Attachment 5 – Amended Landscape Architect Plans Material Change of Use for Multiple Dwellings (8 Dwellings) 25 & 27 Toolar Street, TEWANTIN QLD 4656 Lots 1 & 2 on RP73072 Concept Planning and Development Consultants ABN 99 789 542 467 26 Seafarer Drive, River Heads QLD 4655 : 0418531673 : [email protected] [OCR of page images] SMOLIN Attachment 5 — Amended Landscape Architect Plans Material Change of Use for Multiple Dwellings (8 Dwellings) 25 & 27 Toolar Street, TEWANTIN QLD 4656 Lots 1 & 2 on RP73072 Concept Planning and Development Consultants ABN 99 789 542 467 26 Seafarer Drive, River Heads QLD 4655 @: 0418531673 D4: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
Landscape Specification
GENERAL:
The landscape contractor is to check all drawings and report any ambiguities or anomalies
to the landscape architect for clarification as soon as practicable. No claim for extras arising
from failure to obtain clarification of such matters will be allowed.
Landscape drawings are to be read in reference to associated approved architectural and
civil drawings.
EXISTING SERVICES:
The landscape contractor shall locate any existing services before commencement of work.
PROPOSED
Any existing services damaged in any way as a result of the activities of the landscape
contractor shall be restored to its original condition to the satisfaction of the Project
Manager, either by or at the expense of the landscape contractor.
SITE MANAGEMENT:
DEVELOPMENT-
Ensure all vehicles leaving the job site are reasonable free and clean from soil and/or mud
Gympie
RUBBISH REMOVAL: Street
All rubbish including weed material and builders’ debris shall be removed from site and
disposed of in accordance with Council requirements.
PLANT MATERIAL:
Confirm at time of tendering that all plant material species, minimum sizes & numbers as
eet
scheduled, will be available. No substitutions to be made without approval. Crank S
treet Proposed
25-27 TOOLAR-STREET-
tr
Plants shall be well established with good form & free from pest & disease with large Development
Werin S
healthy root systems with a good root to shoot ratio, not pot bound & hardened off. Plant
il Street
TEWANTIN,-QLD
containers shall be free from weeds.
treet
Cullinan
All plants are to confirm to the ‘Natspec Specifying Trees - A guide to assessment of tree e Street Noosa
River
quality, 2003’
treet
Hendy S
Moorind
Street
Plants are to be inspected for quality and approved for delivery by a Project Manager and Tewantin
Primary
Butler S
Landscape Architect. School
Read
Goodwin
Park
SITE PREPARATION: Toolar S
Tewantin treet
Cultivate to the following depths; State Ward
School Park
· 200mm for turf Poincian
a Avenue
· 300mm for shrubs and groundcovers
· 800mm for trees
prior to backfilling with imported organic garden soil.
Imported garden soil must comply with AS 4419 (2003) Soils for landscaping and garden
use.
The organic material used in the soil mix must also be fully composted to ensure minimal
slumpage over time.
Backfill in layers compacting the soil regularly to minimise subsidence over time. Finish
imported soil 75mm below adjacent pavements after settlement.
PLANTING: Lake
Do not vary the plant locations from those shown on the drawings unless otherwise Doonella
directed. Obtain approval of setout before planting. Do not plant in unsuitable weather or
site conditions. excavate planting holes to a size that allows a minimum of 100mm site
topsoil backfill beneath & around the root system of the plant. LOCALITY PLAN
Landscape plans
Apply a slow release fertiliser, Everris Professional landscape Formula Flora - 8 to 9 months
Not to scale
, to manufacturers specifications at time of planting. Water immediately after planting &
thereafter as directed to maintain growth free of stress.
Plant numbers in mass planting areas have been calculated on the assumption that a death
rate of 20% is expected due to the current weather conditions.
Drawing List Prepared by
MULCHING: No Title
All garden areas are to be mulched with tea tree mulch to a maximum depth of 100mm
after settlement. Top up mulch, as and when required, to maintain this depth, at all times.
Mulch must comply with AS4454-2012 Composts, soil conditioners and mulches. 1 Title sheet, Locality plan + Landscape specification
2 Landscape + surface treatments plan
WATERING:
Deep Water all plants at time of planting & as directed thereafter during the maintenance
3 Landscape planting plan 1 of 3
period of the works for the establishment of the plant material. 4 Landscape planting plan 2 of 3
5 Landscape planting plan 3 of 3
MAINTENANCE PERIOD:
The maintenance period of 13 weeks for all softworks shall commence at the time of 6 Plant palette + schedule
practical completion & shall include;
· min 1 visit per week for the first 6 weeks
· min 1 visit per fortnight for the 6 weeks following
Works to be carried out during this period includes but is not limited to; watering, mowing,
PAGE 1 0F 6
weeding, fertilising, pest & disease control, re-seeding, re-staking, re-tying, replacement
planting, re-mulching, cultivating, pruning, aerating, renovating, top-dressing and keeping
the site tidy. ISSUE 3: December 1, 2021
[OCR of page images]
LANDSCAPE SPECIFICATION
GENERAL:
The landscape contractor is to check all drawings and report any ambiguities or anomalies
to the landscape architect for clarification as soon as practicable. No claim for extras arising
from failure to obtain clarification of such matters will be allowed.
