3 Section 3.1.6 (Pretiminary approval may override
focal planning instrument)
relevant period;
(e) a deemed refusal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days {the ‘applicant's
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.
(3) An appeal under subsection {1)(e) may be
started at any time after the last day a decision on the.
matter should have been made,
The Registrar for the Building and Development
Tribunal may be contacted at the website
htto:/iwww.localgovernment.qid.gov.aul
For Infrastructure Charges Only
4.1.36 Appeals about particular infrastructure
charges
(1) This section applies to a person who has been
given, and is dissatisfied with, an infrastructure
charges notice or a regulated State infrastructure
charges notice.
(2) The person may appeal to the court against the
notice.
{3) The appeal must be started within 20 business
days after-
(a) _ if the notice is given because of a development
approval or master plan approval-the day the
applicant is given notice of the decision about the
approval; or .
{b) otherwise-the day the notice is given to the
person.
(4) An appeal under this section may only be about-
(a) whether a charge in the notice is so
unreasonable that no reasonable relevant local
government, State infrastructure provider or
coordinating agency could have imposed it; or
({b) an error in the calculation of the charge.
{5) To remove any doubt, it is declared that an
appeal under this section can not be about the
methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
State infrastructure charges schedule.
Page 11 of 11
Page 20
Sketch Design
of:
}
Proposed New Residence
Drawing Schedule
1.0 TITLE SHEET
11 SITE PLAN
1.2 GROUND FLOOR PLAN
1.3 FIRSTFLOOR PLAN
1.6 ROOF PLAN
Rev|[Dole | Issued
1A Biomo8) ON
bnplicands “aw
{ DA approval )
for 24 NORTH WEST ELEVATION
2.2 NORTHEAST ELEVATION
, 2.3 SOUTH EAST ELEVATION
Doug and Pam Mc Taggart 24 SOUTH WEST ELEVATION
at 3.1 SECTIONA
3.2 SECTIONB
. . 33 SECTION
8 Piper St, Peregian
Date: 31 August 2009
© t *
sie details _
LOT 405 ON P-93116 teal
Parlsh of Maraochy Ground Floor 137.62
County of Canning First Floor e9.1né
Local Authority:
Sunshine Coast Regional TOTAL 206.7m?
Counc ta tetera ee
. Extemai
Ground Floor
decks / stalrs & seat- 171m
raised lawn / garden - 33.0m*
First Floor 176.6m?
SITE AREA 534-4 me | dacks & stairs
TOTAL 226.7m2
Pool & pond 52.3m?
= Rihanna, Hae New Residence nat to scole
sparks architects 8 Piper Street Peregion Beach Daug and Pom McTaggart 025 OS July 09 TITLE SHEET KIO
project . dient fobne, | drown | dateot firstissue | drawing dwg ne.
Page 21
parks architects
Rev, ksued [Details :
B_ {31.08.08} TN |DA sumbmisston 2
Piper street... «
9590 85 °
extent of existing residence shown
small dashed, tc be demolished
|
——
DA approval ).
