          Engineering Submission

    Development Application for
         Material Change of Use

Residential and Retirement Village
                Aged Care Facility

      Trading Post Road, Cooroy

                                           RSL Care

                                     N07058CER01
                                 15 November 2007



    BROWN CONSULTING (QLD) PTY LTD
              Consulting Engineers & Managers
                                                  ABN 38 109 428 506
                  Telephone (07) 5477 6469 Facsimile (07) 5477 6486
              Level 1 / 15 Nicklin Way, PO Box 997, Buddina QLD 4575
                         E-mail [email protected]
                                  Website www.brownconsulting.com.au
Full text of the other 26 pages

Page 2

                                        TABLE OF CONTENTS



1.   INTRODUCTION .......................................................................................................... 1


2.   EARTHWORKS ........................................................................................................... 1


3.   STORMWATER DRAINAGE ....................................................................................... 1


4.   SEWERAGE RETICULATION ..................................................................................... 1


5.   WATER RETICULATION ............................................................................................. 1


6.   CONCLUSION ............................................................................................................. 2


7.   THE CODES................................................................................................................. 3


      DIVISION 13: DRIVEWAYS AND CARPARKING CODE ...................................................... 3
      DIVISION 14: EARTHWORKS ............................................................................................... 9
      DIVISION 15: SEDIMENT AND EROSION CONTROL ....................................................... 12
      DIVISION 16: EXISTING SERVICES CODE ....................................................................... 14
      DIVISION 18: TRANSPORTS, ROADS AND DRAINAGE CODE........................................ 15
      DIVISION 19: WATER SENSITIVE DESIGN CODE ............................................................ 21
      DIVISION 20: WATER SUPPLY AND SEWERAGE RETICULATION CODE ..................... 23

Page 3

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




1.      INTRODUCTION

The project comprises the development of a Residential Aged Care Facility and a Retirement
Village for RSL Care at Cooroy.

The development is made up of independent living units and aged care facilities. The main
entrance to the development is off Trading Post Road. The proposal also features a village centre
and two water bodies that will act as stormwater treatment devices. From an engineering
perspective, generally the development can be serviced by the existing infrastructure with little or
no upgrade requirements.

In light of this fact, we see no reason why the development should not be approved on engineering
grounds.


2.      EARTHWORKS

The earthworks will be limited to that required for roadworks, allotment access and the installation
of services. The allotments will be left as close as possible to existing surface levels to preserve
the existing vegetation and minimise disturbance to the site.


3.      STORMWATER DRAINAGE

Stormwater will discharge into the existing gullies in accordance with the proposed Site Based
Stormwater Management Plan. Detention storage and quality objectives will be satisfied via the
treatment measures set out in the management plan.


4.      SEWERAGE RETICULATION

This site is within an area currently sewered by Council. Sewerage to the site will be via a
connection in Pearson Road. The 150mm diameter line runs along the northern side of Pearson
Road and terminates on the eastern corner of the subject site.

The development will require a pump station. The most likely location will be in the north east
corner of the site. Confirmation of the final location will be addressed in the operational works
design.

The location of the connection points are shown on the attached drawing N07058-DA10.


5.      WATER RETICULATION

Water reticulation for the site is a 150mm diameter main that terminates approximately 30 metres
into Trading Post Road.

The location of the connection points are shown on the attached drawing N07058-DA11.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   1

Page 4

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



6.      CONCLUSION

This report is based on Council as constructed information and discussions with Council. In
addition, a network analysis has been undertaken by JWP. The analysis concludes by advising
that both the existing sewer and water systems have capacity to facilitate the development.

The following codes and probable solutions primarily relate to matters which would ordinarily be
addressed as part of the detailed design phase for operational works approval. However the
matters have been reviewed as part of the preliminary design considerations during the master
planning for the site to ensure that all relevant measures can be satisfied in accordance with good
engineering practices and the design standards otherwise expressed within the codes.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   2

Page 5

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




7.      THE CODES
DIVISION 13: DRIVEWAYS AND CARPARKING CODE

Table 14-45 Driveways

14.130 General


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O1 Vehicular access does not           S1.1 Vehicular access is located       The main access to the site is via
adversely impact on safety,            and designed in accordance with        Trading Post Road. A secondary
capacity and operations of the         AUSTROADS – Guide to Traffic           access is proposed off Lamonts
existing or planned road               Engineering Practice                   Road to service the aged care
network, the proposed                  requirements for sight distance        facility. Both accesses have been
driveway, cycle paths or               and Section 3 of AS2890.1              assessed by McCormack Rankin
pedestrian pathway systems.            Parking Facilities;                    & Cagney in accordance with
                                                                              Austroads guide to traffic
                                       AND
                                                                              engineering practice requirements
                                                                              for sight distance. Parking
                                                                              provisions have been designed in
                                                                              accordance with Section 3 of
                                                                              AS2890.1 Parking Facilities.

                                       S1.2 Only one footpath crossing is     Internal and external footpath
                                       provided;                              details are shown on the Master
                                                                              Plan for the site.
                                       AND

                                       S1.3 Driveways, other than within      Preliminary road design of the
                                       any setback have a maximum             proposal suggests that driveways
                                       grade in accordance with Section       will have maximum grades in
                                       3 of AS/NZS 2890.1.                    accordance with Section 3 of
                                                                              AS/NZS 2890.1.

O2 Driveways and Crossovers –          S2.1 Design of the driveway            Preliminary road design of the
                                       across the footpath is in              proposal was undertaken to
(a) are suitable and safe for
                                       accordance with Council’s              consider the following:
    their intended use; and
                                       Standard Drawings 9002 or 9005
                                                                              The abovementioned preliminary
(b) match Council                      as appropriate for he particular
                                                                              design suggests that driveways
    infrastructure.                    type of development as annotated
                                                                              traversing footpaths will be in
                                       on the drawings;
                                                                              accordance with Council’s
                                       AND                                    requirements and;

                                       S2.2 Driveways are designed and        Driveways can and will be
                                       constructed in accordance with         constructed in accordance with
                                       Council Standard Drawings 9014,        Council’s standard drawings; and
                                       9019, 9020, 9021, as appropriate
                                       for the particular type of
                                       development as annotated on the
                                       drawings;
                                       AND

                                       S2.3 The change in grades in the       Changes in grades will comply
                                       driveways and ramps is in              with Section 3 of AS2890.1
                                       accordance with Section 3 of           Parking Facilities.
                                       AS2890.1 Parking Facilities.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   3

Page 6

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O3 In commercial zoned areas,          S3.1 Design of multi-tenanted          Not Applicable
the number of driveways                developments in commercial
across pedestrian footpaths is         zoned areas include shared
minimised.                             driveways and parking areas;
                                       AND

                                       S3.2 Driveways are located so
                                       they abut existing driveways or
                                       adjoining development where
                                       practicable and reciprocal
                                       easements are created to reduce
                                       the sealed driveway width.

