11C Church St Issue 25 08-07-2022
Attached to the e-mail EMAIL 2 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.
SUSTAINABLE BUILDING DESIGN CODE RESPONSE SHELTERED COVERED OUTDOOR SPACE
600 WIDE EAVE
P01 DEVELOPMENT MINIMIZES ENERGY CONSUMPTION AND THE PRODUCTION OFGREENHOUSE GAS EMISSIONS
600 WIDE EAVE FOR SOLAR CONTROL
P01 PROPOSED OUTCOME PROVIDING PASSIVE SOLAR HEATING IN
WINTER AND SHADE IN SUMMER
THE DEVELOPMENT WILL REDUCE THE ENERGY NEEDED FOR IN-USE BUILDING BY UTILIZING THE FOLLOWING: SLIDING DOOR WITH
• MODERN ENERGY EFFICIENT ELECTRIC COOKING SECURITY SCREEN DOOR
• HEAT PUMP HOT WATER SYSTEM FOR STACK EFFECT
• SPLIT SYSTEM AIR CONDITIONING VENTILATION
• WALL AND ROOF INSULATION ABOVE MINIMUM REQUIREMENTS • ROOF TO BE FITTED WITH VENTILATING RIDGE CAPPING OR SIMILAR
• EAVES TO BE FITTED WITH VENTILATION GRILLS
PO2 DEVELOPMENT MAXIMIZES WATER EFFICIENCY ON SITE BY INCORPORATING RAINWATER COLLECTION AND REUSE MEASURES FOR • BATHROOMS, WIR AND KITCHEN TO BE FITTED WITH SOLAR TUBE SKY LIGHTS
NON-POTABLE PURPOSESSUCH AS IRRIGATION. • EXTERIOR WALLS TO BE FRAMED AND CLAD IN LIGHT WEIGHT FIBRE CEMENT
CLADDING REFER FINISHES SCHEDULE
P02 PROPOSED OUTCOME • ROOFING TO BE LIGHT COLOURED REFER FINISHES SCHEDULE
A STORMWATER MANAGEMENT PLAN FOR THE DEVELOPMENT IS INCORPORATED. REFER ENGINEERING • FLOOR TO CEILING HEIGHT 2.7m
PO3 DEVELOPMENT REDUCES STORMWATER RUN-OFF BY MINIMISING IMPERVIOUSAREAS AND MAXIMISING SITE VEGETATION TO ABSORB THE DEVELOPMENT WILL BE ASSESSED AND WILL ATTAIN AN EQUIVALENT TO A
WATER ON SITE. MINIMUM 5-STAR GREEN STAR RATING IN THE BUILDING APPROVAL STAGE AS
REQUIRED BY THE NCC.
P03 PROPOSED OUTCOME
DEVELOPMENT INCORPORATES WATER SENSITIVE URBAN DESIGN MEASURESTO MANAGE STORMWATER.
PO4 DEVELOPMENT LIMITS CHANGES AND DISTURBANCES TO THE SITE TOPOGRAPHY TO PRESERVE EXISTING DRAINAGE CHANNELS AS MUCH GRILLS OVER INTERNAL DOORS FOR
ASPOSSIBLE. HABITABLE ROOMS WITHOUT 2
P04 PROPOSED OUTCOME WINDOWS
DEVELOPMENT INCORPORATES AN EXSISTING CREEK WHICH WILL RETAINED AND THE BANKS OF WHICH WILL BE REHABILITATED AND
EQUATED TO 32% OF THE SITE AREA..
600 WIDE EAVE FOR SOLAR CONTROL
PO5 DEVELOPMENT MINIMISES HARD SURFACE AREAS THAT REFLECT OR STORE HEATAND MAXIMISES VEGETATION AND SOFT LANDSCAPING.
PROVIDING PASSIVE SOLAR HEATING IN
WINTER AND SHADE IN SUMMER
P05 PROPOSED OUTCOME ENTRY DOOR TO INCLUDE SECURITY
DEVELOPMENT INCORPORATES APPROX. 3750m² OF SOFT LANDSCAPING THAT EQUATES TO 50% OF THE SITE SCREEN DOOR FOR THROUGH
VENTILATION
PO6 VEGETATION IS INCORPORATED INTO THE BUILDING DESIGN TO CREATE SHADE AND COOLING AROUND BUILDINGS
P06 PROPOSED OUTCOME 1 TYPICAL
1 : 200
FLOOR PLAN
EACH UNIT INCORPORATES A GARDEN AT THE ENTRANCE AND REAR TO SHIELD AND SHADE THE UNIT.
PO7 DEVELOPMENT AND BUILDING SITING IS RESPONSIVE TO NOOSA SHIRE’S SUB-TROPICAL CLIMATE AND THE SITE’S CHARACTERISTICS
INCLUDING TOPOGRAPHY, ORIENTATION, EXISTING VEGETATION AND PREVAILING WINDS.
