Original source · versioned page text
Attachment 2 - 1989 Approved Plans
Plans and drawings: the text below has words only, no drawings.
40mm EXPANSION JOINT 40mm EXPANSION JOINT. mA
BLOCKWORK .———>} TO EXPANDITE JOINT . BLOCKWORK\, ——=~ JO" EXPANOLTE YOTNTFILL, BLOCKWORK|, ———= IO EXBANOT TEC IOLATRILL .
1Oxi0 EXPANDITE “SECOSEAL 10xt0 EXPANDITE “SECOSEAL p* 10xE0 EXPANSIVE SECOSEAL
F72 FABRIC. F72_ FABRIC. :
30 TOP COVER. 30 TOP COVER. [ §0°re coven.
— o 1 +R )
O —inans 8 SS += re SS re
peu Oo ben © == py
L Cm : |
2 2
MIN. 50
750 WIDE 600 WIDE 3 C | MIN. 50mm SAND 3 CT MIN, 5mm SAND 3 LC TN MN, 590m Sano
wv SROSSING TO R410 HOOPS @ 400 CAS. NL Me
COUNCIL REQUIREMENTS 75 COVER TO HOOPS 10 HOOPS @ 300 CRS. R10 “n0ors e ise, GAS.
Toonesavesnsnensnsenen sensor ag peggy gen woe T S 600 c 5 75 COVER TO HOOPS. : 73,COVER, TO
3 Noeays2 BARS TO TOP 800 NO3-Y42 BARS TO. TOP 750 NDS-V1 BARS 70
Si & BOTTOM OF FOOTING, & BOTTOM OF FOOTING. SBot tom OF FOOTING.
450 WIDE STRIP FOOTING. 600 WIDE STRIP FOOTING. 750 WIDE STRIP FOOTING.
Z| Z SCALE 1=20. SCALE 1=20. SCALE 1=20.
s| =
w —
GRATED DRAIN. \ # A Ty
1 7 -
_l TW of a >
| 7 7 7 7 oer prea @.
| BLOCK PIER 5 BLOCKWORK.—31 40mm EXPANSION JOINT.
t WITH avo 2 £72 FABRIC. NOTE: WHERE WALLS ARE NOT RETAINING MATERIAL LEVEL 2. {|
x $ [ 30 TOP COVER. PLACE REINFORCEMENT TO CENTRE OF BLOCKWORK. FINISHED |
o 2 L 2 SURFACE LEVEL. -——————
. = S Ss ALL BLOCK WALLS FROM FOOTINGS TO FIRST SURFACE LEVEL 8
eS SSS FLOOR SLABS TO BE REINFORCED & CORE FILLED.
f —
: ALL BLOCK WALLS FROM FOOTINGS TO rapet | y
: D 2 | v12 HOOPS e 200 cas. OR SLAB BE 200 SERIES BLOCKWORK |-— 209, SEaTES_Lockwork
w “8 E g NOS-Y42 BARS TO TOP PROVIDE OPENINGS IN WALLS FOR SUBFLOOR ACCESS. CORE FILLED
a & BOTTOM OF FOOTING.
8 SOLID WALL : 75 COVER TO HOOPS. wsg,grieren oars Ll] 60
°o : rr a ®@ 400 CRS.
0 i 1200 45mm DEEP TOOL JOINT MADE | MITH BOLSTER 500 LAP) a
vv 1 : FILL_WITH SEALANT REFER SI “4
E fq ev EVERY ND STRAND IN, apni BELOW JOINT. T
cl ABA RE AB IS POURED
a! 2 S 4200 WIDE STRIP FOOTING. NARK’ FORM AT UDINT LOCATION 10. ENSURE
= ! 3 SCALE 4=20. WORK IS DONE ACCURATELY. °
: : 8
: 8
PAL : ' 3 st I | Y12 BARS @ 400 CRS, 8
1/ FHe'StRuctURAL. WORK SHOWN ON THESE DRAWINGS z ---B----- 5 -- - Me - - 3 8 a SELECTED GRAVEL VERTICALLY.
HAS BEEN DESIGNED FOR THE FOLLOWING LIVE LOADS: wi i]s 1 Z ,— 8 SELECTED
alt: ; a
‘AREA LIVE LOAD kPa allfiz ! — — —— BAAS @ 400 CRS.
SUSPENDED SLABS 2.00 18 ¢ F SAND "BEDDING. i =| vaates “ NSRIZONTALLYS
: ol |:2 ' g é | Co.p.m. | | APPROVED WATERPROOF |
STAIRS BALCONIES 4.00 || |e : 5 EX 75x75 TIMBER MOULD MEMBRANE . 40mm EXPANSION JOINT.