Landscape drawings are to be read in reference to associated approved architectural and
civil drawings.
EXISTING SERVICES:
The landscape contractor shall locate any existing services before commencement of work.
Any existing services damaged in any way as a result of the activities of the landscape
contractor shall be restored to its original condition to the satisfaction of the Project
Manager, either by or at the expense of the landscape contractor.
SITE MANAGEMENT:
Ensure all vehicles leaving the job site are reasonable free and clean from soil and/or mud
RUBBISH REMOVAL:
All rubbish including weed material and builders’ debris shall be removed from site and
disposed of in accordance with Council requirements.
PLANT MATERIAL:
Confirm at time of tendering that all plant material species, minimum sizes & numbers as
scheduled, will be available. No substitutions to be made without approval.
Plants shall be well established with good form & free from pest & disease with large
healthy root systems with a good root to shoot ratio, not pot bound & hardened off. Plant
containers shall be free from weeds.
All plants are to confirm to the ‘Natspec Specifying Trees - A guide to assessment of tree
quality, 2003’
Plants are to be inspected for quality and approved for delivery by a Project Manager and
Landscape Architect.
SITE PREPARATION:
Cultivate to the following depths;
+ 200mm for turf
+ 300mm for shrubs and groundcovers
+ 800mm for trees
prior to backfilling with imported organic garden soil.
Imported garden soil must comply with AS 4419 (2003) Soils for landscaping and garden
use.
The organic material used in the soil mix must also be fully composted to ensure minimal
slumpage over time.
Backfill in layers compacting the soil regularly to minimise subsidence over time. Finish
imported soil 75mm below adjacent pavements after settlement.
PLANTING:
Do not vary the plant locations from those shown on the drawings unless otherwise
directed. Obtain approval of setout before planting. Do not plant in unsuitable weather or
site conditions. excavate planting holes to a size that allows a minimum of 100mm site
topsoil backfill beneath & around the root system of the plant.
Apply a slow release fertiliser, Everris Professional landscape Formula Flora - 8 to 9 months
, to manufacturers specifications at time of planting. Water immediately after planting &
thereafter as directed to maintain growth free of stress.
Plant numbers in mass planting areas have been calculated on the assumption that a death
rate of 20% is expected due to the current weather conditions.
MULCHING:
All garden areas are to be mulched with tea tree mulch to a maximum depth of 100mm
after settlement. Top up mulch, as and when required, to maintain this depth, at all times.
Mulch must comply with AS4454-2012 Composts, soil conditioners and mulches.
WATERING:
Deep Water all plants at time of planting & as directed thereafter during the maintenance
period of the works for the establishment of the plant material.
MAINTENANCE PERIOD:
The maintenance period of 13 weeks for all softworks shall commence at the time of
practical completion & shall include;
+ min 1 visit per week for the first 6 weeks
+ min 1 visit per fortnight for the 6 weeks following
Works to be carried out during this period includes but is not limited to; watering, mowing,
weeding, fertilising, pest & disease control, re-seeding, re-staking, re-tying, replacement
planting, re-mulching, cultivating, pruning, aerating, renovating, top-dressing and keeping
the site tidy.
