Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment 3 - Stormwater Management Plan

of 23

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Site Catchment Areas for DRAINS Modelling
Project number:    20220116                                         Calculations:                       B. Parry
Street Address:    6 Martin St
Locality:          Peregian Beach, NSC                              Date:                               6/09/2022


Existing Site
                                            Existing Site           Directly connected (m²)             Indirectly connected (m²)
6 Martin St        Roof                                     336.0                               336.0                                  -
                   Impervious Ground                         52.5                                 -                                   52.5
                   Driveway                                 103.9                               103.9                                  -

                   Total Imp                                492.4                               439.9                                 52.5
                   Total Per                                390.4                                 -                                  390.4
                   Site Area                                882.8                               439.9                                 52.5

% impervious                                                        Effective DCIA = 75% DCIA           ICIA +25% ineffective DCIA
                                                                                                329.9                                162.5
                   Impervious                               55.8%                               37.4%                                18.4%
                   Pervious                                 44.2%



Proposed Site



                                            Proposed                Directly connected (m²)             Indirectly connected (m²)
6 Martin St        Roof                                     432.3                               432.3                                  -
                   Impervious Ground                         77.8                                 -                                   77.8
                   Driveway                                  92.3                                92.3

                   Total Imp                                602.4                               524.6                                 77.8
                   Total Per                                280.4                                 -                                  280.4
                   Site Area                                882.8                               524.6                                358.2

% impervious                                                        Effective DCIA = 75% DCIA           ICIA +25% ineffective DCIA
                                                                                                393.5                                209.0
                   Impervious                               68.2%                               44.6%                                23.7%
                   Pervious                                 31.8%
Log in to download the original file

Attachment 3 - Stormwater Management Plan.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.