‘New Residence Sale200@A3 HM LF LS Ltr
& Piper Street Peregion Beach Doug and Pom Mctoggart 025 DS duly 09 SHTE PLAN SKI
project cient jeboo. | drawn | daweoffrstissue | drawing dhvg no
@)
Page 22
oC. : Pad te [peu —-——| _DAapproval_) refridgerator hot plate dishwasher sink A 1.5m setback if iy Temas rae \ Ae = : 7 Scola 00@A3 UU. co . IN ae & Piper Street Peregian Beach Doug ond Pam McTaggart 025 os Juty 09 GROUND FLOOR PLAN 5.2 (YY) ~ eee progect cent Job no. dravm | dotactfirstissue | drawing ding no, sparks architects
Page 23
! - . ( | Sen Oe ——— 1 DA approval) refridgerator hot plate dishwasher sink laundry tub vantly basin store robe O living pavilion srocycted harSeood ¢ fa New Residence Scale 100A (IN/NML f—t sparksarchifects ¥ — 8 Piper Street Peregian Beach Doug and Pam McTaggart 025 (| DS July 09 FIRST FLOOR PLAN SKI3 ) y project lent bac. | dram | dateofirst issue | drawing dwg no,
Page 24
2 _C f legand ) RS1 custom orb RS2 twin wall translucent polycarbonale propased poskion future photovollaic array Rev [Date’ } Issued [Details A 81.08.09; a_i | DA approval ). Scale IOO@AS UUNMUL 1) = @)) [a nea New Residence sparks architects Veneration 8 Piper Sireet Peregian Beach ‘Doug ond Pam Mckaggart 025 Ds Juty 09 ROOF PLAN epcoway ang sua project cient jobna, | drawn | daveoflistissue | drawing
Page 25
ss
. TRev[Dote _] Issued [Details :
- PR B1.08.00] SRE cont “4 DA approval ) .
ca Coforbond
Fibre cement sheeting
PLY "Plywood
PS Painted sigel
RB Rendered block
TP Twin wall translucent
2) I)
3
polycarbonate
HWD Recycled herdwood
RSI Colorbond custom orb
RSZ ‘Twin wal transtucent
* polycarhonate 3
AS BA ape an
af BP RAS
“gl
1 structural elements including footings, walls
hd framing fo be in accordance with engineers
wester
al
désign and detal. .
ty,
taster bounda
[ege ienaeam New Residence sete oe as LAMML__ L___1
8 Piper Sireel Paregion Beach Doug and Pam McTeggart 025 DS Juyoe | NORTH WEST ELEVATION: SK21
sparks architects 3
A
( ey % __ Senngvetlenee project ~T chent jobno. | dravm | doieofirstissue | drawing dwg no.
Page 26
“a
Se
Rev|Dale | Issued [Details
A Pros TN_|OA sumbaission 2 —— DA approvat )
All structural etemants including footings, walls
and framing to be in accordance with engineers
design and detail.
sparks architects
cs Colorbond
FC Fibre cement sheeting
PLY Plywood
PS Painted staal
RB Rendered block
1P Twin wali anslucent
polycarbonate
HWD Recycled hardwood
RSI Colarbend custom orb . pholovollaic array
RS2 ‘Twin wall wanshucent .
potyearbonate height Umit at Eastern most building
extremity running paralta! with boundary
rm
mary,
&
northern hour
[Us
matt | 40>
at ta)
ee
Gr
Coal an Ot
» SPuthern bow
3
festfoor_ N70,
covered deck - 11400
ground floor - fl 8 700
iN Wo sin
kh h
"Spat Remar eee aay GIDE 5
Ransin nes New Residence
Soommpeooraien project cient jobro. { drown | dateol first issue | drawing dwg no.
Page 27
2
3
a
a
A
DA approval -)
Golorbond
Fibre cement sheeting
Plywood
Painled steel
Rendered block
‘Twin wall transkicent
polycarbonate
Recytied hardwood
Colorbond custom orb
Twin wall transhucent
polycarbonate
4 [Zine elgegns Including
6 fsStping jo'be In -apearda
design [email protected] imt al Southem facade
dary
Ary
vestorp bow
1
_ Baste boundau
3
S gh
2 a
wT
oy
OS NY ic
first|floor “ae
ground floor __- ffl 8 700
|
( . HWWD timber soreen,
existing ground fine shown dashed +
sparks architects
New Residence Scale 1:300 @ A3
8 Piper Street Peregian Beach Doug end Pam MeTaggert 02s os July OF SQUTH EAST ELEVATION SK2.3 C)
projec chen Jobno, | draw | dotwolfislissue | droning dig no.