roe ~ PROPOSED
DEVELOPMENT
25-27 TOOLAR STREET
Proposed ; :
Crank Street é
« Development
g ¥
¢ 8 Fy ee 2
Cullinane Stre o G Noosa
4 et 5 River
aie =
g . a % x S
5 Q Tewantin io
yn ~ + Primary C 6 4
. ~/G School F RS
oO Read a tg =
5 Park 1S De ai
a 3
Lake
Doonella
LOCALITY PLAN
Not to scale
Drawing List
No Title
Title sheet, Locality plan + Landscape specification
Landscape + surface treatments plan
Landscape planting plan 1 of 3
Landscape planting plan 2 of 3
Landscape planting plan 3 of 3
Plant palette + schedule
DukRWNeH
TEWANTIN, QLD
Landscape plans
PAGE 1 OF 6
ISSUE 3: December 1, 2021
Prepared by
—
nSite EM LA
51 Bromwich St
The Gap Qld 4061
abn; 89 115 47
Email: [email protected]
Page 3
Toolar Street
Street trees to road verge Screen to side of building;
in mulched surround -stainless steel trellis attached to the side Legend
-refer planting plan & schedule existing of the buildings with select vines planted in
power pole garden at ground level (min 200mm wide); Existing trees to remain
-refer planting plan & schedule
existing footpath
Letterbox panel with gravel surface Turf grass surface
and select pavers surrounding
lawn
RP Boundary RP Boundary Artificial grass surface;
Tiger Turf product or equivalent
Deep planting to frontage Tree plantings
-refer planting plan & schedule -refer planting plan & schedule Concrete driveway with exposed
aggregate ‘Stoneset’ banding for water
permeability & aesthetic quality
Screen trellis with climbing plants Pedestrian crossing pavers in concrete
-refer planting plan & schedule Open space Open space Screen trellis with climbing plants to match coloured concrete path (see
-refer planting plan & schedule below)
Informal hedge row of low height Driveway Coloured concrete footpath;
native shrubs Terrace Terrace Terrace Terrace Colour suggestion; CCS ‘Canvas’
-refer planting plan & schedue
Gravel surface;
‘Stoneset’ binder optional
Small to medium columnar trees Driveway surface; plain or light
along boundary for screening grey coloured concrete with Select pavers in 20mm ‘Coffs Harbour
-refer planting plan & schedule exposed aggregate bands using River Pebble’ with groundcover
‘Stoneset’ binder for stability & planting; pavers 600x600x40mm
water permeability. Free formed Mass planted & mulched garden beds
Low level plantings bands follow contours across -forest mulch or similar
Coloured concrete path
-refer planting plan & schedule driveway; approx min 500mm
wide, max 1200mm wide
Shade + amenity tree plantings
-refer planting plans
Low level plantings
Courtyard with gated access, -refer planting plan & schedule
Fence & gate to architects detail
pavers set in 20mm ‘Coffs
Harbour River Pebble’ & low level UNIT 1 UNIT 2 UNIT 3 UNIT 4
groundcover plantings Courtyard with gated access,
-refer planting plan & schedule pavers set in 20mm ‘Coffs
Court Court Court Court Harbour River Pebble’ & low level
Small screening shrubs along groundcover plantings
boundary fenceline gate gate -refer planting plan & schedule
Garage Garage Garage Garage
-refer planting plan & schedule
Small screening shrubs as per
opposite boundary
gate gate -refer planting plan & schedule
Pedestrian crossing; bands of coloured
concrete or min 600x400x40mm paver
Shade trees in mulched garden steppers set flush with concrete driveway;
bed with low level understorey Driveway to match coloured concrete path Shade tree in enlarged garden
plantings -refer planting plan & bed as for opposite boundary
RP Boundary
schedule Feature tree in raised planter -refer planting plan & schedule
-refer planting plan & schedule
RP Boundary
Courtyard with gated access, ‘Stoneset‘ binder used with select coloured
pavers set in 20mm ‘Coffs aggregate, installed on driveway surface
Harbour River Pebble’ & low level (example only)
groundcover plantings gate
-refer planting plan & schedule Garage Garage Garage Garage
gate gate
Carpark Carpark
Carpark Carpark Courtyard with gated access,
Small shade tree beside courtyard pavers set in 20mm ‘Coffs
in mulched garden bed on UNIT 5 UNIT 6 UNIT 7 UNIT 8 Harbour River Pebble’ & low level
boundary fenceline groundcover plantings
-refer planting plan & schedule -refer planting plan & schedule
Small to medium columnar trees
along boundary for screening gate
-refer planting plan & schedule gate
20mm ‘Coffs Harbour River Pebble’
(example)
Landscape +
surface treatments plan
PROPOSED DEVELOPMENT-
Terrace Terrace Prepared by
Shade trees in mulched garden bed Terrace Terrace
with low level understorey plantings Open Open Open Open
-refer planting plan & schedule Space Space Space Space 25-27 TOOLAR STREET TEWANTIN,-QLD
PAGE 2 of 6
Landscape plans ISSUE 3: December 1, 2021
[OCR of page images]
Street trees to road verge
in mulched surround
-refer planting plan & schedule
+
Deep planting to frontage
-refer planting plan & schedule
Screen trellis with climbing plants
-refer planting plan & sepesit
Informal hedge row of low height
native shrubs V
-refer planting plan & sche
Small to medium columnaleal
along boundary for screenii
-refer planting plan & sche
k
Low level plantings |
-refer planting plan & schedule
|
aaa.
a
Courtyard with gated access,
pavers set in 20mm ‘Coffs
Harbour River Pebble’ & low level
groundcover plantings
-refer planting plan & schedule
Small screening shrubs along
boundary fenceline
-refer planting plan & schedule
Shade trees in mulched garden
bed with low level understorey
plantings -refer planting plan &
schedule
|
Courtyard with gated access,
pavers set in 20mm ‘Coffs
Harbour River Pebble’ & low level
groundcover plantings
-refer planting plan & schedule
ee |
Small shade tree beside courtyard
in mulched garden bed on
boundary fe!