O4 Vehicular access does not           S4.1 Footpath and kerb crossings       All vehicular access will take into
adversely impact on the                are located clear of existing          consideration associated
capacity, operations and               stormwater inlet structures, water     infrastructure and landscape
maintenance of the existing            and sewerage infrastructure            during the detailed design
infrastructure;                        fittings, any other exiting utility    process.
                                       infrastructure, existing
AND
                                       landscaping and vegetation.

O5 Vehicular access does not           S5.1 No solution provided.
adversely impact on the
integrity of existing
landscaping or native
vegetation.

O6 Driveway run-off is filtered        S6.1 For:                              The application includes a
prior to leaving the premises.                                                stormwater management plan for
                                       (a) Ancillary dwelling unit,
                                                                              quality, quantity and re-use.
                                           Multiple Housing Types 1 or
                                           2 if less than 5 carparking
                                           spaces, Visitor
                                           accommodation Type 1 and
                                           Home based business – the
                                           driveway is formed to drain to
                                           landscaped areas; and
                                       (b) For other uses – grease and
                                           oil arrestors or stormwater
                                           quality improvement devices
                                           are incorporated into the
                                           design to treat run-off prior to
                                           run-off exiting from the
                                           premises.


14.131 Service Stations
Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O7      The layout of the site         S7.1 Where the site is situated at     Not applicable
facilities    and     vehicular        the intersection of two roads,
accesses result in unrestricted        separate entrances and exits are
vehicle access and egress to           provided to one or more of the
the site.                              adjoining roads.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE    4

Page 7

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O8    The use of land for a            S8.1 Any vehicular crossing over       Not Applicable
services station:                      a footpath is:
(a) does not impair traffic flow       (a) not less than 8m in width;
    or road safety;                        and
(b) through the design and             (b) located so the crossing is not
    arrangement of vehicular               less than 14m from any other
    crossovers, facilitates safe           vehicular crossing on the
    and convenient movement                same site; and
    to and from the site; and
                                       (c) not less than 12m from any
(c) provides adequate, safe                road intersection.
    and    functional on-site
    parking and manoeuvring
    areas.


Table 14-46 Carparking and Manoeuvring

14.132 Carpark Design and Layout


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O9 Sufficient carparking is            S9.1 The number of parking and         The number of carparking bays
provided to accommodate the            loading bays is not less than the      within the site is generally in
number and type of vehicles            minimum number specified in            accordance with the number
likely to be generated by the          Table 14-47 Vehicle Parking            specified in Table 14-47 vehicle
development having regard to           Requirements;                          parking requirements.
the specifics of the use
                                       OR                                     All units will have a garage with
including:
                                                                              allowance for tandem visitor
(a) the type and intensity of                                                 parking in all but a few cases.
    land use;                                                                 The apartments allow for one
                                                                              space per unit plus one space per
(b) any existing parking
                                                                              4 units for visitor parking.
    available on the site;
                                                                              Parking at the aged care facility
(c) hours of operation;
                                                                              will allow for the anticipated staff
(d) likely numbers of users;                                                  numbers and visitors to the
                                                                              facility. Provision will be made for
(e) the peak parking demand                                                   visiting medical staff and parking
    periods of uses on the site;                                              will be provided for an ambulance.
    and
(f)   the availability of              S9.2 If insufficient carparking
      alternative carparking.          spaces are provided, on-site
                                       monetary contribution is made to
                                       Council in accordance with
                                       Section 6 of PSP13 Contributions
                                       in lieu of provision of off-street
                                       carparking.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   5

Page 8

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
O10 The layout of the                  S10.1 Parking bays,                     Parking is distributed clearly
development provides                   manoeuvring areas, queuing              throughout the site in accordance
adequate, clearing defined and         areas, loading setdown and              with the relevant codes.
easily accessible:                     pickup areas and driveways are
                                       designed to the standards set out
(a)     on-site vehicle parking
                                       in Sections 2 and 3 of Australian
        and manoeuvring areas;
                                       Standard AS2890.1 Parking
        and
                                       Facilities (Part 1: Off-street
(b)     loading and                    Carparking) and AS2890.2 – Off
        manoeuvring areas for          Street Parking (Part 2:
        delivery and service           Commercial Vehicles);
        vehicles.
                                       AND

                                       S10.2 The number of loading             Parking and turning areas will be
                                       bays is not less than the minimum       provided within the service yard
                                       number specified in Table 14-47.        for service vehicles required by
                                                                               the development.

O11 Parking areas are located          S11.1 Carparking areas are              Pedestrian access through the
where they will not unduly             accessed from rear laneways             site is separated from
conflict with pedestrians and          where practicable.                      intersections and other points of
will not dominate the                                                          conflict to ensure safe passage.
streetscape.

O12 Provision is made for a            S12.1 Carparking spaces are             Parking for people with disabilities
reasonable number of on site           provided for people with                has been catered for in
carparking spaces identified           disabilities at the rate specified in   accordance with the relevant
and reserved for people with           Section 2.4.5 of AS2890.1 –             code.
disabilities.                          Parking Facilities (Part 1: Off
                                       Street Carparking).

O13 Access and egress points           S13.1 Vehicle manoeuvring               A traffic assessment has been
to not impact on the safety and        areas are provided in accordance        undertaken to ensure access and
operations of the road system.         with Section 3 of AS2890.1              egress points are safe.
                                       Parking Facilities (Part 1: Off
                                       Street Carparking) so vehicles
                                       enter and leave the site in a
                                       forward gear.

O14 Development with the               No solution provided.                   A traffic assessment has been
potential to generate significant                                              undertaken to ensure access and
traffic and parking impacts                                                    egress points are safe.
gives appropriate consideration
to transport and land use
issues.