Page 28
Colorbond
Fibre cement sheeting
Plywood
Palnted steel
Rendered block
Twin wall transtucent
polycarbonate
Recycled hardwood
Colorbond custom orb
Twin wall transtucent
polycarbonate
Al structural elements including footings, was
and framing to be in accordance with engineers
design and detail,
sparks architects
first floor = __ sf. 10,700_
entry dock" ~~ 11 400
‘
ground floor __ _- fl 8700
DA approval ) “
Rev [Date "| issued |Delais |
A_81.08.08} IGA sumbmission 2 I
at Western most building
running paralle! with boundary
1
\
\
\
‘
‘
orthem bout
thom bou
'
'
’
'
1
1
t
1
t
I!
,
‘
‘
1
'
'
'
1
'
'
’
|
'
a tl
" v
aN} ~s
She eee SUNSHINE COAS
2 —— ! ° REGIONAL COUNICH
PLANS APPROVED
sora, Le eo
| |
I : | a
| | ate: nt Ck ObeY 2204.
| |
| |
2008 Jose
New Rasidence Scale L00@A3 UUUUUNL_fL__)
-8 Piper Slreet Peregicn Beach Doug ond Pam McTaggart 025 os July 09 SOUTH WEST ELEVATION SK24
projec deat labo. [drown | doteoffirstissue | drawing dug no,
Page 29
DA approval ) ,
Fitve cement sheeling
PLY, Prywood
PS Painted steel
RB Rendered block
TTP Twin wall translucent
polycarbonate
HWO Recytied hardwood
Rei} Colorbond custom orb
Rs2| ‘Twin wall translucent
polycarbonate
All struttural elements Inctuding footings, walls
and fraining to be in accordance with engineers
design pr ‘detail,
45 000 litre rainwater tank I
localed under gasape
SUNSHINE COAST
REGIONAL | COUNCIL
D
PLANS AM os
exiting ground line shown dashed
! 1
{ J
6m setback
Ser
000
i | |
| NZ GEESt es New Residence sae Ooon ULF Ls
: sparks archilects FNS = een 1 Piper Sees Peregion Beach Doug and Porn McTaggart 02s | os aly 09 SECON A SK
ARS. GR EEELY aa project cient eno. | drow | date offirstissue | deaming avg no.
|
Page 30
Rev[Ocie — 7 ssved|Cetals T pe Pee at TN |OAsumbrisaion 2 + DAapproval — )- Colorbond Fibre cement sheeting Plywood Painted sloal Rendered block ‘Twin wail translucent polycarbonate Recycted hardwood Colorbond custom ort Twin wall transtucent polycarbonate height limit at section B ‘All stnsctural elamonts including footings, wats and framing to be in accordance wilh enginoers design and detail. te) REGIONAL COUNCIL PLANS DPEROYED i ib Lekh a Birra, z _ = shown dasdd SUNSHINE COAST | ae nec act oa New Residenca Seole 00 PAI LINNL___f—___ Lm} sparks architects Santee ot 8 Piper Stree! Peregion Beach oug and Pam McTaggart 025 | OS July 09 SECTION B sK3.2 See Ear e a projec cellent Jobo. | drovm =| dateotfirstissue | drawing dwg no.
Page 31
Tete one oeenemaa —~—| _DAcpproval_)
Colorband
Fibre cemant sheeting
Plywood
Painted stee!
Rendered block
‘Twin wall translucent
polycarbonate
Recycted hardwood
Colortond custont ort
Twin wall iranslucant
polycarbonate
ry
A structural elements including footings, walis
and (taming to be in accordance with angineers
design|and detail.