SYS DIRECTLY BELOW JOINT. 12 STARTER BARS. 40 EXPANDITE JOINTFILL.
WIND LOAD: ig o72 8 ARTE 40x10 EXPANDITE ‘SECOSEAL P*
a/ mers BURL BINS HAS BEEN DESIGNED FOR TERRAIN ‘S —— TOOLED JOINT DETAIL . (T . J.) 500 LAP. Frat F72 FABRIC.
REGSONAL BASIC WIND VELOCITY = S5m/sec cy cu 450 W3DE SCALE 1=40. gonm AGG. 30 TOP ot LeveL 4.
BRICKWORK & BLOCKWORK ross -- To ESF PIPE. fo
3/ ALL BRICKS “SHALL H TAVE AN ULTIMATE COMPRESSIVE : S 3
ALL-LOAD BEARING BRICKWORK SHALL HAVE A : We CGLUMNE ag BONGRETE | 40mm EXPANSION JOINT. £72 FABRIC. STARTER BARS TO an =
MINIMUM COMPRESSIVE STRENGTH OF 8.8 MPa : WAG : 30 TOP COVER. REFER TO_COLUWN DETAIL [ Jy MIN. SOmm SAND
4/ ALL BLOCKS SHALL HAVE A . CHARACTERISTIC : ' : E : | | : FOR NO OF B. BEDDING.
COMPRESSIVE STRENGTH (Fp) Pa. : 3 {|e Se : = beta pe
ALL LOAD-BEARING BLOCKWORK SHALL ty Obs 1 et|S : — 7 7 : =
GHARAGTERISTIC COMPRESSIVE STRENGTH (F'n) OF Blila Shae a : i
: z: : ‘
Silliz $7 ]) 2 : : TYPICAL RETAINING WALL DETAIL.
5/ MORTAR FOR LOAD BEARING BRICKWORK AND BLOCK- ‘z : : :
WORK ‘SHA ch BE 4 PART CEMENT: 4/2 PART LIME: OES AEINPORCE WITH 4 LAYER OF tw & a : : g
1/2 PARTS CLEAN SAND. MINIMUM 28 Wye 30 TOP Coven. — E ta : : a SECTION
ConpAESSIVE STRENGTH OF HORTEN Eo aes. 4 HP alts 8:11) : : _
—|, NO PLASTICIZERS TO BE USED UNLESS APPROVED BY ois EVilw i \ 2 SCALE 1-20.
aly: we a
6/ ALL PIERS AND WALLS WHICH ARE TO BE CONCRETE elite ' elie
FILLED SHALL HAVE CLEAN QUT BLOCKS LATO AT THE OTs Ee] || = L 3000 L L 2050 | -
ROGTING LEVEL AND ALL MORTAR QROPPINGS SHALL "BE wa {HE \ SHS t 1 1
REMOVED BEFORE CORE FILLING IS COMMENC w 450 WIDE : B Yi as @ 175 Yi8 Bans e 175 {et
et . + 1G
7" WoRAsG eLOckwone WITHOUT PEEOR APEROVGL OF tHe = PAD FOOTING - PF4 & PF3. 78 GOVER To BOTTOM 6 STOES. POST even 2
. . eS 450 WIDE . —
CONCRETE wo = ---+ LL lo,
8/ NO FLY ASH TO BE USED IN ANY CONCRETE. vw GUELY —— =
MINTMM COVER TO REINFORCEMENT UNLESS SHOWN : 410mm_ EXPANSION T —
OTHERWISE SHALL BE AS FOLLOW: JOINT. | STARTER BARS (B
. REINFORCED CONCRETE ___| F72 FABRIC. TO COLUMN. = \,
ELEMENT FORMED & NO COLUMN AS DETAILED. 3 \ =)
SREL TERED | ERPOSED™ |rontGonk 450 WIDE w ! : rot | : Hl 8 Hi-At0 BAR NZ
STRIP FOOTINGS = Somm 75mm 9 1 i Zo] SS 8 Ra aS ee ees @ 250 CAS.
COLUMNS 40mm SOmm 75mm . = \ : a a ee 7
WALLS AND SLABS 20mm 40mm 65am Ss \ : : S|
BEAMS 25mm 40mm 65nm a we ee eee ML LL 8 - } LEVEL 4.
be! ' : 3 T a
9/ NO HOLES, CHASES OR EMBEDMENT OF PIPES ovHeR 5 1 \a00 cos.
