Attachment 3 - Stormwater Management Plan

of 23

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                           Figure 3.2 – DRAINS Post-development catchments


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                      Wyandra Street
                                                                                                      Qchange
                                           A.E.P               Qexisting    Qproposed    Qchange       (%)
                                                               (m³/s)       (m³/s)       (m³/s)
                                             1EY                0.024        0.027        0.003        13%
                                            50%                 0.029        0.029       0.000          0%
                                           0.2 EY               0.044        0.045       0.001          2%
                                            10%                 0.053        0.053       0.000          0%
                                             5%                 0.061        0.061       0.000          0%
                                             2%                 0.070        0.071       0.001          1%
                                             1%                 0.078        0.078       0.000          0%



The site has only resulting in minor increases to peak run-off for less than half of the modelled storm events. With the
increase being a maximum of 3L/s, the impact to downstream drainage conditions will be insignificant and unlikely
to result in damage or nuisance to downstream properties and infrastructure. Attenuation is therefore not required
for the proposed development.




Project number 20220116
File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                   Page 8 of 14
Revision 1


P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads, Qld 4567            E [email protected]    recorconsulting.com
Log in to download the original file

Attachment 3 - Stormwater Management Plan.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.