Council archive · source document
PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041
From: Kerry
Sent: 26 Apr 2017 15:03:10 +1000
To: Mailbox Council Mail
Subject: Submission in opposition to the Development Application MCU 16/0153 &
REC16/0041
Mr Patrick Murphy,
The Assessment Officer,
Noosa Shire Council
[email protected]
Dear Mr Murphy,
Submission in opposition to the Development Application
MCU 16/0153 & REC16/0041
I write to oppose the approval of the above development application (DA). The grounds for
my opposition are listed below. However, I would just like to point out that Tony
Wellington had/has an opportunity to prove himself here in terms of his vision for this
municipality. We all know Sunshine Coast Council is fundamentally made up of developers
and determined to continue its agenda of development/growth at any cost…..there is big
money to be made. I attended a meeting at Sunshine Coast Council where Tony Wellington
stood firm and opposed a number of issued almost alone and it was clear he was at odds
with the culture of Sunshine Coast Council. He has since held my interest and attention and
I sincerely hope he reviews this application with objectivity and realises the uniqueness of
Peregian Beach and its people……lets cultivate a real differential gateway between
Sunshine Coast Council and Noosa Council.
1. History
The site, on which this development is proposed, was part of a caravan park which existed
in Peregian Beach from 1964. The current developer excluded permanent caravan
residents from the site and then claimed that the caravan park was not commercially
viable. For this reason, in 2009, the developer sought approval to build a commercial
building on the David Low Way part of the site and two unit blocks each of 16 apartments
and 30 of “beach shacks” behind the commercial building and the Peregian Beach Hotel.
This was agreed to by the developer and the Council at a mediation.
However, the developer was not satisfied with what he had agreed to and in 2011 went
back to the Planning and Environment Court to vary his agreed plans.
The development which the developer had had approved by the Planning and Environment
Court on 24 January 2012 was not economically viable. Apparently the developer was
unable to sell any of the “beach shacks” off the plan and the proposed mini-supermarket,
approved as part of that approval, was physically non-viable. With no pre-commitment the
developer did not proceed.
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
Subsequently, in 2013 the developer submitted a new development application (for the
area where the commercial building was approved) for a supermarket and four specialty
shops, this time, after discussion with the Peregian Beach community. This proposal, was
supported by PBCAI and the Peregian Beach community and was approved by Noosa
Council on 29 May 2014. It was a significant improvement on what the developer had
previously had approved.
The IGA Supermarket and the four specialty shops (the IGA supermarket development)
which was subsequently built is a positive benefit to Peregian Beach.
2. The Current Development Application
The balance of the caravan park site, after the IGA supermarket development, is what the
developer is currently seeking approval to develop.
Here it is important to reiterate the written advice to the pre-lodgement meeting held on
14 December 2016 (between Council and the developer):
The Open Space Recreation zone in Peregian Beach specifically seeks to protect and
retain the site for low cost visitor accommodation needs reflective of the site’s previous
use as a caravan park, but also acknowledges that a range of visitor accommodation
may be provided where integrated with budget accommodation. There is no support
given to permanent residents on the site.
It is noted that the current approval included only visitor accommodation, with no
permanent resident accommodation proposed. This approved development was
supported by Council through an appeal process as it was acknowledged that it included
low to mid cost visitor accommodation being a reasonable alternative to the Planning
Scheme’s intent to retain the caravan park.
It is considered the current proposal does not meet the Planning Scheme’s intent for the
site as there is a lack of and a limited range of visitor accommodation proposed…….
The DA does not reflect this advice.
The other thing to mention here is the Planning and Environment Court sanctioned
approval of 12 February 2010 of the now lapsed DA referred to above. At item 3 it stated:
The units shall operate in accordance with the defined use of ‘Visitor accommodation –
Type 4 Conventional’ in the Noosa Plan, which provides for short term visitor
accommodation. The units shall not be used for the purpose of permanent residential
accommodation, with the exception of two manager/caretaker’s units. The Community
Management Statement for any or all Bodies Corporate having control of the
development, or any part thereof, shall incorporate this requirement.”
