Attachment 3 - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Figure 3.2 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.024 0.027 0.003 13%
50% 0.029 0.029 0.000 0%
0.2 EY 0.044 0.045 0.001 2%
10% 0.053 0.053 0.000 0%
5% 0.061 0.061 0.000 0%
2% 0.070 0.071 0.001 1%
1% 0.078 0.078 0.000 0%
The site has only resulting in minor increases to peak run-off for less than half of the modelled storm events. With the
increase being a maximum of 3L/s, the impact to downstream drainage conditions will be insignificant and unlikely
to result in damage or nuisance to downstream properties and infrastructure. Attenuation is therefore not required
for the proposed development.
Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27 Page 8 of 14
Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.