' SHALL BE RABE CIN GONGRETE MEMBERS. WITHOUT PALOR wl 2 ’ -
APPROVAL OF THE ENGINEER Os >! COLUMNS C1-C3.
Sle 3 : / SCALE 1=50.
2 ' : L 3400 | L 2450
so/ cee BRESSURE, OF” S00Kr. > BEEORE ANY CONCRETE 3} }]& 1 : 1 7 1 1 Y20 BARS @ 175 |
a x : ‘i S en
Brahe te BE Vi Tener REATING CAPACITY OF AEEORT, 3/2 1 : a ° TO} oes. MAK. CAS
- & _ ya ‘eoven TO BOTTOM & SI
IF ANY, FOR SPECIAL REGUIREMENTS. 600W é tw PAD ,EOOTING PFe.
11/ PROVIDE BAR CHATAS AT 600 CENTRES BOTH WAYS cap- ct
12/ cononeTe GOHPONENTS AND QUALITY SHALL BE AS 600 WIDE Aio Hoops. 480 250
ELEMENT stump | max. age.] Fic
. Y12 BARS TO TOP
SIZE__| wpa & & BOTTOM OF FOOTING.
FOOTINGS & GRouND | 50-100 20 20 S Y42 BARS TO TOP
FLOOg SLAB 600 WIDE & BOTTOM OF FOOTING. — Y12 BARS To TOP °
SUSPENDED SLAB 75-100 20 INT 25 & BOTTOM OF FOOTING. 3 ato Hoops ;
AND COLUMNS ExT 40 . 7 4+— 819, Hoos
@ 250 CRS.
DRIVEWAY 75-100 20 20 FOOTING & SLAB PLAN. 3 50 COVER 70
CORE FILL 4125-475 10 17.5 SCALE 4=100. 7 s Hoops.
$3/ FORMMORK SHALL BE_IN ACCORDANCE WITH A.S. 1509 . NO2-Y12 CORNER BARS TOP“S“BOTTOM~-— c= NOS=Y20.
ID SHALL REMAIN IN POSIT: Y42 CORNEA BARS TO TOP TO 450, 600 & 750 WIDE FOOTINGS. 4), ne
aN DAYS FOR WALLS AND COLUMNS & BOTTOM OF FOOTING. NO3-Y12 CORNER BARS i & BOTTOM *
34 DAYS FOR SLAgS TO 1200 WIDE FOOTING;
BEAMS .
ReFER ARCHITEETS DETAILS FOR FINISHES.
0 TOP.
14/ PROVIDE 2 LAYERS OF MALTHOID Y12 BARS T 6.
IMILAR BETWEEN ALL LOAD R10 HOOPS. & BOTTOM OF FOOTIN
BEARING WALLS AND CONC SLABS . 480 Y42_CORNER BAAS
10 TOF & BOTTOH oF :
FOOTI :
TYPICAL CHANGE. IN FOOTING WIDTHS cuan T
SCALE 1=20 TYPICAL F OOTING CORNER DETAIL TYPICAL FOOTING INTERSECTION :
SCALE 1=20. Le .
a ISG ‘
scales 1-400 1-50 1-20 i=40
SUNSHINE DESIGN CONTRACTOR TO VERIFY ALL DIMENSIONS |42 UNITS, FOOTING & SLAB soe a Salo ULB
DJ Brown & Partners Pty Ltd | surte 136 SUNSHINE BEACH AD ano LEVELS On woe erone CoMMENCNG | DOUGLAS STREET, PLAN /_ CONCRETE
Consulting Engineers NOOSA HEADS GLD 4567 sn nee OR MAKING ANY WORKSHOP |GSUNGHINE BEACH. DETAILS. 895022 001 A
: AW I i
88 Neil Street, Toowoomba z 2 NOTIFY ENGINEER IMMEDIATELY OF ANY job_number a puntee issue}
. eee
Queensland, 4350 (076) 328599 | sont ee pee ee DISCREPENCIES. Job shown _on_this_drawing sheet___of ened!
iif nT grape ip maT
“ ‘ 10 11 «#12 13 114 "ils 16 117 118 ile ak "ah ‘ae 213 24 215 216 2/7 28 219 30 WICROGRAPHIC -
jeeepni a meepeenieenn| pay UH my yy my Aya mn Uy Mapa Wny Hap Hy 1 mt APPLICATI IONS
2 3! 5
Inch 1 6 al al 10) 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.