O15 Business Uses and                  S15.1 Safe and convenient cycle         Not Applicable.
Community Uses are designed            access to and from the site form
and constructed to encourage           the existing road and bicycle
users of the development to            network, and safe bicycle
access the site by means of            movement within the site is
foot or bicycle through                provided.
provision of appropriate end of
                                       AND
trip facilities including bicycle
parking and shower/change
rooms.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   6

Page 9

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
                                       S15.2 Secure and convenience
                                       parking space for bicycles is
                                       provided on site in accordance
                                       with Table 14-48 Minimum
                                       requirements for bicycle parking
                                       and AS2890.3 Bicycle Parking
                                       Facilities;
                                       AND

                                       S15.3 Where are least 10 bicycle
                                       car parking spaces are required in
                                       accordance with Table 14-48, end
                                       of trip cycle facilities are provided
                                       at the following rate:
                                       (a)     1 locker per 2 bicycle
                                               parking spaces; and
                                       (b)     1 shower cubicle with
                                               ancillary change rooms
                                               per 10 bicycle spaces or
                                               part thereof, providing
                                               facilities are either unisex
                                               or both male and female
                                               facilities are provided.
                                       AND
                                       15.4 Bicycle parking spaces and
                                            cyclist facilities are designed
                                            in accordance with
                                            AUSTROADS Guide to
                                            Traffic Engineering Practice,
                                            Part 14 – Bicycles, Section
                                            10.

                                       AND
                                       15.5 On-site pedestrian facilities
                                       such as seating and shade are
                                       provided in developments for the
                                       convenience of persons walking
                                       to the site.

O16 Carparks are designed to           S16.1 Grease and oil arrestors or       A stormwater management plan
ensure run-off is treated to           stormwater quality improvement          has been prepared for the site. It
remove pollutants prior to             devices are incorporated into the       considers the treatment of runoff
leaving the premises.                  design to treat rum-off prior to        from carparking areas. Refer to
                                       leaving the premises.                   Brown Consulting’s report dated
                                                                               October 2007.

O17 Carparking areas are               S17.1 No solution provided.             There is sufficient fall and an
designed to ensure drainage                                                    appropriate stormwater network
without the use of pumps or                                                    system will be designed without
other electrical apparatus.                                                    the requirement for pumps or
                                                                               other electrical apparatus to all
                                                                               carparking areas.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE    7

Page 10

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O18 Site layout and building           S18.1 Below ground components          The site layout allows for soft
design provides for soft               of building, including carparks, do    landscaping to be established.
landscaping to be established.         not extend beyond the above            Refer to Landgraphic’s plans for
                                       ground footprint to allow for the      further details.
                                       provision of landscaping
                                       particularly within building
                                       setbacks.

O19 Carparking and setdown             S19.1 Paved setdown areas are          Carparking and setdown areas
areas are designed and located         provided within the site;              will ensure safe and efficient
to facilitate their safe and                                                  access to individual living units
                                       AND
efficient use.                                                                and associated facilities.

                                       19.2 For a minimum of 50% of           Refer to Master Plan – most
                                       carparking spaces, pedestrian          parking areas are adjoined by a
                                       access to buildings is not across      pathway that connects to the
                                       or through driveways, carparks         relevant facility or links to the
                                       setdown or manoeuvring areas;          main pedestrian pathway network
                                                                              within the site.
                                       AND

                                       19.3 Carparking and setdown            The site has limited access with
                                       areas are visible from off-site.       the external road network.
                                                                              Facilities internalised within the
                                                                              site are well catered for. Visitor
                                                                              parking areas will be well
                                                                              signposted and readily visible
                                                                              upon entry to the relevant part of
                                                                              the site.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   8

Page 11

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 14: EARTHWORKS

Table 14-49 Earthworks

                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                             Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
14.138 Effects of Works
Drainage:
O1    Finished surface levels          S1.1 The finished surface gradient      Preliminary design indicates that
ensure land is free draining.          of any filled or excavated area is      finished surface levels will be in
                                       within the range 0.5% to 1.5% and       accordance with required grade
                                       drains to Council’s stormwater          range.
                                       infrastructure where available or
                                       where stormwater infrastructure is
                                       not available, toward the street.
Hydraulics:
O2 Any change to the level of          No solution provided.                   Flood     impact     has    been
land does not have an adverse                                                  considered and will not have any
flooding impact on the flooding                                                negative impacts on the site.
and drainage characteristics                                                   Refer to Brown Consulting’s
off-site.                                                                      report dated October 2007.

Geotechnical Considerations
O3 Earthworks do not result in         For Assessable Development:             All earthworks will be undertaken
geotechnical instability on the        S3.1 Filling works are undertaken       in accordance with the relevant
premises or nearby premises.           in accordance with Section 28 –         standards to ensure geological
                                       Filling of Site of Council’s PSP5 –     stability to the subject site and
                                       Engineering Design Standards –          adjoining sites.
                                       Roads       and     Drainage    and
                                       Earthworks.
                                       AND
                                       S3.2     Where the filling is for
                                       residential     commercial     or
                                       industrial purposes the works
                                       comply with Sections 3 to 6 of
                                       AS3798       –    Guidelines  for
                                       earthworks on commercial and
                                       residential development.
Local Amenity
O4 Earthworks do not cause             S4.1     The     following    control   The earthworks will be conducted
disturbance to the amenity of          measures are implemented:               with   due     consideration  to
the neighbouring land.                 (a) Regular water spraying of           suppression of dust.
                                            exposed areas to suppress
                                            dust;
                                       (b) Provision of dust stabilised or
                                            sealed internal roads;
                                       (c) Protective        covering     of
                                            exposed areas that are left
                                            for more than 2 weeks; and
                                       If there is no valid development
                                       permit for the site, disturbed areas
                                       are revegetated using species
                                       identified in PSP3 – Landscaping
                                       Plants and Guidelines.
                                       AND



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   9

Page 12

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST


                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                             Proposed Measures
                                       Probable Solutions
                                       (if code assessable)

