Minor Change Existing Approval - MCU22 0154 02 (As Published)
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must
be submitted to Council prior to the issue of a Development Permit for Building Works for
demolition, to secure the demolition conditions of this approval. The cash bond or trading
bank guarantee will be returned on performance of the demolition conditions of this approval
less any costs incurred by Council in respect of enforcing performance of these demolition
conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
29. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP9 - Waste Management and approved by Council’s Waste Coordinator
prior to issue of a development permit for Building Works for demolition, removal, or
relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Note * If a demolition contractor is undertaking works, then the Waste Management table is
to be completed by the demolition contractor.
Damage to infrastructure
30. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Litter, erosion and sediment control
31. All waste materials must be removed from site. Litter, erosion and sediment control
Litter, erosion and sediment control measures must be installed and maintained until soils
are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
system (e.g. roadside gutter).
Page 5 of 8
Document Set ID: 24987071
Version: 3, Version Date: 20/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original