Original source · versioned page text
Updated Plans 30.05.2019 - 64 Gateway Drive Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (20.3 MB): may take a few minutes to open.
101 100 99
N
98
PWD REF
97
94
MEZ LEVEL OVER
95 UNIT 27
61 m²
FFL. 4.000 m
UNIT 31 96
99 m²
FFL. 4.000 m
UNIT 30
MEZ LEVEL OVER
78 m²
FFL. 4.000 m
UNIT 29 UNIT 28
78 m² 77 m²
FFL. 4.000 m FFL. 4.000 m
PWD PWD
REF REF
PWD REF
MEZ LEVEL OVER PWD REF
MEZ LEVEL OVER EMT
POD F - FFL 4.0m
Scale 1 : 100
C GIA Issue - RFI 30-05-2019
B GIA Issue 09-05-2019
A PRELIMINARY ISSUE 19-04-2019
Issue Description Date
Project
NOOSAVILLE SMART
HUB
Client Name
DOUG SIMON
Project Address
64 GATEWAY DRIVE
NOOSAVILLE QLD 4566
Designer (s) Drawn by
Designer Author
Drawing Title
VOID
UNIT 27
POD F - FLOOR PLAN
VOID
UNIT 31
VOID
UNIT 30 - MEZ
72 m²
FFL. 7.400 m
UNIT 29 - MEZ UNIT 28 - MEZ
73 m²
UNIT 31 - MEZ 72 m²
FFL. 7.400 m
51 m² FFL. 7.400 m
FFL. 7.400 m
VOID VOID
POD F - MEZ
Scale 1 : 100
ZEST DESIGN STUDIO
P | 07 5474 1664
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected]
W | www.zestbuildingdesign.com.au
Project Number Sheet Number
POD F 19020 A.205
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
SD C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.