catchment B of the proposed development prior to discharging to the lawful point of discharge as
discussed in section 4.2.
Catchment A will result in an increase to stormwater runoff rates to existing flow conditions. Refer to
section 6.4 for the downstream infrastructure considerations.
6.3 Hydraulic Modelling (PC Drains)
Hydraulic modelling has been undertaken using the software package PC DRAINS. We have modelled
the site to establish existing and proposed stormwater drainage characterisitics.
6.3.1 Rainfall Data
Rainfall data accompanied with Initial Loss (IL) and Continuing Loss (CL) was sourced from the
Australian Rainfall and Runoff (ARR) data hub and were imported into the model.
6.3.2 Initial Loss (IL) and Continuing Loss (CL)
Initial Losses (IL) and Continuing Loss (CL) were approximated based on the storm losses from the
ARR Data Hub, Table 6.4 below states the adopted values: -
Table 6.4: Adopted (IL) and (CL) Values
AREAS (IL) (CL)
(mm) (mm/hr)
Impervious 0 0
Pervious 27 2.6
SCG Consulting Engineers Page 19 SCG Ref: 31131(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31131(SWM).RevB - REceived 3.3.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.