Council archive · source document
000A88A4.006.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 04:17.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:19.
Guide 1Sentilled “Does my
application involve
aseessment of x water relisted
development?” will assisi in
answering this question.
9. - Does the:application trigger referral fo the Depertment of Natural: Resources and Mines.(NR&M} for
aon of operational work to take or interfere with water’ under the Water Act 20007
NO:
Guide 16 entitled: “lees ray
application invelve the
removal of quarry malarial
fronva watercourse? "will
assist in answering this and.ather:
questions relating fo.
development approvatof riverine
quarry maierial operations:
(Yes
10. Does the appication ‘tigger referral to the Department of Natural. Resources: and Mines (NR&M) for
assessment of development for the removal of quarry material.from.a watercourse under an
allogation notice given under the Water Act 2000?
a NO C1: yes
Guide-17 entitled “Does ny
apolication invelvea material:
change of.use fora Major
Hazard Facility or Possible
Major Hazard Facility?” will
assist in.-answering this question:
11: Does the application trigger réferral:to the Department of Emergency Services (DES) for material: change
ofuse fora Major Hazard Facility or Possible Major Hazard Facility as defined under te Dangerous:
Safely Management Act 2060?
NO CYEs
Guide 6 entitled “Dees my’
application trigger the referrai
coordination process?” will
assist in:answering this question:
42:. Does the application tigger referral coordination because the application involves: 3.or more
copcurrence-agencies?
NO C1 yes
Applications involving material
change of use assessable: under
the local governments planning
scheme and/or reconfiguring.a
lot may trigger this referral
Guide 6 entitled “Oses say
epplcation trigger the mferral
sooriinaiion process?” wil
assist in answering this question.
Referral agency responses.
srior to lodgement
Unders 3.3:2 of IPA a referral
agency-may give a referral.
agency response ona matter
within its jurisdiction abouta
propasal before an-application
for the proposal is made to the
assessment manager.
13. Does the application trigger. referral coordination because the application involves. a facility or area:
prescribed: under schedule 6 or-7-of the infegrated! Planning Regulation 1998?
One 1 Yes Deialhe tigger beow
SESE TRENMEET POS WITH ff SESiGr
ScnG 1G cae nay co TZERT SELOACGE OF 24 OR MoRE
EBRAwALErST CFRSoOmS,
novo poc rect nrc renee eet ag eget ge
SenF \. da peatecked acen CURR
14.Did a referral agency give a referral agency resporise under $:3.3.2 of {PA before the application was.
ie to the assessment manager?:
NO C1 ves Attach a copy of the'reférral agency/s response/s
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.006.tifRelated documentApplication case desk ↗
About this file
- File size
- 53 KB (small file)
- File type
- TIF
No other editions are linked here.