ADDITIONAL LIVABLE
P07 PROPOSED OUTCOME DESIGN FEATURES
• ALL DWELLINGS INCORPORATE A INTEGRATED GENEROUS INDOOR OUTDOOR COVERED PRIVATE PATIO IN
RESPONSE TO THE NOOSA SHIRE'S SUB TROPICAL CLIMATE. 2250mm DIA CLEAR OF FURNITURE TO
• THE DWELLINGS ARE ELEVATED FOR FLOOD PROTECTION FROM HEAVY SUB TROPICAL RAINFALL. ENABLE EASE OF MOVEMENT
• THE SITE IS SITUATED ON A SLOPE ADJACENT TO A CREEK, THE BUILT FORM IS LOCATED TO UTILIZE THE
LEVEL SECTION OF THE SITE AND PROVIDE LEVEL ACCESS TO ALL DWELLINGS.
• THE DEVELOPMENT HAS BEEN ORINTATED TO MAXIMISE THE VIEW TO MOUNT COROORA AND THE ADJACENT
CREEK. UNITS 1-7 HAVE PRIVATE OUTDOOR SPACE ORINTATED TO THE NORTH.
• EXISTING VEGETATION WILL BE RETAINED WHERE POSSIBLE UNDER ADVISE FROM EXPERT CONSULTANTS 10m² BEDROOMS EXCLUSIVE OR ROBES
AND THE EXISTING CREEK WILL BE REHBILATED AND REVEGETATED. WITH 1000mm ON SIDE OF BED
• PREVAILING WINDS IN POMONA ARE RELAVTIVELY LOW MAINLY FROM THE NORTH AND WEST DIRECTIONS.
THE UNITS HAVE BEEN DESIGNED TO CATCH THE PREVAILING WINDS TO AID IN VENTILATION.
CLEARANCE IN FRONT OF BENCHES
SLIP RESISTANT FLOORING
PO8 DEVELOPMENT -
(A) ORIENTATES BUILDINGS AND WINDOWS TO MAKE THE MOST OFPREVAILING WINDS, NATURAL VENTILATION AND CROSS BREEZES; HOBLESS SHOWER
(B) MAXIMISES SHADE TO EAST AND WEST WALLS;
(C) CONTAINS AN OPEN AND PERMEABLE BUILT FORM THAT CONNECTSINDOOR AND OUTDOOR SPACES IN AN INTEGRATED DESIGN;
(D) RETAINS EXISTING VEGETATION AND NATURAL SHADING WHEREPOSSIBLE; SHOWER LOCATED FOR GRAB RAILS
(E) INCORPORATES PASSIVE BUILDING DESIGN TO REDUCE THE NEED FORAUXILIARY HEATING AND COOLING; 1000 MINIMUM CLEAR PASSAGE
(F) USES LOW TOXIC INTERNAL AND EXTERNAL BUILDING MATERIALS;
(G)USES NATURAL LIGHT RATHER THAN ARTIFICIAL LIGHT, AND MAY INCLUDESKYLIGHTS, ATRIUMS AND LIGHT WELLS;
(H) CONTAINS A MINIMUM OF TWO OPENINGS PER HABITABLE ROOM; ALL DOOR 870mm WIDE TO PROVIDE MIN.
(I) PROVIDES A MINIMUM FLOOR TO CEILING HEIGHT OF 2.7 METRES; AND 820mm CLEAR OPENING
(J) ENABLES EFFICIENT OPERATION AND USE OF THE BUILDING.
P08 PROPOSED OUTCOME
REFER TYPICAL FLOOR PLANS
STEP FREE PATHWAY
2 TYPICAL
1 : 200
FLOOR PLAN
Address: No. Issue Details Date
BUILDING DESIGN Client: Drawing Name:
17 PRELIMINARY RFI RESPONSE 05-05-2022
AUSTRALIA WIDE Zaccale Pty Ltd 11C Church Street, Pomona QLD 4568 18 PRELIMINARY RFI RESPONSE 10-05-2022 SUSTAINABLE BUILDING
RESIDENTIAL
COMMERCIAL
22
23
PRE RFI RESPONSE
PRE RFI RESPONSE
30-05-2022
16-06-2022
DESIGN RESPONSE
RENOVATIONS 24 PRE RFI RESPONSE 04-07-2022
ACCESSIBLE Project: Property Details: 25 RFI RESPONSE 08-07-2022 Project number 11808
PH. 0405 097 553 Current Issue Date 08-07-2022
[email protected] Residential Multi Unit Development LOT 4 SP301620 7517m²
www.alldd.com.au Scale (A3) As indicated
VBA DP-AD 37989 Drawing no.
THIS DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALLDD. IT IS NOT TO BE PA115
QBCC 1084590 PLANNING APPLICATION RFI C COPIED, RETAINED OR USED FOR ANOTHER PURPOSE.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.