-refer planting plan & schedule
Small to medium columnar trees:
along boundary for screening
-refer planting plan & schedule
Shade trees in mulched garden bec
with low level understorey plantin
-refer planting plan & schedule
»
>
-
—+—
ou hit yl}
Baste te Bs Terrace
i )
~ .
Terrace
Toolar
aus,
Street
Driveway
poate see
Court
a ' “Sy,
A \
\
:
7 | NT iT
: rrace
7
SSeS
Garage
UNIT5
Garage
UNIT 6
Carpark.
1
Al cere e+ 1
4 '
‘ 1
\ M,
\
\
\
\
+
SPS emace
UU SA
ilerrace | || (eas se =
1) =
' 1
' !
' ; ' >)
' HH ' °°
' $ '
T ia
-—--=-4 poe | 4
i i |
} \ ' \ \ ar
~. #t = \ \
) 1 4 t
TO
4 LILLELLE -e HH | \
q =
, UNIT 3 UNIT 4 Ri
Nene
Court a. Pe Court
iD
Garage Garage
TEmMOM es Sky ee :
< ’ gate
a oan
= , asian” ing; bands of coloured ‘on
( — concrete (0x40mm paver 4 ¢
steppers set flush Wi
C Ohcrete driveway;
[1 to match coloure et h
— Feature tree in raised pla’
jes] -refer planting plan & sched an
Ee pe ; eS ghey
ee ae _"
Garage Garage
Carpark a Carga
UNIT7 J UNITs |
7 ‘
r X Jam
\
. 5
‘ t ‘
s
X 2 . a
a > 8
1 ~ eee ib-det acts asco
u l 1
> =3. ™ ~
ill [ } ~
Terra hit
I Ter Ee
4
5, S
™ oP . _ y
pe == 5
£
bs 79
RP Boundary
Screen to side of building;
-stainless steel trellis attached to the side
of the buildings with select vines planted in
garden at ground level (min 200mm wide);
-refer planting plan & schedule
Letterbox panel with gravel surface
and select pavers surrounding
Tree plantings
-refer planting plan & schedule
Screen trellis with climbing plants
-refer planting plan & schedule
ro
Driveway surface; plain or light
grey coloured concrete with
exposed aggregate bands using
‘Stoneset’ binder for stability &
water permeability. Free formed
bands follow contours across
driveway; approx min 500mm
wide, max 1200mm wide
Low level plantings
-refer planting plan & schedule
Courtyard with gated access,
pavers|set in 20mm ‘Coffs
Harbour River Pebble’ & low level
groundcover plantings
-refer planting plan & schedule
Small screening shrubs as per
opposite boundary
-refer Planting plan & schedule
Shade tree in enlarged garden
bed as for opposite boundary
-refer planting plan & schedule
Courtyard with gated access,
pavers set in 20mm ‘Coffs
Harbour River Pebble’ & low level
groundcover plantings
-refer planting plan & schedule
Landscape +
surface treatments plan
o 12 3 4 5
a
10
Legend
Existing trees to remain
_ Turf grass surface
Artificial grass surface;
Tiger Turf product or equivalent
Concrete driveway with exposed
aggregate ‘Stoneset’ banding for water
2? permeability & aesthetic quality
i Pedestrian crossing pavers in concrete
to match coloured concrete path (see
7 below)
Coloured concrete footpath;
Colour suggestion; CCS ‘Canvas’
Gravel surface;
‘Stoneset’ binder optional
Select pavers in 20mm ‘Coffs Harbour
River Pebble’ with groundcover
planting; pavers 600x600x40mm
Mass planted & mulched garden beds
-forest mulch or similar
Shade + amenity tree plantings
-refer planting plans
Fence & gate to architects detail
‘Stoneset’ binder used with select coloured
aggregate, installed on driveway surface
(example only)
20mm ‘Coffs Harbour River Pebble’
(example)
15m
—,
— ee"
