Original source · versioned page text
SCG 31131(SWM).RevB - REceived 3.3.22.pdf
Figure 5.2 – Music Modelling Results The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table 5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan drawing no: SCG 31131- SW1.1 thru SW1.5 (Appendix D). 6.0 STORMWATER QUANTITY Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, require post development peak flows leaving the development site will not exceed the pre-development peak flow rates for the required design storms. Peak flow increases will be minimised by the provision of an On-site Detention (OSD) basin fitted with a low flow orifice plate to detain a portion of the runoff from the site and limit the peak flow rates of pre-development levels. SCG Consulting Engineers Page 15 SCG Ref: 31131(SWMP).RevB
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(SWM).RevB - REceived 3.3.22.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.