HWD limber screen i fi S Sa fae
; by ; = pivating screens ,
; fiestfoor MM 41700, fall JAMS LISTE 28 me - a : oth ct Dace en ee eee
‘
ground floor -f 87008 ort ESSE cate —~ eee
( SUNS
7 Pane a UNCIL
et NS 4PER OVER
. ey
| Sintoas LEA
existing graund line shown dashed | Daio:
* ——
New Residence. Scale 100@A3 PULL fd ,
+ & Pipes Stree! Peregion Beach Doug ond Pam McTaggart 025 DS July 09 SECTION 5K3.3
project client jepne. | crown | doteoffrstissue | drawing dwg no
Page 32
}
Construction
| Issued { Details
line of Quilding below
shown dashed
Rev Date ,
proposed location of solar pool heating
(9 }--——— Se
it
— H
low
liding bel:
tine of bui
proposed position of
photovoltaic array
solar hot water —--—--_-_—_—
shawn dashed
C
1
|
t
|
|
)
not true lengths
NOTE: roof dimensions are on
the horizontal plan and
therefor
7 wo7.l
iL dwg no.
Scale 100@A3 (UIMM_--L__|
| ROOF PLAN-PROTRUSION
| drawing i
20 Nov 10
date of first issue
waar - OFS
2
| Ds
Liob no. [ drawn
| 025
x
i Doug and Pam McTaggart
i? relent
coats | gon OES
New Residence
18 Piper Street Peregian Beach
project
1062 y 4.208 +
oid austicta
£
‘Sparks orchitorts ply abr, 39 124 at 72h
gi rclatont's regetabea to. 1974
Page 33
© ¥ EEE "ee
Re i il 7 T
C By pate Seve [Oeets | Construction »
height limit at section 2
portion of roof protruding x - ~
through height line a
portion which protrudes is where
site dramatically falls away
tn
VIEW 2
e
height limit at section 1
VIEW 1
ee
a a aa New Residence Seale I00@A3 [MUL Fd
sparks architects | 8 Piper Street Peregian Beach Doug and Pam McTaggart | 025 oS | 20Novi0 ; WO72~
— ats - 4 - re
Satgeerataeanen ts 3974 project 7 —-client | job no. | drawn | date of firstissue | drawing | dwg no.
+
Page 34
&
spark
sarc
hite-¢t-s
EIS re
[Fe bate [Issued [Details ]
| { t
Construction )
South Western neighbours views are not as greatly affected.
The potential for views to be obscured by the height line at the rear
coiuld have potentially been much worse had the buildings design
utilised the full height limit at the rear of the site
| New Residence
i 8 Piper Street Peregian Beach
| Doug and Pam Mictaggart
| Seale 1:100 @ A3 UL
| 20 Nov10 | SOUTH WEST ELEVATION | wo7.3
: I project ie
client,
drawn | date of first issue i drawing P dwg no.
Page 35
C j Fee Date sees Pere Construction ) — North Eastern Arial View ; , South Eastern Arial View roof protrusion circled in red, typical [oo height limit, typical North Eastern View ~ New Residence Scale 100 @ 43 YUL S—_I sparks architects ari : " ~ TP" Boug and Pam McTaggart 025 “| 6s ~~ | 20 Nov 10 | 30 Views 7 WO7.4 ANS " : : " a cllent Si AO. [drawn =dateof firstissue—|—drawing |_cw9.no, Z unk
Page 36
Sunshine Coast LAND USE SECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 410 The Noosa Plan Documentation : 111 APPLICATION FEES Material Change of Use - Code/Impact Consistent §21 Inconsistent : 521 Assessment under Superseded Planning Scheme 521 - Modification to a Development Permit La rv §21 Extension of a Currency Period. 521 Operational Works - Landscaping 521 Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour §22 . One Hour §22 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee - 524 Jetty Bond ‘ % : __. 51 (Category 4) BONDS , ’ Performance Bond 54 (Category 9) SIGNS Registration Fee : . 222 SEARCH FEE : Search of Land Use Section file 112 Liquor Licensing Request oo, . : 413 TOTAL $ ws NAME: Wap Cart fer ADDRESS: CO bere. BOF CAEL AIS Ii 2 : FILE NO: ot lies? DATE: — 2°/8/(n t RECEIPT NO: 674 ofS Signature of TP Officer: AUTHORITY NO: SoA [105 #]2
Page 37
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
09/1058 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.