Skip to the record
Accept no substitutions.

Original source · versioned page text

Planning Report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application - Cover letter & Planning report Email 1 of 8.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

7.3 State Development Assessment Provisions (SDAP)
After review of State mapping and the SDAP the following modules are considered relevant to the
subject site and proposed development:
      -   Module 19– State Transport Network Functionality
The proposed development is considered to comply with SDAP. Please refer to the resubmitted traffic
report at Appendix D for the completed SDAP Code.
8.0       ASSESMENT AGAINST THE NOOSA PLAN
8.1 Level of Assessment and Zone

The site is located in the Cooroy and Lake Macdonald locality plan and is identified as being within
the Community Services and Rural zones as seen in the zone map below.




                                             Site




                                                    Zone Map

As per the table of development (Material Change of Use) of the Community Services Zone of the
Noosa Plan, Multiple Housing - Type 3 Retirement and Special Needs is listed as a code assessable
consistent land use and therefore contemplated within this Zone. However, due to the inclusion of a
Rural Lot, it becomes an Impact Assessable application.

In response to the specific character statement and overall outcomes for the locality, the proposal
aligns with the intent of the physical setting, infrastructure provision and communities need. The
proposal provides a residential land use that meets the housing needs of the community through
catering for an ageing population. A small portion the development site is zoned rural, nonetheless
the proposal has sufficient merit despite the conflict with the zone.

8.2 Overlays

The proposal is affected by the following overlays:

      -   Watercourse and drainage lines; and
      -   Gas Pipeline and Easement Buffers.

It is considered that the development generally complies with the planning scheme provisions
relating to the overlays. The development maintains sufficient buffer distance from the pipeline and

Planning Report – Palm Lake Resort- Cooroy                                             Page 17 of 24
Log in to download the original file

Planning Report .pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.