Scale 1:200 A3
PROPOSED DEVELOPMENT
25-27 TOOLAR STREET TEWANTIN, QLD
Landscape plans
ISSUE 3: December 1, 2021
Prepared by
ite
PAGE 2 of 6
ee
Page 4
existing Toolar Street
power pole
2 ELA ret 2 ELA ret
street trees 8m min 3.5m min 3.5m min 8m min street trees
27 DIA LJ
12 HIB sca
12 LOM lon existing footpath
15 WES Mun
6 BAN rob 1 MEL qui
15 CAL pac lawn
(mass planted in RP Boundary RP Boundary
groups of 3 to 9)
3 MEL qui 1 MEL qui
3 PAN jas
3 TRA jas Open space Open space 3 PAN jas
in raised planter under trellis 12 PAN pan 3 TRA jas
12 TRA jas in raised planter under trellis
Terrace Terrace to trellis Terrace Terrace
30 CAL LJ 30 CAL LJ
Coloured concrete path
Driveway
3 PAN pan 3 PAN pan
3 TRA jas 3 TRA jas 3 BAN rob
12 CAL pac
18 DIA LJ
5 CAL Sli 5 CAL Sli 5 CAL Sli 5 CAL Sli 9 HIB sca
9 LOM lon
12 WES Mun
(mass planted in
groups of 3 to 9)
12 PAN pan
12 TRA jas
8 SYZ Hin to trellis 8 SYZ Hin
12 CAL pac 12 DIC rep 12 CAL pac
allow to cover
UNIT 1 UNIT 2 ground between UNIT 3 UNIT 4
pavers
25 VIO hed
12 DIC rep allow to cover
allow to cover Court Court Court Court ground between
ground between pavers
pavers Garage Garage Garage Garage
gates Example stainless steel trellis plant growing system for side of
25 VIO hed buildings as noted.
allow to cover
ground between
pavers
1 WAT flo Driveway 1 LIV dec 1 WAT flo
12 SYZ Hin Garage Garage Garage Garage 12 SYZ Hin
along boundary Carpark Carpark along boundary
Carpark Carpark
1 TRI lau 1 TRI lau
UNIT 5 UNIT 6 UNIT 7 UNIT 8
Detail A Detail B Detail C 1 TRI lau Refer sheet 6 for plant schedule
1 TRI lau
Landscape planting plan 1 of 3
Detail D
Refer planting plan 3 of 3
PROPOSED DEVELOPMENT-
Prepared by
for understorey planting detail
Terrace Terrace
Open Open Open Open
2 WAT flo Terrace Space -roofed -roofed
Space Space Space Terrace
-roofed
1 ELA ret -roofed 2 WAT flo
25-27 TOOLAR STREET TEWANTIN,-QLD
1 ELA ret 1 ELA ret 1 ELA ret
PAGE 3 of 6
Landscape plans ISSUE 3: December 1, 2021
[OCR of page images]
2 ELA ret
street trees
27 DIAU
12 HIB sca
12 LOM lon
15 WES Mun
6 BAN rob
15 CAL pac
(mass planted in s al
groups of 3 to 2 -
3 MEL qui ——
Ss: = i
in raigeiplanter under trellis jz PAN pan
A NY) sea it to trelli : Ut
30 CALLJ : Poess= #5) \) Terrace Terrace! |) 9 p= =o Sele aeotn til Merce Terrace
; ; 1 ~ i 7 i
I t Liv ! | 3 PAN pan J DaMeWay, | 3PAN pan Ie 2 .
\ jas , 3TRAjas t i
i ' LH =
: A ' ; i .
x lo] SCALSIi | SCALSIi lo SCALSIi
- | oe = r-+-5 --t=4 ‘ r-4-
a ilps Nl
.. ' i 12.PAN pan \ \ as ie \
- 7 12 TRA jas ) of 4
8SYZ Hin at to trellis LOT TTT
; f jauauauns ‘ TH
12 DilCrep 4 ae "
12 CAL pac "allow to cover .
gin id between F UNIT3 UNIT 4
\ i in r
12 DiC rep 3 ae len as ae
allow toleauen Court "a Court f Court
ground between Xe
pavers { sh
gatde ‘ oo oe Xe .
at 25 VIO hed z 7
I AGW CONE Ls
ground between
so pavers 7} ‘
ic}
1 WAT flo 1LIV jel
a :.
1]
|
~~ Wh .
| | “4 :
2 Svat Z - Pced [ Garage Garage We Garage Garage
along boundary -s
ann ‘Carpark I Carpark Carpark - EN
1TRI lau he I ~~
I 3 * Pale UNIT 6 i UNIT 7 UNIT 8
s r% = ‘
~ _- ‘
I 5 r bas 1S N : A ie Ee
‘
aad _ As b=
I 4 1a \ NJ ‘ ' i a NJ ipa
— \ .
