Slope Stability Report 26-5-2019 OPW19-0193
TRUBUILT
SLOPE RISK ASSESSMENT REPORT
4. RECOMMENDATIONS FOR DEVELOPMENT OF SITE
4.1 Site Preparation
The following recommendations are made for preparing the site for construction:
• Topsoil should be stripped from all areas where foundations and slabs will be constructed;
• Grass, shrubs and small trees should be cleared from the site, including large clumps of roots;
• Trees should be cleared with stumps and large roots grubbed from the site; holes created by grubbing
should be filled with Select Fill in accordance with Section 4.3;
• Sections of the site where foundations and slabs on grade are to be constructed should be proof
rolled to identify low strength materials;
• Where low strength materials are identified, they should be excavated and replaced with Select Fill in
accordance with Section 4.3.
Stripped topsoil may be used to rehabilitate fill batter slopes.
Where large trees, clumps of trees, old buildings, swimming pools, ponds, effluent disposal systems or other
significant moisture source is being changed prior to construction, then the site may be subject to abnormal
moisture conditions. Abnormal moisture conditions could be detrimental to the slope stability of the site.
Further guidance on site preparation can be found in Australian Geoguide LR5 Water and Drainage and LR8
Hillside Construction.
4.2 Foundation Design and Construction
Based on the results of the site investigation and risk assessment it is recommended that the foundations
should comprise punch pad pole foundations or strip foundations using the foundation design parameters
given in Table 3.
Table 3 - Foundation design parameters
Founding Layer Allowable
Foundation Type Comments
Name Capacity
Base of foundation to be not less
Pole base Weathered rock 175kPa
than 1 diameter into intact LS rock
Foundation to be proof compacted
and any wet, soft or heaving ground
Strip foundations Weathered rock 100kPa
excavated and replaced with
compacted Select Fill
When designing foundations care should be taken to ensure that future temporary or permanent excavations
do not damage the foundations. Guidance for design of foundations under these conditions can be found in
LEONTAKIANAKOS-R-001 Page 12 26 May 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.