Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S8.5 Low impact construction
techniques are used around areas
of vegetation to be retained to
minimise interference with the
vegetation.
O9 Roads and stormwater No solution provided. Constructed road and drainage
drainage infrastructure is infrastructure will satisfy Council’s
proven to be suitable for its use requirements prior to hand over.
prior to Council accepting the
dedicated asset.
O10 Alignment of stormwater S10.1 The location, design and Infrastructure will be located for
drainage infrastructure is to construction of stormwater ease of maintenance, easements
allow for easy access for the drainage structures is in will be established where
ongoing maintenance by accordance with Sections 4 and 5 required.
Council. of PSP5, Engineering Design
Standards – Roads, Drainage and
Earthworks;
AND
S10.2 Where infrastructure is
located on private land an
easement is dedicated over the
infrastructure in accordance with
Section 4 of PSP5 Engineering
Design Standards – Roads,
Drainage and Earthworks.
14.165 Frontage Works
O11 Development is provided S11.1 The following infrastructure All necessary frontage works will
with external roadworks along components already existing at be constructed and will consider
the full extent of the frontage of the frontage of the site or are all necessary associated
the site to an appropriate provided at the developer’s infrastructure.
standard having regard to the expense:
specified function of the road. (a) full width sealed road;
(b) concrete kerb and channel
where appropriate;
(c) forming and grading to
footpaths;
(d) vehicular kerb and footpath
crossings;
(e) a constructed bikeway;
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public
utility mains, services or
installations;
(i) construction of any required
alterations to public utility
mains, services or
installations;
(j) stormwater drainage works;
and
(k) installation of electrical
conduits.
AND
S11.2 Road and drainage design
and construction is in accordance
with Sections 3 and 4 of PSP 5
Engineering Design Standards –
Roads, Drainage and Earthworks.
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.