                                                                     BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST



Specific Outcomes                      Probable Solutions                       Proposed Measures
                                       (if code assessable)
                                       S8.5     Low impact construction
                                       techniques are used around areas
                                       of vegetation to be retained to
                                       minimise interference with the
                                       vegetation.
O9     Roads and stormwater            No solution provided.                    Constructed road and drainage
drainage    infrastructure     is                                               infrastructure will satisfy Council’s
proven to be suitable for its use                                               requirements prior to hand over.
prior to Council accepting the
dedicated asset.
O10 Alignment of stormwater            S10.1 The location, design and           Infrastructure will be located for
drainage infrastructure is to          construction     of     stormwater       ease of maintenance, easements
allow for easy access for the          drainage     structures     is  in       will    be    established   where
ongoing     maintenance    by          accordance with Sections 4 and 5         required.
Council.                               of PSP5, Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks;
                                       AND
                                       S10.2     Where infrastructure is
                                       located on private land an
                                       easement is dedicated over the
                                       infrastructure in accordance with
                                       Section 4 of PSP5 Engineering
                                       Design Standards – Roads,
                                       Drainage and Earthworks.
14.165 Frontage Works
O11 Development is provided            S11.1 The following infrastructure       All necessary frontage works will
with external roadworks along          components already existing at           be constructed and will consider
the full extent of the frontage of     the frontage of the site or are          all      necessary    associated
the site to an appropriate             provided at the developer’s              infrastructure.
standard having regard to the          expense:
specified function of the road.        (a) full width sealed road;
                                       (b) concrete kerb and channel
                                            where appropriate;
                                       (c) forming and grading to
                                            footpaths;
                                       (d) vehicular kerb and footpath
                                            crossings;
                                       (e) a constructed bikeway;
                                       (f) a constructed footpath;
                                       (g) a constructed carriageway;
                                       (h) required alterations to public
                                            utility mains, services or
                                            installations;
                                       (i) construction of any required
                                            alterations to public utility
                                            mains,         services        or
                                            installations;
                                       (j) stormwater drainage works;
                                            and
                                       (k) installation     of     electrical
                                            conduits.
                                       AND
                                       S11.2 Road and drainage design
                                       and construction is in accordance
                                       with Sections 3 and 4 of PSP 5
                                       Engineering Design Standards –
                                       Roads, Drainage and Earthworks.


DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY                                          PAGE   19

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering report [As Published].pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.