                                       S4.2 Earthworks are undertaken          All works will be conducted within
                                       only during the hours of 7am to         the designated timeframes.
                                       6pm, Monday to Friday and 7am
                                       to 6pm on Saturday. No work is
                                       undertaken on Sunday or public
                                       holidays.
Vegetative Waste
O5 Vegetation cleared from a           S5.1      Cleared vegetation is         Vegetation will be used or
development site is disposed of        transported off-site for disposal in    disposed of in an environmentally
in     an      environmentally         an approved green waste disposal        responsible manner.
responsible manner.                    facility;
                                       OR
                                       S5.2     Cleared vegetation is
                                       mulched onsite and reused for
                                       landscaping of the finished
                                       development;
                                       OR
                                       S5.3      Cleared vegetation is
                                       disposed of for the purpose of
                                       firewood.
Managing Contamination Risk
O6 Materials used as fill are          S6.1 The fill material is sold clean    It is proposed to aim for balanced
suitable for development of the        earth, free of putrescible or refuse    earthworks      within   the    site.
land and filling or excavation         material, vegetation, acid sulfate      However, if fill material is
works do not result in the             soils, building or construction         required, it will be investigated by
contamination of land.                 material or other material of           geotechnical engineer to ensure
                                       contaminants.                           that it is satisfactory prior to
                                       OR                                      placement.
                                       S6.2   The site is not on the
                                       contaminated land register.
Haulage Activity & Amenity
O7 Haulage of material to and          No solution provided.                   Refer to O6 above - Haulage will
from a site ensures:                                                           be     undertaken       with due
(a) minimal disturbance to                                                     consideration to residents and
    neighbouring     properties                                                Council’s infrastructure.
    and properties along the
    haulage route; and
(b) Council’s              road
    infrastructure    including
    pavements is not adversely
    affected.
Extent of Earthworks
O8 Earthworks are contained            S8.1 All earthworks, including cut      Cut and fill batters will be
within the site.                       and fill batters, retaining walls etc   contained   within  the   site
                                       are contained within the subject        boundaries.
                                       site.

Environmental Protection
O9 Earthworks minimise any             No solution provided.                   Earthworks will be minimised to
adverse       impact      upon                                                 limit the impact on groundwater
groundwater,       watercourse,                                                and watercourses.
drainage lines, wetlands, and
native vegetation.



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   10

Page 13

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST


                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                            Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
Dams
O10        Dam location and            No solution provided.                  Existing dams on site will be
construction does not impact                                                  improved through re-shaping and
upon neighbouring properties                                                  landscaping works as part of the
in terms of:                                                                  stormwater     treatment    train
(a) hydrology;                                                                solution. Refer to Brown Report
(b) alteration    of    existing                                              Oct 2007.
     overland flowpaths and
     patterns;
(c) landslide or failure of dam
     wall; and
(d) effluent disposal areas.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   11

Page 14

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 15: SEDIMENT AND EROSION CONTROL

Table 14-50 Erosion and Sediment Control

                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                            Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
14.143 Effects of Works
Erosion and Sediment Control
O1    Development minimises            S1.1 Site disturbance is limited to    Sediment and erosion control
erosion   and     transport of         building areas, their surround and     plans will be generated as part of
sediments off-site.                    other use areas;                       the operational works (civil)
                                       AND                                    design drawings to address all
                                                                              aspects of erosion control.
                                       S1.2 Sediment barriers are             Preliminary consideration of these
                                       provided        throughout and         measures are demonstrated on
                                       downslope of disturbed areas to        Brown Consulting Plans, drawings
                                       prevent sediment washing into          N07058 Sheets DA05 and DA06.
                                       gutters, drains and watercourse
                                       either on or off the site.
                                       AND
                                       S1.3 All stockpiles including sand,
                                       soil or building materials are
                                       within    the     premises      and
                                       contained     within      individual
                                       sediment barriers;
                                       AND
                                       S1.4       Sediment basins are
                                       provided where the site contains
                                       fine or dispersive soils;
                                       OR
                                       S1.5      A stormwater catchpit
                                       incorporating    a     stormwater
                                       catchpit protection device is
                                       installed so that all runoff from
                                       disturbed areas flows to the
                                       catchpit;
                                       AND
                                       S1.6 For buildings:
                                       (a) Temporary or permanent
                                           downpipes are connected to
                                           the stormwater system before
                                           laying the roof; OR
                                       (b) Localised erosion is avoided
                                           by    directing   flow  from
                                           downpipes over non-erosive
                                           areas.
Stormwater Runoff
O2    Stormwater is diverted           S2.1 Diversion drains or bunds         Part of the sediment and erosion
around disturbed areas.                are designed and constructed to        control mentioned above may
                                       drain upstream runoff around the       require    the     diversion    of
                                       disturbed site;                        stormwater     around    disturbed
                                       AND                                    areas.
                                       S2.2      Discharge from the
                                       diversion drains do not cause
                                       runoff impacts to other properties;



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   12

Page 15

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST


                                       Acceptable Solutions (if self-
Specific Outcomes                      assessable)                            Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
                                       OR

                                       S2.3 Alternative methods, as
                                       described in the Institution of
                                       Engineer’s Australia (Queensland
                                       Division)  Soil    Erosion   and
                                       Sediment Control – Guidelines for
                                       Queensland Construction Sites,
                                       are used.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   13

Page 16

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 16: EXISTING SERVICES CODE

Table 14-51 Existing Services


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
Setbacks and Easements
O1 Development near a sewer,           S1.1 The footing of any structure      Due      consideration   for  all
water main, stormwater drain,          or building is located clear of the    infrastructure and existing flow
overland     flow     path    or       zone of influence but no closer        paths will occur throughout the
associated structure does not:         than 15.m (measured horizontally)      detailed design process.
(a) adversely      affect    the       from     infrastructure   including
    function of the service;           sewers,      water    mains    and
(b) place an additional load on        stormwater structures;
    the service; and                   AND
(c) unduly increase future             S1.2 No building of structure
    maintenance costs.                 overhangs the zone of influence;
                                       AND
                                       S1.3     Finished surface levels
                                       maintain a minimum of 600mm of
                                       cover, but not greater than 3m of
                                       cover     to    the  underground
                                       infrastructure;
                                       AND
                                       S1.4 If the existing surface level
                                       is altered, surface level services
                                       including      manholes       and
                                       inspection points are altered to
                                       match the new surface level;
                                       AND
                                       S1.5 Alterations are constructed
                                       in accordance with Sections 3, 4
                                       and 5 of PSP6 – Engineering
                                       Design Standards –Water and
                                       Sewerage and Section 4 of
                                       PSPs5 – Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks;
                                       OR
                                       S1.6      Existing services are
                                       relocated and the design and
                                       construction of the relocated
                                       services is in accordance with
                                       Sections 3, 4 and 5 of PSP 6 –
                                       Engineering Design Standards –
                                       Water and Sewerage and Section
                                       4 of PSP 5 – Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks.
O2     Maintenance access is           S2.1 A registered easement in          Due consideration will be given to
provided to all sewers, water          favour of Council is created over      the requirements of access for
mains,    stormwater     drains,       all underground infrastructure         future maintenance throughout
overland    flow   paths    and        located in private property;           the detailed design process.
associated structures.                 AND
                                       S2.2 The width of the easement
                                       is in the greater of 3m or the width
                                       of the zone of influence;
                                       AND



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   14

Page 17

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
                                       S2.3 The easement is centred
                                       over the centreline of the
                                       infrastructure.