Detail Ayo, ~Detail B ‘ ! |
L = & =< | = = al =
1TRI lau A \ a
y--- ‘ \ | el wre
a — Sz \
oO ws
' a \
may \ “nes ~ 335
—— \ ed
ma = — a \ ma a = ma =
Detail D™™* : \ =
= fr plan 3 of 3 TERS RIE TT Se
LU ‘ aii yee Terra nit
"9, j x | {
2.WAT flo rrace | @rmcted hs Terrac
I : fed -roofe
= I ! . \ 4 4
ey . ;
Be ° g
; n a
oT 7 ~ _ = an
2 ELA ret
street trees
1 MEL qui
1 MEL qui
3 PAN jas
3 TRA jas
in raised planter under trellis
30CALLI — -
3 BAN rob
12 CAL\pac
18 DIALJ
9 HIB sca
9 LOM Ion
12 WES Mun
(mass planted in
groups of 3 to 9)
8 SYZHin
12 CAL'pac
|
25 VIO hed
allow to cover
ground between
Pavers |
buildings as noted.
1 WAT flo
|
= ,
12 SYZ Hin
along boundary
1TRI lau
1TRI lau Refer sheet 6 for plant schedule
Landscape planting plan 1 of 3
o 12 3 4 5 10
a
al
Scale 1:200 A3
15m
Example stainless steel trellis plant growing system for side of
PROPOSED DEVELOPMENT
25-27 TOOLAR STREET TEWANTIN, QLD
PAGE 3 of 6
ISSUE 3: December 1, 2021
Landscape plans
Prepared by
—~n,
Site
Page 5
Refer planting Refer planting
plan 1 of 3 plan 1 of 3
for detail for detail
gate gate
7 DIA LJ 7 DIA LJ
mass planted mass planted
Refer planting plan 1 of 3
Refer planting plan 1 of 3 9 HAR vio & plant schedule for trees
& plant schedule for trees understorey
1 DOR exc planting 1 DOR exc
3 MEL aff 5 WES Mun
Refer planting plan 1 of 3
& plant schedule for trees
7 MYO par 7 MYO par
mass planted mass planted
Pavers
-refer surface treatments plan
5 AUS dul 5 WES Mun
25 VIO hed 25 VIO hed gate
9 DIA LJ gate allow to cover allow to cover 9 DIA LJ
25 DIC rep ground between ground between
allow to cover pavers gate gate pavers 25 DIC rep
ground between allow to cover
pavers ground between
pavers seat under tree
UNIT 6 UNIT 7 -indicative use
seating area
-indicative use UNIT 5 UNIT 8
5 CAL Sli 5 CAL Sli
5 CAL Sli 5 CAL Sli 9 DIA LJ
3 DIA LJ 3 DIA LJ
gate to gate to
rear of rear of
Refer planting unit unit
plan 1 of 3
for detail Refer planting
plan 1 of 3
for detail
Private courtyard planting detail A Private courtyard planting detail B Private courtyard planting detail C
Refer sheet 6 for plant schedule
Landscape planting plan 2 of 3
PROPOSED DEVELOPMENT-
Prepared by
25-27 TOOLAR STREET TEWANTIN,-QLD
PAGE 4 of 6
Example entry courtyards;
groundcover plants between pavers in stone
Landscape plans ISSUE 3: December 1, 2021
[OCR of page images]
Refer planting
plan 1 of 3
for detail
nid
& plapt’schedule fort
7 MYO par —
mass planted af Zee: 6
Pavers © ee
_ *tefer surface treatments plan.»
7
5 AUS dul
9DIALJ
-25DICrep *
allow to.cover, *
-ground:between »
payers: « %
seating area
-indicative use
Refer planting —>
plan 1 of 3
for detail
Private courtyard planting detail A
~ fi 25vI0 hed =
--allow to.cover
~ ground betwee
pavers. * 4
en ete Se
GE NOLS he
oN Me
* UNIT@
~SCALSI,
Example entry courtyards;
<2 SHAR Vio.
~ “understorey
‘,
pains
groundcover plants between pavers in stone
&
Z bes
Refe|
ae fof3. b
it le for trees: | -
~ allow to cover .*
~ ground between .,
oie) FUE
?
‘
2 UNITZ
~25vlOhed >
‘pavers Pre
25.DiC rep -
_allow:to-cover ~~.
- ground between
_ sPavers #3
SS UNITE
SS CALSH.
x. |
ek £ ££
Private courtyard planting detail C
Refer sheet 6 for plant schedule
Landscape planting plan 2 of 3
1 2
——————_—
Scale 1:100 A3
] Refer planting plant of 3 i
\& plant schedule for'trees 7
=
4m
Refer planting
plan 1 of 3
for detail
7 DIAL)
% mass planted
rh
OR exc
WES Mun
7 MYO par
mass planted
5 WES Mun
..
