Flood Hazards
PO16 Development is designed AO16.1 Where the development is Not applicable
and sited to ensure risk to people located in the Flood Hazard Area The site is not mapped as
and property from flooding is as shown on Flood Hazard Overlay containing flood hazard areas.
avoided or minimised. Map in Schedule 2, the finished
floor level of habitable rooms is at
least 300 millimetres above the
Defined flood event (DFE).
OR
AO16.2 Where the DFE has not Not applicable
been modelled for the area, the
finished floor level of habitable
rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory
provisions MP3.5 also apply to the
construction of buildings in flood
hazard areas.
Major Electricity
Infrastructure & Substations
PO18 Development is sufficiently AO18.1 Development including Not applicable
separated from major electricity any sensitive land uses is at least: The site is not mapped as
infrastructure and substations to containing major electricity
1. 50 metres from a infrastructure or substations.
minimise the likelihood of
transmission substation;
nuisance or complaint.
2. 10 metres from any other
substation; and
3. 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are Not applicable
not located within an easement for The site is not mapped as
a distribution line. containing major electricity
infrastructure or substations.
PO19 Development is located and AO19 Noise emissions do not Not applicable
designed to avoid or minimise exceed 5db(A) above background The site is not mapped as