DIVISION 18: TRANSPORTS, ROADS AND DRAINAGE CODE

Table 14-55 Strategic Transport Network


Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
14.163  Strategic        Transport
Network
O1 Traffic generation from the         S1.1     Where the development          A        traffic     management
development is considered in a         leads to the need to increase           investigation has been undertaken
localised and a Shire wide             transport infrastructure in the         by others.       Please refer to
context to ensure that:                Shire,       the      development       associated report.
(a) the transport network has          contributes to the transport
    the capacity to safely and         network in accordance with the
    efficiently   accommodate          requirements of Infrastructure
    projected       movements;         Charges Plans (ICP); and where
    and/or                             developments              requires
(b) the development includes           infrastructure not included in the
    measure to upgrade the             ICP, the development upgrades
    transport network to meet          the infrastructure at no cost to
    the imposed demands.               Council.

O2 Development is designed             No solution provided.                   Aged care facilities and retirement
and located to avoid excessive                                                 villages are low traffic generating
travel for users.                                                              developments.        The site is
                                                                               proximate to facilities within the
                                                                               Cooroy Town Centre. RSL Care
                                                                               will also provide a bus service
                                                                               from the site to take residents to
                                                                               nearby venues.
O3 Development is designed:            S3.1 Facilities for boarding and        The development has a network
(a) to encourage travel by             exiting   community         transport   of pedestrian paths within the site
    community        transport,        services    and     facilities   are    that link to external pathways. As
    walking and cycling rather         incorporated into developments.         noted above, RSL Care will
    than by car; and                                                           provide a bus service for
(b) to maximise accessibility                                                  residents.
    via existing and planned
    community         transport
    facilities.
O4 Development access does             No solution provided.                   A        traffic     management
not compromise the functions                                                   investigation has been undertaken
of particular roads as indicated                                               by others.       Please refer to
in Noosa Shire hierarchy, and                                                  associated report.
does not adversely impact on
the    safety,   capacity   and
operations of the road system.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   15

Page 18

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST


Table 14-56 Roads and Drainage


Specific Outcomes                        Probable Solutions                   Proposed Measures
                                         (if code assessable)
14.164   Road and drainage
design and construction.
O5 Roads and pedestrian and              S5.1 Road planning and design        A        traffic     management
cycle paths are planned and              supports the hierarchy and           investigation has been undertaken
designed      to     support      the    functional aspects identified in     by others.       Please refer to
hierarchy       and       functional     Sections 2 and 3 of PSP5             associated report.
aspects identified in Sections 2         Engineering Design Standards –       All roads will be designed in
and 3 of PSP5 Engineering                Roads, Drainage and Earthworks;      accordance with relevant Council
Design Standards – Roads,                AND                                  policies       and     engineering
Drainage and Earthworks and                                                   guidelines.
to ensure that:
                                         S5.2 Road and pathway planning
(a) design and alignment of
                                         and design is in accordance with,
     the roads, intersections
                                         in order of precedence:
     and all associated works:
     i.   provides        a      safe
          environment for all               (a)     Noosa       Integrated
          users;                                    Local Transport Plan;
     ii. is adequate for the                (b)     Queensland
          design              speed                 Transport’s Shaping
          environment;                              Up;
     iii. is      adequate        for       (c)     Queensland Design
          predicted            traffic              Code for Residential
          volumes; and                              Streets;
     iv. maintains the safe and             (d)     AUSTROADS Guide
          efficient functioning of                  to Traffic Engineering
          the     road      network                 Practice;
          without the use of                (e)     Sections 2 and 3 of
          traffic signals;                          PSPS 5 Engineering
     v. is compatible with                          Design Standards –
          existing roads;                           Roads,       Drainage,
     vi. is easily maintained by                    Earthworks; or
          Council       equipment;          (f)     The Noosa Cycling
          and                                       and Walking Network
     vii. where appropriate, has                    Development      Plan;
          the        ability        to              or
          accommodate public                (g)     A combination of the
          transport services.                       principles in these
(b) Road pavement surfaces:                         documents.
     i.   are durable enough to             AND
          carry estimated wheel
                                         S5.3 On road cycling treatment is
          loads of travelling and
                                         utilised to provide safe and
          parked vehicles;
                                         continuous movement of cyclist
     ii. provide for the safe            along a roadway, such as:
          passage of vehicles;
                                         (a) sealed shoulders;
          pedestrians,        cyclist
          and      discharge        of   (b) wide kerbside lane;
          stormwater          runoff     (c) exclusive or peak period
          from         contributing            bicycle lane;
          catchments and the             (d) advisory treatments such as
          preservation of all                  Bicycle Awareness Zone;
          weather access;                (e) shared parking/bicycle lane;
(c) kerb and channel:                    (f) contra flow bicycle lane; and
     i.   controls           vehicle     (g) bus/bicycle lane.
          movement                 by