The DA is totally in conflict with this approval as can be seen below:
The proposal:
Multiple Housing of 3 types – 88 Beds (or Persons)
They are all proposed for PERMANENT RESIDENTS.
The Kamala & Marram Houses (in the centre of the ring road) There are 9 of these
with 3 bedrooms. (27 persons). Carparking is 9x2. Estimated price $825K
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Page 3
The Wallum Units (along Rufous Lane). There are 7 of these with 3 bedrooms. (21
persons). Carparking is 5x3 and 2x2. Estimated price $725-800K
Reed Beach Houses (behind the Hotel) – There are 10 of these with 4 bedrooms
upstairs and living down. (40 persons). Carparking is 10x3. These units will be
approximately 6m below the Hotel level. Estimated price $850K.
Essence Hotel/(Motel) & Conference Centre – 40 beds
The developer proposes to develop and run the hotel with 20 visitor accommodation
rooms and 12 apartments (4 x 1 bedroom and 8 x 2 bedroom) which are described as
“multiple and visitor”. (40 persons). The 12 apartments are proposed for
PERMANENT RESIDENTS.
The Hotel will apparently employ 15 people (full-time and part-time) including
conference facilitators. The Conference room is small and apparently will seat 40. 40
Car parks are proposed with all bar 3 (Visitor parking?) under the Hotel and behind a
security gate.
3. Lack of compliance with the Noosa Plan
PBCAI’s Objection to the DA is firstly based on its lack of compliance with the Noosa Plan
Open Space Recreation zone requirements. PBCAI specifically seeks to protect and retain
the site for low cost visitor accommodation reflective of the site’s previous use as a caravan
park.
The Noosa Plan resulted from a community consultation process and was subsequently
approved by the State Government. It should not lightly be ignored by a developer being
granted an approval which significantly conflicts with the Plan.
In addition here, in order to obtain the Council’s previous approval, although it should be
stated that no attempt was made to get community approval, this same developer agreed
with conditions which kept the then proposed development in compliance with the Town
Plan (See above). Now that developer, six years later and having done nothing with the
approval, proposes another development in conflict with the Noosa Plan. Once again the
developer wants to change the rules for its financial benefit and not for the benefit of the
Peregian Beach community.
This DA proposes only 20 visitor beds in the Hotel/Motel. It does propose a further 12
apartments designated as “multiple and visitor” which the developer proposes to make
available for permanent residents although whether this on a lease or sale basis is
unknown. All of the 88 beds in the Multiple Housing are proposed to be for permanent
residents contrary to the Noosa Plan and the previous, now lapsed, approval.
I agree with the comment in the Information Request at page 12 of 13 “the limited range of
visitor accommodation proposed in conjunction with the primary use of the site for
permanent residential living remains a significant concern.”
This concern is increased by the fact that the commercial building, which the developer
replaced with the IGA supermarket, provided for visitor accommodation. Now this DA
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Page 4
provides for less visitor accommodation on the entire site than was originally sanctioned
by the Planning and Environment Court approval of 12 February 2010.
I have serious concerns about the density, site cover, gross floor area, planting area
and plot ratio having regard to the limitations in the Specific Outcomes for the
Eastern Beaches Locality (Semi-Attached Housing Zone). These calculations should
be based on a site area which excludes the land dedication included in the Court
Order approval (Appeal 25847 of 2008) but which does not exclude the land
associated with the Shopping Centre approval.
4. Staging
The Sprout Architects Staging Plan shows that the developer proposes:-
Stage 1 = Multiple Housing of 3 types
Stage 2 = Hotel/Motel
Given, the location of Stage 1 in a swampy area overlooking wetlands, at least 6 metres
below and behind the Peregian Beach Hotel to the east and the IGA supermarket to the
south, the developer’s suggested marketing of these houses at $725,000 to $800,000 must
raise real doubts as to whether or not any of these houses will be built. This is especially
the case if the developer requires a 60 percent pre-commitment before commencing
construction. Council, of course, could not consider the proposed pricing of these houses as
low cost or budget accommodation. While this is the developer’s risk, it has a bearing on
the completion of the proposed Stage 2 with the visitor accommodation.
