Engineering report [As Published] · 132007.2398
BROWN CONSULTING (QLD) PTY LTD – SUNSHINE COAST
DIVISION 19: WATER SENSITIVE DESIGN CODE
Table 14-58 Waste Management
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Water Reuse
O1 Development uses a S1.1 No solution provided. The development uses a
combination of detention and combination of detention,
retention systems to capture retention and re-use. We refer
runoff from areas on the site; you to the concept stormwater
report undertaken by Brown
AND
Consulting dated October 2007.
O2 Water storage devices must S2.1 No solution provided. Assessment has been undertaken
have sufficient capacity having in relation to water savings targets
regard to local rainfall pattern applicable to the site. Communal
and the catchment area of roof water tanks will be provided with
or other hard standing surface. rainwater reticulated back to the
units for use in toilets and
AND
washing machines.
O3 Captured water utilised for S3.1 Captured water is plumbed Captured rainwater will be
all non-potable uses on site; to be available for all external reticulated back to the units.
uses including gardening, Excess stored capacity will be
AND
irrigation, ponds, filling swimming used for outdoor purposes and
pools and outdoor cleaning, as irrigation of landscape areas.
well as all ground floor toilet
cisterns and washing machine
cold taps; and
S3.2 Where the captured water is A mains supply top-up system will
used for toilet flushing and/or be provided to ensure adequate
laundry use, an automatic or capacity is maintained for internal
manual interchange device that use.
allows alternate use of capture
water or the reticulation water
supply is installed to ensure that
there is a continual supply of
water for sanitary flushing and
laundry use.
O4 Onsite detention does not S4.1 No solution provided. Quality control measures will be
adversely impact on water implemented to minimise potential
requirements downstream of adverse impacts downstream of
the site where the water is the site – refer to Brown
required to sustain the ecology Consulting Report Oct 2007.
and hydrology of downstream
systems (environmental flows);
AND
O5 Within the Shire Business S5.1 No solution provided. Not applicable
Centre site, as shown on Map
SBC, on site detention
measures are contained within
the developed areas of the site,
clear of drainage lines and
Open Space precincts.
Run-off Treatment
DEVELOPMENT APPLICATION (MCU): RSL CARE, TRADING POST ROAD, COOROY PAGE 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.