Original source · versioned page text
Pre Development Catchment
TBM
IRON
PIN
RL 107.04
AHD
///
///
///
///
///
///
///
///
///
///
///
LEGEND:
///
///
///
///
///
TBM
///
IRON
PIN
RL 110.77
AHD
///
///
///
///
TBM
NAIL IN
CONC.
RL 106.28
AHD
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
GREG ROSTRON PRE CATCHMENT DEVELOPMENT
DATUM: AHD LAYOUT PLAN
A 06.03.24 ISSUED FOR APPROVAL QT GWA
PROJECT NO:
425-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
06.03.24
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PTY. LTD.
PROJECT:
3 POTTERY ST, POMONA QLD 4568
No. DATE REVISIONS BY CKD --- DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 425-001-900 REVISION A A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original