Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 18 - Regional Infrastructure Maps 1-14
The original of this document is very large (10.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Coastal Communities Local Plan Area
14
JOINS MAP 13 JOINS MAP 13 JOINS MAP 14-A JOINS MAP 14-A
JOINS MAP 13 , 5
LIMIT OF MAPS
LIMIT OF MAPS
JOINS MAP 5
Map A North Map B South
JOINS MAP 14-B JOINS MAP 14-B LIMIT OF MAPS LIMIT OF MAPS
Map Locator Pages 1 2
Regional Infrastructure Map
Noosa Shire
Disclaimer
1- Noosa Shire Part 1 Road Hierarchy Water Resources Major Energy Other Layers
Infrastructure
2- Noosa Shire Part 2 The information contained in this map
3- Noosa Shire Part 3 Arterial # Pump Station Facilities & Local Plan Area has been provided in good faith. Whilst all
4- Noosa Shire Part 4 6 Reservoir Facility effort has been made to ensure its
Distributor Gas Pipeline Corridor Boundary accuracy and completeness, Noosa Shire
!
!
5- Noosa Shire Part 5 7 Property Containing Bulk Council takes no responsibility for errors
Collector Water Facility Gas Pipeline Corridor Buffer Shire Boundary
Local Plan Areas or omissions nor any loss or damage that
!
! !! !! ! !
3 4 Local (200m) may result from the use of this
! !! !! !
6- Kin Kin Village 8 Water Treatment Plant & Cadastre
! !! !! !
! !! !! !
7- Boreen Point Village 9 Water Quality Facility
11 13 Major Electricity Transmission Waterbody
O
8- Cooran Village 12
9- Pomona Village Drinking Water Supply Line Corridor & Buffer (100m) Geocentric Datum of Australia 1994 (GDA94)
10- Cooroy 10
5 Map A Storage Major Electricity Infrastructure MGA Zone 56 (GDA_1994_MGA_Zone_56)
11- Tewantin
12- Noosaville 14 Water Supply Buffer Area ! Substations Approx Scale @ A3 1:20,000
13- Noosa Heads MapB Water Resource Catchment
14- Coastal Communities 0 125 250 500 750 1,000
Water Supply Pipeline
Map Code: OM-RI-14
Metres
Path: N:\07 Planning\19 Strategic Planning\New Noosa Plan - NNP\GIS\Community Consultation Map 2019\Planning Scheme\Maps\Infrastructure\NNP_Overlays_1_4_R_Infrastructure_CC.mxd
Page 14 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.