GIA application and Court Judgement Part 1 of 2 132006.268..02
een ee 18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and Sutherland, 19. dated October 2009 assumes a combined bottled/bulk water production volume of 24 ML/annum, which produces 7.2 ML/annum of waste water. If the production rate increases over 24 ML/annum, additional settlement ponds, chernical treatment and flocculation is required in addition to those measures specified in the Conceptual Effiuent Treatment and Disposal Strategy and condition 18A of this approval. These additional measures are to be achieved through larger (vertical) holding tanks and chemical dosing within the approved development footprint Erosion & Sediment Control , Any person acting on this permit shall prevent erosion and sediment export fram leaving the site. Site contro! measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works, Generali 20. 21. 22, 23. 24. For the following classes of work associated with development, a Development Permit for Operationa! Warks must be obtained prior to commencement of works relating to that class of work, The application may combine any or all of these classes of work:- * Access and/or Carparking. . Roadworks, ° Stormwater Drainage. . Frontage Works. . Erosion & Sediment Control A suitably qualified Registered Professional Engineer shal} prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. in this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Warks. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operationai Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council's Planning Scheme Policy PSPO5 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shail be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). As Constructed drawings and data shall be certified by a quatified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www,.adac.corn.au), Approval of works shail not be granted until all As Constructed information has been supplied and accepted by Council. Safe
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.