Original source · versioned page text
GIA application and Court Judgement Part 1 of 2 132006.268..02
10. A detailed SBSWMP including MUSIC modeling is required to support subsequent operational works applications for the site, and this will be based on civil design details. Objectives SEQ Regional Plan Implementation Guideline No.7 for Water Sensitive Urban Design. A detailed effiuent treatment and disposal strategy including MEDLI modelling is required to be Prepared to support subsequent operational works applications for the site. A detailed plant waste stream collection, testing and neutralization Strategy is required to be prepared fo support subsequent Operational works applications for the site. This Strategy . should include the provision of adequately sized holding/neutralization tanks on each waste stream including the Home Office delivery line and Retail line. A minimum of 7 days holding capacity shall be provided. Testing is to be carried out for quality compliance on a monthly basis. Parameters tested shall include nutrients, Cl, PH, faecal coliforms, COD. Off-site disposal is required if tank quality requirements cannot be met. Targets are to comply with WQ0O's for catchment. Awash down strategy with low water usage/high pressure cleaning and associated evaporation strategy shall be prepared to support subsequent Operational Works applications for the site. Any runoff from this system shall be discharged to the effluent treatment system. e POINTS OF DISAGREEMENT There are no points of disagreement. Signed: Neil Collins Ben Starr BEngCii), MEngSc, CPEng, MiEAuat, RPEQ BSc, Oip PM, CPESC 2-7. °F. A”. 7. 09
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.