Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment 3 - Stormwater Management Plan

of 23

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 INTRODUCTION
RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for a residential duplex development located at U2 6 Martin Street, Peregian Beach.

This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council
requirements for stormwater drainage.




Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                Page 4 of 14
Revision 1


P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads, Qld 4567         E [email protected]    recorconsulting.com
Log in to download the original file

Attachment 3 - Stormwater Management Plan.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.