; [ 7, =
DIAL
seat under tree
iizaeative use
9DIALI
Ss é Refer planting
a 1 of 3
4i8 for detail
aS
PROPOSED DEVELOPMENT
Prepared by
oe
25-27 TOOLAR STREET TEWANTIN, QLD
PAGE 4 of 6
ISSUE 3: December 1, 2021
Landscape plans
Page 6
UNIT 6
29 DIA LJ
@2/m2
UNIT 5
3 ALP cae
@3/m2
Terrace
-roof over
3 ALP cae Refer planting plan 1 of 3
JOINS BELOW
@3/m2 & plant schedule for trees
Terrace
-roof over
4 CAL sal
7 DIA LJ
7 DIA LJ
Refer planting plan 1 of 3 3 BAE vir 5 ALP cae @2m2
& plant schedule for trees @1/m2
5 ALP cae Example extruded concrete garden edge
12 SYZ Hin profile to retain garden mulch behind.
along boundary 3 CAL sal
Colour as required.
RP Boundary
7 ALP cae 2 CAL sal
@3/m2
3 GRE HG 1 SYZ Str 2 GRE HG
Private courtyards planting detail D - Units 5 & 6
UNIT 7
UNIT 8
Terrace
-roof over Refer planting plan 1 of 3
& plant schedule for trees Terrace
-roof over
Refer planting plan 1 of 3
& plant schedule for trees
JOINS ABOVE
3 ALP cae
3 BAE vir 7 DIA LJ
3 ALP cae 7 DIA LJ
7 DIA LJ
3 ALP cae
RP Boundary
Landscape planting plan 3 of 3
1 CAL sal
1 SYZ Str
1 GRE HG 1 SYZ Str 1 GRE HG 2 CAL sal 1 CAL sal
1 GRE HG
Private courtyards planting detail D - Units 7 & 8
PROPOSED DEVELOPMENT-
Prepared by
Refer sheet 6 for plant schedule
25-27 TOOLAR STREET TEWANTIN,-QLD
PAGE 5 of 6
Landscape plans ISSUE 3: December 1, 2021
[OCR of page images]
29 DIALS
@2/m2
3 ALP cae
@3/m2
3 ALP cae
@3/m2
4CAL sal
JOINS BELOW
Refer planting plan 1 of 3 .
& plant schedule for trees
5 ALP cae Example extruded concrete garden edge
profile to retain garden mulch behind.
12 SYZ Hin — 5 Se © ! 3 CAL sal "
é , — ; w a Colour as required.
along boundary
>
RL 16.48] RRB Soy s o
n> TAIP cae
3 GRE HG 1 SYZ Str 2 GRE HG
Private courtyards planting detail D - Units5 &6
Se
UN)
i
said
"yy v/
il)
ar planting plan 1 of 3
edule for trees
JOINS ABOVE
Landscape planting plan 3 of 3
o 1 2 3 4m
1GRE HG NGREHG a syzstr 1 GRE HG 2 CAL sal ICAL sal Seale 1:100 A3
Private courtyards planting detail D - Units 7&8 ey
Refer sheet 6 for plant schedule PROPOSED DEVELOPMENT oi
25-27 TOOLAR STREET TEWANTIN, QLD
PAGE 5 of 6
Landscape plans ISSUE 3: December 1, 2021
Page 7
Trees - accent/frontage Plant schedule
Abbrev Botanical Name Common Name Qty Size Hgt
Trees
ACM hem Acmena hemilampra Blush Satinash 4 45L
ELA ret Elaeocarpus reticulatus ‘Prima Donna’ 4 45L
MEL qui Melaleuca quinquenervia Paperbark 5 45L
LIV dec Livistona decipiens Native ribbon palm 1 200L
TRI lau Tristaniopsis laurina Water Gum 4 45L
WAT flo Syzygium ‘floribunda Weeping Lilly Pilly 6 45L
Screening
ACM hem ELA ret MEL qui LIV dec TRI lau WAT flo
SYZ Hin Syzygium ‘Hinterland Gold’ Lillipilly 40 25L
SYZ Str Syzygium ‘Straight & Narrow’ Slender Lilly Pilly 2 25L
Screening Climbing
Climbing
PAN jas Pandorea jasminoides Bower of Beauty 36 140mm
TRA jas Trachelospermum jasminoides Star Jasmine 36 140mm
Shrubs & Groundcovers
ALP cae Alpinnia caerulea Native Ginger 29 140mm
AUS dul Austromyrtus dulcis Midyim Berry 5 140mm
BAE vir Baeckea virgata Twiggy myrtle 6 140mm
BAN rob Banksia robur Swamp bansksia 9 200mm
CAL LJ Callistemon ‘Little John’ Bottlebrush 60 140mm
SYZ Hin SYZ Str PAN jas TRA jas CAL pac Callistemon pachyphyllus Bottlebrush 51 200mm
