Council archive · source document
SCG 31131(SWM).RevB - REceived 3.3.22 · MCU21/0156
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
Figure 5.2 – Music Modelling Results The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table 5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan drawing no: SCG 31131- SW1.1 thru SW1.5 (Appendix D). 6.0 STORMWATER QUANTITY Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, require post development peak flows leaving the development site will not exceed the pre-development peak flow rates for the required design storms. Peak flow increases will be minimised by the provision of an On-site Detention (OSD) basin fitted with a low flow orifice plate to detain a portion of the runoff from the site and limit the peak flow rates of pre-development levels. SCG Consulting Engineers Page 15 SCG Ref: 31131(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31131(SWM).RevB - REceived 3.3.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.