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   16

Page 19

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                      Proposed Measures
                                       (if code assessable)
         delineating         the       S5.4 The provision of bicycle
         carriageway for all           lanes at intersections is generally
         users;                        in accordance with AUSTROADS
    ii. conveys             road       Part 14, Section 5 and the Manual
         pavement runoff to            of     Urban    Traffic    Devices
         stormwater drainage in        (MUTCD) Part 9.
         a manner that allows
         the     road    to    be
         trafficable in Q100 ARI
         local rainfall events;
         and
(d) verges and footpaths;
    i.   safe      access     for
         pedestrians         and
         cyclists     clear    of
         obstructions;
    ii. an access area        for
         vehicles           onto
         properties;
    iii. a corridor allocated for
         services and utilities;
         and
    iv. additional amenity for
         minor roads.
O6        Stormwater drainage          S6.1       Stormwater drainage          Stormwater drainage will be
infrastructure     is     planned,     planning, design and construction       designed in accordance with
designed and constructed to:           is in accordance with Section 4 of      Council requirements and with
(a) be       accessible,      cost     PSP 5 Engineering Design                consideration to the stormwater
     effective     and       easily    Standards – Roads, Drainage and         management plan.
     maintained.                       Earthworks;
(b) Protect           downstream       AND
     capacity;
                                       S6.2    As constructed data is
(c) Protect downstream water
                                       submitted in accordance with
     quality;
                                       Section 6 of PSP 5 Engineering
(d) Maximise                onsite     Design Standards – Roads,
     stormwater retention and          Drainage and Earthworks;
     retardation; and
                                       AND
(e) Convey          runoff       to
     stormwater drainage in a          S6.3       Stormwater drainage
     manner that allows roads          planning, design and construction
     to be trafficable in Q100         is in accordance with the
     ARI local rainfall events.        Queensland     Urban   Drainage
                                       Design Manual.
O7     Road and stormwater             S7.1      Road and stormwater           Roads and the stormwater
drainage     infrastructure    is      drainage       infrastructure      is   networks will be designed in
constructed:                           constructed in accordance with:         accordance     with   Council
(a) in     accordance       with       (a) Sections 2,3 and 4 of PSP5          requirements.
    appropriate      engineering            Engineering              Design
    standards; and                          Standards – Roads, Drainage
(b) to    minimise       adverse            and Earthworks;
    environmental       impacts,       (b) Queensland Design Code for
    including from runoff and               Residential Streets;
    erosion.                           (c) AUSTROADS; or
                                       (d) A      combination     of    the
                                            principles       of       these
                                            documents.
                                       AND




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   17

Page 20

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                       Proposed Measures
                                       (if code assessable)
                                       S7.2      Erosion and sediment
                                       control measures are designed
                                       and implemented in accordance
                                       with the Institution of Engineers
                                       Australia (Qld Division) Soil
                                       Erosion and Sediment Control –
                                       Guidelines      for   Queensland
                                       Construction Sites.
Environmental Protection
O8     Roads and stormwater            S8.1 Roads and stormwater                Consideration will be given to all
drainage     infrastructure    are     drainage follow the edge of              environmental factors throughout
located and aligned so as to:          existing disturbed areas; or             the detailed design phase.
(a) minimise disturbance to            alternatively, these works are co-
    native vegetation and/or           located within a combined utility
    other habitat areas;               corridor;
(b) protect      and     maintain      AND
    wildlife              corridor
    movements and the safety
    of native fauna;
(c) minimise changes to the
    hydrological          regime,
    including            drainage
    patterns, runoff and water
    quality;
(d) avoid                crossing
    watercourses,        drainage
                                       S8.2      Roads avoid native
    lines and wetlands, but
                                       vegetation and provide for fauna
    where such crossings are
                                       underpasses    and     associated
    unavoidable,        disturbed
                                       fencing where appropriate;
    areas are reinstated and
    revegetated on completion          AND
    of works; and                      S8.3 Road infrastructure within or
(e) minimise bulk earthworks.          adjacent    to    native   habitat
                                       incorporates fences which allow
                                       for protected wildlife movement
                                       and controls unrestricted access
                                       of domestic cats and dogs;
                                       AND
                                       S8.4       Native vegetation is
                                       protected    from      clearing    or
                                       construction activities by:
                                           (a)     clearly          marking
                                                   vegetation       to    be
                                                   retained with flagging
                                                   tape;
                                           (b)     installing     protective
                                                   fencing around the
                                                   dripline of vegetation;
                                                   and
                                           (c)     ensuring stock piling,
                                                   storage and vehicle
                                                   parking occur outside
                                                   the        areas        of
                                                   vegetation       to    be
                                                   retained;
                                       AND




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   18

Page 21

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                       Proposed Measures
                                       (if code assessable)
                                       S8.5     Low impact construction
                                       techniques are used around areas
                                       of vegetation to be retained to
                                       minimise interference with the
                                       vegetation.
O9     Roads and stormwater            No solution provided.                    Constructed road and drainage
drainage    infrastructure     is                                               infrastructure will satisfy Council’s
proven to be suitable for its use                                               requirements prior to hand over.
prior to Council accepting the
dedicated asset.
O10 Alignment of stormwater            S10.1 The location, design and           Infrastructure will be located for
drainage infrastructure is to          construction     of     stormwater       ease of maintenance, easements
allow for easy access for the          drainage     structures     is  in       will    be    established   where
ongoing     maintenance    by          accordance with Sections 4 and 5         required.
Council.                               of PSP5, Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks;
                                       AND
                                       S10.2     Where infrastructure is
                                       located on private land an
                                       easement is dedicated over the
                                       infrastructure in accordance with
                                       Section 4 of PSP5 Engineering
                                       Design Standards – Roads,
                                       Drainage and Earthworks.
14.165 Frontage Works
O11 Development is provided            S11.1 The following infrastructure       All necessary frontage works will
with external roadworks along          components already existing at           be constructed and will consider
the full extent of the frontage of     the frontage of the site or are          all      necessary    associated
the site to an appropriate             provided at the developer’s              infrastructure.
standard having regard to the          expense:
specified function of the road.        (a) full width sealed road;
                                       (b) concrete kerb and channel
                                            where appropriate;
                                       (c) forming and grading to
                                            footpaths;
                                       (d) vehicular kerb and footpath
                                            crossings;
                                       (e) a constructed bikeway;
                                       (f) a constructed footpath;
                                       (g) a constructed carriageway;
                                       (h) required alterations to public
                                            utility mains, services or
                                            installations;
                                       (i) construction of any required
                                            alterations to public utility
                                            mains,         services        or
                                            installations;
                                       (j) stormwater drainage works;
                                            and
                                       (k) installation     of     electrical
                                            conduits.
                                       AND
                                       S11.2 Road and drainage design
                                       and construction is in accordance
                                       with Sections 3 and 4 of PSP 5
                                       Engineering Design Standards –
                                       Roads, Drainage and Earthworks.


DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   19

Page 22

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




14.166 Road and Rail Corridors
O12     Noise sensitive uses           S12.1     Noise sensitive uses         An acoustic assessment has been
including residential uses are         including residential uses are         undertaken in relation to this
not subjected to high traffic          separated by a minimum of:             criteria.
noise levels from the major                 (a)   40m from the property       Please refer to associated report.
road network or rail corridors.                   boundary of roads
                                                  within the major road
                                                  network; and
                                            (b)   80m from the property
                                                  boundary     of    rail
                                                  corridors.
                                       OR
                                       S12.2 Development in the vicinity
                                       of road corridors meets the
                                       following external design criteria
                                       for roads in the major road
                                       network:
                                       (a) 63dB(A)L10(18 hours) based on
                                            predicted traffic volumes ten
                                            years hence;
                                       AND
                                       S12.3 Development in the vicinity
                                       of rail corridors meets the
                                       following external design level
                                       noise criteria:
                                       (a) 65dB(a), assessed as the 24
                                            hour average equivalent
                                            continuous A-weighted sound
                                            pressure level; and
                                       (b) 87dB(A) assessed as a
                                            single event maximum sound
                                            pressure level.
14.167 Staged Development
O13    Staged development is           No solution provided.                  Staged development is proposed
planned,       designed       and                                             and due consideration for required
constructed to ensure that:                                                   services will be allowed for.
(a) each      stage     of     the
    development        can      be
    constructed           without
    interruption to services
    and utilities provided to the
    previous stages;
(b) the infrastructure provided
    is capable of servicing the
    entire development; and
(c) the materials used are
    consistent throughout the
    development.
14.168 Alterations to Services
and Utilities
O14 Any alteration or repairs to       S14.1 Any alteration or repair to      Any      change      to    existing
infrastructure as a result of the      infrastructure as a result of the      infrastructure will be rectified at
development are made at no             development are completed at the       the expense of the developer.
cost to Council.                       developer’s expense.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   20

Page 23

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 19: WATER SENSITIVE DESIGN CODE

Table 14-58 Waste Management


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
Water Reuse

O1       Development uses a            S1.1 No solution provided.             The     development    uses    a
combination of detention and                                                  combination      of    detention,
retention systems to capture                                                  retention and re-use. We refer
runoff from areas on the site;                                                you to the concept stormwater
                                                                              report undertaken by Brown
AND
                                                                              Consulting dated October 2007.

O2 Water storage devices must          S2.1 No solution provided.             Assessment has been undertaken
have sufficient capacity having                                               in relation to water savings targets
regard to local rainfall pattern                                              applicable to the site. Communal
and the catchment area of roof                                                water tanks will be provided with
or other hard standing surface.                                               rainwater reticulated back to the
                                                                              units for use in toilets and
AND
                                                                              washing machines.

O3 Captured water utilised for         S3.1 Captured water is plumbed         Captured       rainwater   will be
all non-potable uses on site;          to be available for all external       reticulated back to the units.
                                       uses        including     gardening,   Excess stored capacity will be
AND
                                       irrigation, ponds, filling swimming    used for outdoor purposes and
                                       pools and outdoor cleaning, as         irrigation of landscape areas.
                                       well as all ground floor toilet
                                       cisterns and washing machine
                                       cold taps; and

                                       S3.2 Where the captured water is       A mains supply top-up system will
                                       used for toilet flushing and/or        be provided to ensure adequate
                                       laundry use, an automatic or           capacity is maintained for internal
                                       manual interchange device that         use.
                                       allows alternate use of capture
                                       water or the reticulation water
                                       supply is installed to ensure that
                                       there is a continual supply of
                                       water for sanitary flushing and
                                       laundry use.

O4 Onsite detention does not           S4.1 No solution provided.             Quality control measures will be
adversely impact on water                                                     implemented to minimise potential
requirements downstream of                                                    adverse impacts downstream of
the site where the water is                                                   the site – refer to Brown
required to sustain the ecology                                               Consulting Report Oct 2007.
and hydrology of downstream
systems (environmental flows);
AND

O5 Within the Shire Business           S5.1 No solution provided.             Not applicable
Centre site, as shown on Map
SBC,    on     site  detention
measures are contained within
the developed areas of the site,
clear of drainage lines and
Open Space precincts.

Run-off Treatment


DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   21

Page 24

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
O6 Run-off that leaves the site        S6.1 No solution provided.             We refer you to Brown Consulting
is treated so as not to adversely                                             report dated October 2007. We
impact on the ecology and                                                     note that bioretention swales,
hydrology      of    downstream                                               GPT and control ponds will be
environmental flows;                                                          used to treat run-off.
AND
O7 Within the Shire Business           S7.1 No solution provided.             Not applicable
Centre as shown on Map SBC –
(a) run-off treatment occurs
    within the site; and
(b) drainage lines are only
    used for final polishing of
    run-off.
Town       Water            Supply
Connections
O8 Backflow devices or similar         S8.1      A suitable backflow          Suitable   backflow   prevention
systems ensure water reuse             prevention device is installed to      devices will be installed in
facilities have no impact on the       protect the potable water within       appropriate locations of the
quality of the town mains water.       the reticulation water supply in       potable water supply.
                                       accordance       with    AS/NZS
                                       3500:2003       Plumbing      and
                                       Drainage.
Use of Natural Treatments and
Systems
O9          Natural    treatment       No solution provided                   We refer you to Brown Consulting
strategies,   including     grass                                             report dated October 2007. We
swales      and     bio-retention                                             note that bioretention swales,
systems, vegetated filtration                                                 GPT and control ponds will be
strips and gross pollutant traps                                              used to treat run-off.
are used where practicable;
AND
O10 Within the Shire Business          No solution provided.                  Not Applicable
Centre as shown on Map SBC,
where     necessary,    drainage
lines are ecologically enhanced
to ensure that the water quality
polishing functions are of high
standard.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   22

Page 25

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST




DIVISION 20: WATER SUPPLY AND SEWERAGE RETICULATION CODE

Table 14-59 Water Supply


Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
14.181 Design and Construction
(Water)

O1 Water Supply Infrastructure         S1.1 Water supply infrastructure       A water supply analysis has been
                                       is designed in accordance with         undertaken. The results of the
(a) Meets the needs of the
                                       Section 3 of PSP 6 – Engineering       study indicate that sufficient
    users;
                                       Design Standards – Water and           capacity is available for the
(b) Is designed to be                  Sewerage and As Constructed            proposed development.
    compatible with existing           data submitted in accordance with
    infrastructure; and                Section 7 of PSP 6 – Engineering
                                       Design Standards – Water and
(c) Is deigned using materials         Sewerage.
    that are suitable for the
    use, durable, easy to
    maintain and cost effective,
    taking into account the
    whole of life cycle cost and
    Council’s maintenance
    inventory.

