6.1.4 Runoff Coefficient (C10)
The 10year runoff coefficients (C10) were calculated as defined in QUDM. Refer to Table 6.2 for
Adopted C10 Values: -
Table 6.2: C10 Values
STATE CATCHMENT A (C10) CATCHMENT B (C10)
Pre Development 0.78 0.74
Post Development 0.88 0.88
6.1.5 Peak Flows
Table 6.3 below displays a summary of major and minor discharge rates for pre and post development
conditions using the rational method. Refer to Appendix E for calculations: -
Table 6.3: Pre and Post Development Peak Flow Rates
Condition Q1 Q2 Q5 Q10 Q20 Q50 Q100
(m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Pre Development 0.010 0.013 0.019 0.024 0.029 0.037 0.042
Catchment A
Post Development 0.028 0.034 0.051 0.063 0.076 0.095 0.105
Catchment A
Pre Development 0.063 0.076 0.114 0.140 0.167 0.210 0.240
Catchment B
Post Development 0.070 0.084 0.128 0.159 0.191 0.241 0.266
Catchment B
Total 0.074 0.089 0.134 0.164 0.195 0.247 0.282
Pre Development
Total 0.098 0.118 0.179 0.222 0.267 0.336 0.370
Post Development
SCG Consulting Engineers Page 17 SCG Ref: 31131(SWMP).RevB
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(SWM).RevB - REceived 3.3.22.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.