Therefore, the completion of Stage 2, which contains the developer’s limited commitment
to visitor accommodation must be seriously doubted.
I ask that Council consider the sincerity of the developer in providing visitor
accommodation when it is left to Stage 2 and the developer’s record to date of having built
no visitor accommodation since 2009.
5. Disruption to Peregian Village and surrounding areas during construction if this
DA is approved
5.1 Engineering Services Report – Page 5 in Response 2B states:-
“There will be earthworks required to facilitate construction of stormwater treatment
facilities, sanitary drainage and allow for an aesthetically pleasing and functional built
form. There is little opportunity for fill material to be won on site therefore most of the fill
material will need to be imported”.
While the total amount of fill required does not seem to have been identified Figure 6
“illustrates the ‘swampy’ nature of the lower area of the site in the vicinity of the proposed
gabion wall” and states that “a fill wall of approximately 2.0m will be required”.
I agree with the comment at page 10 of 13 in the Information Request “that the extent of
filling of the site may need to be reduced.”
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Page 5
COMMENT: The imported fill will all have to come in via Sandpiper Lane and on the access
road to the IGA and the other shops. It will therefore, directly and significantly affect them
and the Hardware store. This will involve considerable noise and disruption from the
source of the fill to the development and return. It will also cause considerable disruption
to the roundabout at the village and to the Peregian Beach Hotel and other premises in that
area.
COMMENT: The importation of fill will result in the creek, which seems to have been
ignored in the DA, being diverted to run through the Council Reserve.
5.2 Engineering Services Report – Page 7 in Response 2B
I querys why water reticulation is proposed down the pedestrian access lane to the
Peregian Beach Sports Ground (Lot 75 on MCH839108) and a
Unity Water meter is proposed at the Peregian Beach Sports Ground boundary rather than
on the developers property
I also querywhy Electricity supply will be provided by “installing underground
infrastructure down the Peregian Sports Reserve access strip” rather than through the
developers property.
I query the contribution the developer will be required to make, if any, to the rectification
of this pedestrian access and the extent of any delay in the lighting and development of this
pedestrian access, which is supposedly underway at present.
6. Traffic
The DA proposes Carparking & Visitor Carparking of 115 space in total
67 with the Houses & 37 with the Hotel/Motel
4 in the west of the centre of the ring road
4 on the southside of the ring road behind the IGA
3 outside the security gate of the Motel.
This will result in an increase of 115 vehicles by the number of vehicular movements per
day over Sandpiper Lane with a considerable number of these increasing the use of the
Peregian Beach roundabout for vehicles going both north and south. This will add to the
number of vehicular movements per day over Sandpiper Drive arising from the IGA
Supermarket development without any enhancement of the ability of Sandpiper Lane to
cope with the number of vehicular movements per day.
The David Low traffic at Sandpiper Lane and the Peregian Beach roundabout is already
very heavy and PBCAI questions the ability of this section of David Low Way to carry such
an increase of traffic without creating difficulties.
7. Noise
The air-conditioning and refrigeration plant for the IGA are mounted on the roof of the IGA
store will be a source of noise for the residents of the Hotel/Motel. There will also be noise
from the IGA loading dock.
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Page 6
The air-conditioning and refrigeration plant for the Peregian Beach Hotel are mounted on
the rear of the Hotel. This will be will be a source of noise for the residents of the Reed
Houses who will be 6 metres below the ground level of the Peregian Beach Hotel.
I consider that the developer should be required to submit a noise mitigation plan agreed
between the Peregian Beach Hotel and the developer with a formal commitment by each
party to implement the plan, prior to any proposed development being considered by
Council. The implementation of the plan is to be certified by a suitably qualified and
independent acoustic consultant. It will be too late if Council approves the DA and the
Peregian Beach Hotel and the developer cannot reach agreement.