CAL sal Callistemon salignus Bottlebrush 14 200mm
Shrubs + Groundcovers CAL Sli
DIA LJ
Callistemon ‘Slim’
Dianella ‘Little Jess’
Slender bottlebrush
Native Flax lily
40
156
200mm
140mm
DIC rep Dichondra repens Silver leaf 74 140mm
DOR exc Doryanthes excelsa Gymea lily 2 300mm
GRE HG Grevillea ‘Honey Gem’ Grevillea 8 200mm
HAR vio Hardenbergia violacaea False Sarsparilla 9 140mm
HIB sca Hibbertia scandens Snake vine 21 140mm
LOM lon Lomandra longifolia Mat Rush 21 140mm
MYO par Myoporum parvifolium Creeping boobialla 14 140mm
VIO hed Viola hederacaea Native Violet 100 140mm
WES Mun Westringea ‘Mundi’ Coastal Rosemary 37 140mm
ALP cae AUS dul BAE vir BAN rob CAL LJ CAL pac CAL sal CAL Sli DIA LJ
DIC rep DOR exc GRE HG HAR vio HIB sca LOM lon MYO Par VIO hed WES Mun
Note:
Plant species and quantities are subject to change prior
to installation of plant material due to stock availability.
Substitutions may be made with the approval of the
PROPOSED DEVELOPMENT-
Prepared by
landscape architect.
Plant palette 25-27 TOOLAR STREET TEWANTIN,-QLD
PAGE 6 of 6
Landscape plans ISSUE 3: December 1, 2021
[OCR of page images]
Plant schedule
Abbrev Botanical Name Common Name Qty Size Hgt
Trees
ACM hem Acmena hemilampra Blush Satinash 4 45L
ElAret — Elaeocarpus reticulatus ‘Prima Donna’ 4 45L
MEL qui Melaleuca quinquenervia Paperbark 5 45L
LIVdec __Livistona decipiens Native ribbon palm 1 200L
TRI lau Tristaniopsis laurina Water Gum 4 45L
WAT flo Syzygium ‘floribunda Weeping Lilly Pilly 6 45L
ACMhem ~ ElAret — " ~ . Screening
SYZ Hin Syzygium ‘Hinterland Gold’ Lillipilly 40 25L
SYZ Str Syzygium ‘Straight & Narrow’ Slender Lilly Pilly 2 25L
Screening
a ; , Climbing
Pe ( 7 PAN jas _— Pandorea jasminoides Bower of Beauty 36 140mm
i TRA jas =‘ Trachelospermum jasminoides Star Jasmine 36 140mm
Shrubs & Groundcovers
ALP cae Alpinnia caerulea Native Ginger 29 140mm
AUS dul Austromyrtus dulcis Midyim Berry 5 140mm
BAE vir Baeckea virgata Twiggy myrtle 6 140mm
BAN rob _ Banksia robur Swamp bansksia 9 200mm
CALL Callistemon ‘Little John’ Bottlebrush 60 140mm
CAL pac Callistemon pachyphyllus Bottlebrush 51 200mm
CAL sal Callistemon salignus Bottlebrush 14 200mm
CAL Sli — Callistemon ‘Slim’ Slender bottlebrush 40 200mm
DIA LJ Dianella ‘Little Jess’ Native Flax lily 156 140mm
DIC rep _ Dichondra repens Silver leaf 74 140mm
DOR exc _Doryanthes excelsa Gymea lily 2 300mm
GRE HG _ Grevillea 'Honey Ger’ Grevillea 8 200mm
HAR vio Hardenbergia violacaea False Sarsparilla 9 140mm
HIB sca __ Hibbertia scandens Snake vine 21 140mm
LOM Ion — Lomandra longifolia Mat Rush 21 140mm
MYO par Myoporum parvifolium Creeping boobialla 14 140mm
VIO hed Viola hederacaea Native Violet 100 140mm
WES Mun Westringea ‘Mundi’ Coastal Rosemary 37 140mm
ALP cae
DIC rep HAR vio. HIB sca MYO Par VIO hed WES Mun.
Note:
Plant species and quantities are subject to change prior
to installation of plant material due to stock availability.
Substitutions may be made with the approval of the
— PROPOSED DEVELOPMENT ~~ =»
Site
Plant palette 25-27 TOOLAR STREET TEWANTIN, QLD
PAGE 6 of 6
Landscape plans ISSUE 3: December 1, 2021
Used in these records
Attachment 5.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.