Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Planning Report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application - Cover letter & Planning report Email 1 of 8.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

    -    The Independent Living Units provide for at least 1 resident vehicle is to be garaged within
         each allotment. The predominant garage type will be a double.
    -    The site also provides for a minimum of 55 visitor car parking spaces. Please refer to
         alternative solution below.

For residential aged care facility -

    -    1 space per 4 residential aged care beds within the facility; AND

    -    1 emergency vehicle space.

Carparking is provided at the following rate:

    -    Provision has been made for 93 visitor. The location of the car parking spaces provides safe
         and convenient access to the redesigned facility.

Please refer to Site Plans in Appendix B demonstrating car park layouts and access arrangments.

6.6 Acoustic

The acoustic report submitted with the previous application is deemed to be acceptable and can be
conditioned to ensure the current development achieves compliance. A road and rail noise
assessment was conducted for the proposal. Rail traffic noise was assessed from Sunshine Coast Line
(Nambour and Gympie North). And Road traffic noise was assessed from Cooroy Connection Road
(Elm Street) onto the proposed development.

The results and recommendations of the assessment are as follows:

    -    Acoustic barrier for the full length of Cooroy Connection Road;
    -    Constructions materials and standards; and
    -    Mechanical ventilation in accordance with MP4.4 and the Building Code of Australia.

The height of the Acoustic barrier for the full length of Cooroy Connection Road is considered
excessive and visually intrusive. As was conditioned in the previous development approval the
acoustic barrier should not exceed 2.1m.

Please refer to Appendix E for the resubmitted acoustic report prepared by ASK for further details.

6.7 Waste Management

Waste management will be provided in accordance with Planning Scheme Policy 11.

 Management Plan                                    Outcome
 Estimate volumes of waste to be generated.         Volumes will be calculated for residential use
                                                    for each Stage.
 Estimated volumes of garden/organic waste.         Garden waste will be removed by a private
                                                    landscape/garden contractor.

Planning Report – Palm Lake Resort- Cooroy                                              Page 15 of 24
Log in to download the original file

Planning Report .pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.