8. The Vista from David Low Way
It appears that the Hotel/Motel will not obscure the vista of the western mountains from
David Low Way. This vista needs to be protected. The accommodation units will be behind
and below the Peregian Beach Hotel by about 6m and, therefore, will not be visible from
David Low Way but it is important that they do not exceed the height allowed under the
Noosa Plan especially along Rufous Lane.
9. Sprout Architects Site Sections shows a 12m height above natural ground level
especially for Lot 12 which would appear to be grossly excessive.
10. Pathway through the development
It is proposed to provide a public pathway linking Rufous Lane with the IGA and the Motel
and through the Supermarket site to both Sandpiper Lane and David Low Way (via the
lift). This pathway is desirable if the DA is approved.
11. Sprout Architects Ground Floor Hotel – MPR? Meal Preparation Room?
I do not understand why the change from “Motel” to “Hotel” or whether or not this has any
significance.
12. Sprout Architects Reed House Section Analysis
I consider that the amount of solar access and ventilation is limited and inappropriate
according to this analysis. The number of hours of solar access that these windows and
open spaces will receive is not clear. The apparent inadequacy is caused by the developer’s
attempt to maximize the density and ground coverage of the site.
13. The Reed Beach Houses - secondary dwelling units
While I realize that the developer has provided a physical linkage from each secondary
dwelling to the main dwelling unit, the fact still remains that the secondary dwelling can be
locked off and separately occupied. If this occurs the secondary dwelling will require a
separate carpark which will not be available if the present DA is approved.
I submit that the secondary dwelling should either be removed in its entirety or, at very
least, the associated kitchen and living area should not be approved.
The current DA proposes that these Reed Beach Houses will be for permanent residents
and with 2 persons sharing each of four bedrooms that could result in 80 permanent
residents in the Reed Beach House alone.
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Page 7
As stated in the Information Request at page 9 of 13
“The proposed land use is a substantial variation from that which has previously been
approved on the site or is supported under the Open Space Recreation Zone. As the
proposed style of development is more consistent with that expected to be found within
the nearby Semi-Attached Housing Zone it is considered that the development should be
compatible to both the Specific Outcomes and Probable Solutions for the Eastern
Beaches Locality related to the Semi-Attached Housing Zone and the existing built form
and established character within Peregian Beach.
COMMENT: in the my opinion, the design for the Reed Beach Houses is upside down. The
bedrooms should be on the ground floor and the living areas on the first floor. This would
enable the living areas to have greater solar access and, if the secondary dwelling units are
removed, give them the possibility of some outlook, which is not available with the current
design.
14. Building Heights
As a result of the proposed filling of the site both the Multiple Housing dwellings and
Visitor Accommodation/Shared Housing building exceed the preferred maximum building
height. Of particular concern is the height of the Hotel/Motel building and how this may
affect vistas from David Low Way towards the National Park and Cooroy Mountain. If the
DA is approved, Council will need to specify the height of this building to ensure that the
vista is maintained.
15. Relevant period of approval
The first development application by this developer for this site was lodged in 2009. The
developer received the first approval for developing accommodation in 2010. Now in 2017,
the developer is seeking another approval to build, not budget visitor accommodation but,
in the main, permanent resident accommodation. In the intervening years, despite having
approval the developer has not constructed any accommodation units on the site. The
developer, therefore, since 2009, has deprived visitors to Peregian Beach of the low cost
visitor accommodation that the caravan park provided.
If Council were to approve this DA in any form, I request that the period of approval be
reasonable but short and that the staging be reversed to provide for the Hotel to be
exclusively for visitor accommodation with the possible exception of one or two
manager/caretaker’s units. I also request that the developer be informed that the period of
approval will not be extended.
For all of the above reasons I request that Council refuse this DA.
KERRY SIMMONDS
1/12 PLOVER STREET PERIGEAN BEACH QLD. 4573
PHONE: 0439 754 753
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
Used in these records
PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
About this file
- File size
- 124 KB (small file)
- File type
No other editions are linked here.