Attachment 3 - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
DRAINS Modelling Results Project number: 20220116 Calculations: B. Parry Street Address: 6 Martin St Locality: Peregian Beach, NSC Date: 6/09/2022 Pre / Post Comparison A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 1 EY 0.024 0.027 0.003 13% 50% AEP 0.029 0.029 0.000 0% 0.2 EY 0.044 0.045 0.001 2% 10% AEP 0.053 0.053 0.000 0% 5% AEP 0.061 0.061 0.000 0% 2% AEP 0.070 0.071 0.001 1% 1% AEP 0.078 0.078 0.000 0%