O2 Water supply infrastructure         S2.1 Water supply infrastructure       All water supply infrastructure will
is constructed:                        is constructed in accordance with      be constructed and tested in
                                       Section 6 of PSP 6 – Engineering       accordance with Council
(a) in accordance with
                                       Design Standards – Water and           requirements.
    appropriate engineering
                                       Sewerage;
    standards; and
                                       AND
(b) to minimise adverse
    environmental impacts.

                                       S2.2 Erosion and Sediment              Erosion and sediment control
                                       control measures are designed          measures will be prepared as part
                                       and implemented in accordance          of the operational works (civil)
                                       with the Institution of Engineers      design drawings.
                                       Australia (Qld Division) Soil
                                       Erosion and Sediment Control –
                                       Guidelines for Queensland
                                       Construction Sites.

O3 Water supply infrastructure         No solution provided.                  Water supply infrastructure will be
is proven to be suitable for its                                              constructed and tested to
use prior to Council accepting                                                Council’s satisfaction prior to hand
the dedicated asset.                                                          over.

O4 Water supply infrastructure         No solution provided.                  Water supply infrastructure will be
is provided with all supporting                                               supported by all required technical
technical documentation.                                                      documentation.

O5 Where buildings or other            S5.1 The footing of any building       All existing infrastructure will be
structures are in proximity to         or structure is located clear of the   protected from the proposed
Council’s water supply                 zone of influence but no closer        works.
infrastructure, provision is           than 1.5m (measured horizontally)
made to protect the                    from infrastructure including
infrastructure from physical           sewers, water mains and
damage and to allow ongoing            stormwater structures.
maintenance by Council.
                                       AND



DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE     23

Page 26

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
                                       S5.2 A registered easement in
                                       favour of Council is created over
                                       all underground infrastructure
                                       located in private property;
                                       AND

                                       S5.3 The width of the easement
                                       is the greater of 3m or the width of
                                       the zone of influence;
                                       AND

                                       S5.4 The easement is centred
                                       over the centreline of the
                                       infrastructure.

O6 Alignment of water supply           S6.1 Infrastructure is designed        Detailed design considerations
infrastructure allows for easy         and constructed on the preferred       will ensure ease of maintenance
access for the ongoing                 alignments in accordance with          is achieved.
maintenance by Council.                Section 3 of PSP 6 Engineering
                                       Design Standards – Water and
                                       Sewerage.

O7 Any alterations or repairs to       S7.1 Any alterations or repairs to     Existing infrastructure will be
infrastructure as a result of the      infrastructure as a result of the      protected at all times. Any
development are made at no             development are completed at the       changes will be rectified at the
cost to the Council.                   developer’s expense.                   developer’s expense.
14.183 Design and Construction
Sewer

O8 Sewerage Reticulation               S1.1 Sewerage Reticulation             Sewer infrastructure will be
Infrastructure                         infrastructure is designed in          designed to cater for the intended
                                       accordance with Sections 4 and 5       load and will be compatible with
(a) Meets the needs of the
                                       of PSP 6 – Engineering Design          existing infrastructure.
    users;
                                       Standards – Water and
(b) Is designed to be                  Sewerage.
    compatible with existing
    infrastructure; and
(c) Is designed using materials
    that are suitable for the
    use, durable, easy to
    maintain and cost effective,
    taking into account the
    whole of life cycle cost and
    Council’s maintenance
    inventory.



O9 Sewerage Reticulation               S9.1 Sewerage Reticulation             Sewer infrastructure will be
infrastructure is constructed:         infrastructure is constructed in       designed in accordance with
                                       accordance with Section 6 of PSP       Council requirements and general
(a) in accordance with
                                       6 – Engineering Design Standards       engineering principles.
    appropriate engineering
                                       – Water and Sewerage and As
    standards; and
                                       Constructed data submitted in
(b) to minimise adverse                accordance with Section 7 of PSP
    environmental impacts.             6 – Engineering Design Standards
                                       – Water and Sewerage;
                                       AND




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE   24

Page 27

                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                     Proposed Measures
                                       (if code assessable)
                                       S9.2 Erosion and Sediment
                                       control measures are designed
                                       and implemented in accordance
                                       with the Institution of Engineers
                                       Australia (Qld Division) Soil
                                       Erosion and Sediment Control –
                                       Guidelines for Queensland
                                       Construction Sites.

O10 Sewerage Reticulation              No solution provided.                  Sewer infrastructure will be tested
infrastructure is proven to be                                                and inspected to Council’s
suitable for its use prior to                                                 satisfaction prior to hand over.
Council accepting the
dedicated asset.

O11 Sewerage Reticulation              No solution provided.                  All supporting documentation will
supply infrastructure is                                                      be provided.
provided with all supporting
technical documentation.

O12 Where buildings or other           S12.1 The footing of any building      All existing infrastructure will be
structures are in proximity to         or structure is located clear of the   protected from the proposed
Council’s water supply                 zone of influence but no closer        works.
infrastructure, provision is           than 1.5m (measured horizontally)
made to protect the                    from infrastructure including
infrastructure from physical           sewers, water mains and
damage and to allow ongoing            stormwater structures.
maintenance by Council.
                                       AND

                                       S12.2 A registered easement in
                                       favour of Council is created over
                                       all underground infrastructure
                                       located in private property;
                                       AND

                                       S12.3 The width of the easement
                                       is the greater of 3m or the width of
                                       the zone of influence;
                                       AND

                                       S12.4 The easement is centred
                                       over the centreline of the
                                       infrastructure.

O13 Alignment of sewerage              S13.1 Infrastructure is                Detailed design considerations
reticulation infrastructure is to      constructed on the preferred           will ensure ease of maintenance
allow for easy access for the          alignments in accordance with          is achieved.
ongoing maintenance by                 Section 4 of PSP 6 – Engineering
Council.                               Design Standards – Water and
                                       Sewerage.

O14 Any alterations or repairs         S14.1 Any alterations or repair to     Existing infrastructure will be
to infrastructure as a result of       infrastructure as a result of the      protected at all times. Any
the development are made at            development are completed at the       changes will be rectified at the
no cost to Council.                    developer’s expense.                   developer’s expense.




DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                         PAGE     25

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.